09 - DEMOLITION AND CODE ENFORCEMENT ACTIVITY REPORTSItem No. 9
Code Enforcement Report: 5/17/2016 — 6/22/2016
Cases Worked- 277
Lot Abatements- 200
Miscellaneous:
Abated 20 Illegal Dumping Sites
Abated over 20 Tires from Various Locations
Mowed Loop 286
Abated /Demolished Camper Trailer on Fitzhugh
Mowed the Fire Field
Buildings and Standards Report: May, 2016
5 Structures went before the Buildings and Standards Commission:
2605 Ridgeview
104 Bonham
205 NE 10th
151 SE 23rd
738 NE 5th
3 Structures was demolished in April, 2016:
724 Cedar
647 NE 12"
267 NE 28th