Loading...
09 - DEMOLITION AND CODE ENFORCEMENT ACTIVITY REPORTSItem No. 9 Code Enforcement Report: 5/17/2016 — 6/22/2016 Cases Worked- 277 Lot Abatements- 200 Miscellaneous: Abated 20 Illegal Dumping Sites Abated over 20 Tires from Various Locations Mowed Loop 286 Abated /Demolished Camper Trailer on Fitzhugh Mowed the Fire Field Buildings and Standards Report: May, 2016 5 Structures went before the Buildings and Standards Commission: 2605 Ridgeview 104 Bonham 205 NE 10th 151 SE 23rd 738 NE 5th 3 Structures was demolished in April, 2016: 724 Cedar 647 NE 12" 267 NE 28th