Loading...
09 - DEMOLITION AND ENFORCEMENT REPORTItem No. 9 Code Enforcement Report: 7/18/2016 — 8/16/2016 Cases Worked- 268 Lot Abatements- 380 Miscellaneous: Mowed /Shred Cox Field and Firing Range Abated 7 Illegal Dump Sites Cleared Fence Row Behind 2500 BLK of Ridgeview Removed Large Rubbish Pile in the 1500 BLK of Neathery Buildings and Standards Report: July, 2016 5 Structures went before the Buildings and Standards Commission: 424 Graham 965 E Polk 1808 Margaret 1823 E Cherry 1311 NE 14th Several Structures were demolished at American Plant Foods (SE 6th & Jackson).