Loading...
13 - RECEIVE AND DISCUSS UPDATE FROM PEDC ON SPEC BUILDING AT 2305 NW LOOP 286Item No. 13 TEXAS P_ R I S Economic Development Cotpomtion MEMORANDUM TO: Paris, Texas City Council FROM: Paris Economic Development Council j Michael Paris, Executive Direc DATE: September 21, 2016 RE: Suggested Conditions and Project Finance for Discussion During City Council September 26, 2016 Two conditions for discussion: A) The spec building cannot be leased without the approval of the Paris City Council B) The spec building cannot be sold without the approval of the Paris City Council PEDC will likely seek the approval of the following expenses from City Council: Bid: $738,380 Construction Contingency: $ 25,000 Bid Bond $ 10,880 Builder's Risk Insurance 2,040 Total Request: $776,300 1125 Bonham Street • Paris, Texas 75460 •903.784.6964 • Fax 903.784.2503 opayisedc@,paristexasusa.com wivw.earistexasusa.com • tivww.facebook.com /par-istexasusa •twitter: @paristexasusa PROJECT COST SUMMARY WORKSHEET - PROJECTED CURRENT SPEC BUILDING 23o5 NW Loop 286 PROJECT CATEGORIES PROJECT COSTS PURCHASE LAND AND BUILDINGS Acquisition — Land & Building $242,393 STTE WORK On -Site Work (Demolition) $35,000 Total REHABILITATION / CONSTRUCTION New Construction Costs Construction Contingency Fees, Bids and SIte Prep Costs $738,380 $25,000 $5,059 PROFESSIONAL FEES Design / Supervision $2,000 INTERIM COSTS (Bid Bond) Insurance, Title, etc, Builders Risk Insurance 3,750 sf metal building $10,880 $2,040 TOTAL Square Feet 'For City Council discussion 1 m1,000,7521 38,360 ■ r Business Park (May 12, 2015 PEDC Board Meeting) New Speculative Building Business Park Using the current bid as a cost estimate for the originally proposed spec building in the business park: Bid $738,380 Slab $205,762 Shell $532,618 Slab - $205,762 / 9,992 Sf = $20.59 Psf Shell - $538,38o / 38,36o sf = $14.03 Psf Proposed brand new spec building in business park: Slab - $20.59 psf X 20,000 sf = $411,800 Shell - $14.03 psf X 20,000 sf = $28o,600 TOTAL $692,400 Other comparable cost factors incurred if placed at the Business Park versus 2305 NW Loop 286: A) Sewer to slab B) 8" water to slab C) Power to property Total D) Gravel on drive /parking Estimate E) Concrete dock parking 3,600 sf (A - F) F) 3,750 sf metal building $175,000 18 acres facing Loop 286 frontage $100,000 Contingency $25,000 Bid Bond $10,800 Builders Risk Insurance $2,040 TOTAL OTHER COSTS $.112.840 Grand Total Square Feet 20,000 Overall Costs Per Square Foot $28 Overall Costs Per Square Foot $50 Updated 9/19/2o16 to co N CL a O J 3 Z Ln O M N c O L L O V C N O u 'a d N .E d 40 m o0 i cn M O C M W- ui r m N O N H O d m m � N E R* N Ln O N 0 N LL a c O Lfl O i N O a 3 o O C z O Ln CL o •U N a 0 a CL O CL a m t U 3 a c m CL C E m O au 00 , a c O N L m �• Ln CL t a c Ln 0 Ln c d O u r-4 aa+ �> O m � Q\1 O Ol O N L 'O C m N 3 Lri m I � -p a u a c C O u Ln H a E E a O C Ln O -6 U a O CL D_ 0. 3 X LU lD m LLr r `Id 0 0 O 0 q L � O O M O 0 0 0 0 ql:� 00 o 00 � m N o L 0 O � m O O O N in N tl} V/ a N N r o a T-1 Y m a 00 m in I IA. A o 1A O \ o L _ a c j O O a Cl m C m m CL Cr n. O L L- m c a �' 3 O ++ +, u, CL C C N U N N m L C m " ' a LL L 0 0_ a o o t0 E " O L O N O N On `^ 3 Y u =3 u 0 0 a O z L O u E > " CL E ° a o. `n Ln m z m u a o O M Ln .-, LSD c Ln z L v-- N U � }j Q a N N C 0 Ln CU O C X C O o a 3 m C a O r+ O O O O C a L N Ln of C CU m Q L o m ? a 'n m 41 O N Ln C4 `^ C u Ln O r.+ Ln L- 0 a. " O 2 ri m a 3 U r-+ d a N t�if N O cr L C + O a a Ln LCO z 41 +1 r•i a CC a M E C a O a-+ L L a a t tw m m U 4' 3 3 O U —vmi Q U m a H X X m a ° z Q c c O z O_ bo c c Ln o 0 0 w w a a 3 3 E E m m E O CL O L L N a H -0 Q Q O a Q! — — a v LL- C CL Q Q W W D D_ 0 0 H F- u Ln LD LD U 4 e-I e`i ci > 00 U 41 O Ln a z d p LL I ` a Ln C Ln LO 4 = ► OD O O a a Q Qj O o m o 0 m = rq = 3 3 L^ L e-I °' 4 O M c LU _ _ N > O O E E \ a_+ O "O C CL r-I CU t O Ol O N L 'O C m N 3 Lri m I � -p a u a c C O u Ln H a E E a O C Ln O -6 U a O CL D_ 0. 3 X LU lD m LLr r `Id a 2 2a3 a w LD LA LD LD LD LD r-4 � " r-I o O 0 0 0 0 0 \ \ LL 1 \ N \ \ m 19t LD r- I- LD LD of N M LA O ll N ct d• co N tI> -tn OO 00 00 N M. N c CL a 3 m O CL O Y Y Y LD ry tko 3 a 0 N N 00 V4 Ld N � Ln "4 � o c N LL O. N 41 O N 0 rn .-i \ OD C "a CC u a CL N O N N O v a E a 0 0 0 q L Ln O O O 0 0 0 0 ql:� 00 o 00 � m o L LLnn � � 0 � m O O O N N Ln N N r r"{ T T-1 m in I IA. A A 1 1A L L L j O N C C O L L- m cr aa) 3 3 a CL C C N N L C " ' 'L L LL u O O v ` `^ 3 3 u u =3 u u_ u E E ° ° o o. z m m L L- C U U � � N C o - -o o O C C O N y y c c C r+ O O O O C C m m o m m Q Q a E ' ? a 'n L] O O N N O O L LL w O OD v v a a r r-+ Q C C C C + ++ C CL m a a m m a a a a M E C a a-+ L L a a t tw m m Ln O U —vmi Q U m m H H X X m m m m L � — Q c c O O a bo c c Ln o 0 0 w w a a 3 3 E E m m E O O L L N N . .0 - -0 Q Q O O Q Q! — — a. L LL- C CL Q Q W W D D_ 0 0 U 4 00 41 Ln d O ` ` a a C C 4 = ► OD O O a a Q Qj o m m = = 3 3 L^ L g ° °' 4 4- 3 3 L c LU _ _ > O O E E a_+ "O C CL CU t to w w O O w U U U L Ln U U lD L l0 L LD L LD L LD La L LD L . .?• LD LD of N M LA O ll N ct d• co N tI> -tn OO 00 00 N M. N c CL a 3 m O CL O Y Y Y LD ry tko 3 a 0 N N 00 V4 Ld N � Ln "4 � o c N LL O. N 41 O N 0 rn .-i \ OD C "a CC u a CL N O N N O v a E a A- iFah� P I S /'10411 ,ih (Wiloti %!loll Bid Form to: Increase Existing Concrete Slab and Construct Pre - Engineered Metal Building Date: 08/04/2016 In accordance with the advertisement requesting bids for "Increase Existing Concrete Slab and Construct Pre - Engineered Metal Building" for the Paris Economic Development Corporation subject to conditions and requirements of the contract and scope of work, including any Addenda's. The undersigned proposes to complete all work called for in the Request for Bid within 180 days of a receipt of a "Notice to Proceed" for increasing the size of the existing concrete slab per specifications and constructing a pre- engineered metal building per plans located at 2305 NW Loop 286, Paris, TX 75460. Bid: $738,380.20 See attachment for exclusions. Total Increase Existing Concrete Slab and Construct Pre- Engineered Metal Building cost in Words: Seven hundred thirty eight thousand three hundred e Authorized Signature: 2'a-, "' Date: Title: Owner 20 /100Dollars. 08/04/2016 Company Name: Bobby Smallwood Construction Company Inc. Contact Person: Bobby Smallwood Title: Owner Phone Number: 903- 249 -1641 Email: bsmallwood1945 @gmail.com Page 9 Due: August 4, 2016, at 12:59 p.m. (CST) BOBBY SMALLWOOD CONSTRUCTION CO., Inc. 3116 STILLHOUSE ROAD PARIS, TEXAS 75462 ESTIMATE August 4, 2016 Paris Economic Development Corporation 1125 Bonham Street Paris, Texas 75460 RE: building located at 2305 N.W. Loop 286 Total Estimate: $738,380.20 Seven hundred thirty eight thousand three hundred eighty and 20/100 Dollars I have received Addendums #1 & #2. Exclusions: Temporary electrical service Painting Floor covering Plumbing Parking Landscaping Sidewalks over 384 sq ft. Electrical Sales tax Thank you for the opportunity to bid this project. 1p, A, Bobby mallwood BID PROPOSAL METAL BUILDING AT 2305 N.W. LOOP 286 •• PARIS ECONOMIC DEVELOPEMENT CORPORATION Cr C-3 N4 F-1 ^, " Y The information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED TO: Paris Economic Development Corporation ADDRESS: 1125 Bonham Street, Paris, Texas 75460 SUBMITTED BY: Bobby Smallwood Construction Co., Inc. NAME: Bobby Smallwood ADDRESS: 3116 Stillhouse Road PRINCIPAL OFFICE: [ X J Corporation [ j Partnership [ ] Individual [ ] Joint Venture NAME OF PROJECT: Paris Economic Development Corporation Building located at 2305 N.W. Loop 286 Paris, Texas 75460 TYPE OF WORK: [ X ] General Construction I j HVAC [ J Electrical [ ] Plumbing ORGANIZATION How many years has your organization been in business as a Contractor? 45 How many years has your organization been in business under its present business name? 15 Bobby Smallwood Construction Company Inc. Under what other or former names has your organization operated? Bobby Smallwood Construction If your organization is a corporation, answer the following: Date of incorporation: March 3, 2003 State of incorporation: Texas President's name: Bobby Smallwood Vice - president's name: Shirley Smallwood Secretary's name: Treasurer's name: If your organization is individually owned, answer the following: Date of organization: March 3, 2003 Name of owner: Bobby Smallwood EXPERIENCE List the categories of work that your organization normally performs with its own forces. Framing — Drywall — Ceilings - Finish Claims and Suits Has your organization ever failed to complete any work awarded to it? No Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? No Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? No Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? No Respectfully submitted, Bobby Smallwood Attachments: Experience, Project References last 5 years, and Reference contact information sheet Job Photos Bobby Smallwood Construction has been in the construction business for 45 years as a General Contractor. Specializing in Commercial, Industrial and Residential building. BSC pride ourselves on the quality of work we perform. We became a Texas state corporation on March 3, 2003. BSC is a member of the Texas Residential Construction Commission License #6961 for Texas /Lamar County. Experience: BSC is a turnkey General Contractor with experience in all trades from concrete, framing, insulation, drywall, finishing, painting, acoustic ceiling, tile, grid, roofing, exterior siding, masonry, electrical, plumbing and flooring, metal and all phases of construction. Proiect References last 5 years: Townes & Associates, Paris, TX. $2,500,000 Dollar General Stores, 17 locations $ 900,000 ea First National Bank, Tom Bean, TX. $ 988,000 Paris Cardiology Center, Paris, TX. $1,093,000 Sonic Drive -In, multi locations $ 600,000 ea Lamar Fabrications, multi locations $2,300,000 Paris Regional Medical Center (working for the hospital for the last 14 years on projects from $100.00 - $2.9 mil) Reference: Larry Townes — Business Owner — 903 - 737 -8852 Paul Wells — Owner CPA — 903 - 785 -8481 Bill Porter — PRMC — 903 - 737 -1111 Dick Serverson — Lamar National Bank — 903 - 785 -0701 INTERIOR RENOVATION ONLY TOM BEAN BANK TOM BEAN, TEXAS r Fwj4pi SONIC MANSFIELD, TEXAS PARIS REGIONAL MEDICAL CENTER CATH LAB NORTH CAMPUS INTERIOR RENOVATION BEHIND DOUBLE DOORS IN CATH LAB Fj -n L,� -1141 H, AOL. AJ z 0 L� 0 c� a 0 0 -� U � � N z w W � a (n s 0 � a Q � w N z w > c z w a z � ~ W a � 0 0 z o z 0 Z u w U) a a Z91SL 6DXB1 'ID111)d - -156C P-41-S 019 $dxil d 9Z90 -906 (f06) 1130 S331AU3S 9NIL"SO OLLr-GSL (f06) 301{40 3S3M -N AONVb NOLIdU►I..Mr�,.M.,,..KYEA 0 OWVONM3 SW-- d iNK � 1tl wlwm Mid v u sw-w El f f c� ' i IIUIIUIIA - r � = NNNIINfI �I =, NNINIIp SVM %Wd NMV K)cf= lN3WcIO-eAM OVX)O OJ3 Surd a Q M bmawi8 wkI1.Sf10M Mad V wm mvid E Z9Y9L GD"I 'trod — '416f 1609400S 019 BZSO -906 (rob) 1133 S30U83S ONUdVaO OLLC -994 (f06) 30LUO 35338 A AONV8 SVM %Wd NMV K)cf= lN3WcIO-eAM OVX)O OJ3 Surd a Q M bmawi8 wkI1.Sf10M Mad V wm mvid E ppa Y AR I e k d E k' �I R 1.. FI C UL 1 t i i i 7.94Si coxes 's�od — Lj16V 1SwtNnoS 019 SV)(31 `SkjVd s BZSO -906 (C06) 7130 53�IAa3S ONLLdtlaO NOLLVaOd0001N3�1dO -13A3a DIWONO03 SI»Vd Lota -sec (COO anwo 3S33a A AONVS bN mn a wkusrw3NI Mad V HOd SW-1d i G � d � a - 3 � N �= S 00 10 F IS rtuse *` R z y tC jWA Ii I i. ,T I 4 4 O �I L Oyg��y, f a I L I `w 1Ti 1 79 .R � wY,u P FHXle I w I E 6 g 4 i -_- 3 i� I ' — Li I Y k 3 1 1: ' I za -F � aY1rY 1 - I S M I wI 90 Jt � o+YV .t J iammoei a L V 11.1IM" I A z L 1 I I I - I i 110 \r td FHXle iammoei a L V 11.1IM" I A z L 1 I I I - I i 110 Mal 's NoLLVHocrjoo.LN3WdC)-SABG 30MON030 SI 'bWIM 'Pd M3N V HOA1 S LI e ggg x ° ��� P INN toa I 9Z90-906 (COO) 1733 S30IA83S ONU0 0 CALC-99L (C06) 371!.10 353311 A AONY0U Mal 's NoLLVHocrjoo.LN3WdC)-SABG 30MON030 SI 'bWIM 'Pd M3N V HOA1 S LI e ggg x ° ��� P INN toa I