Loading...
14 - AWARD FLOW EQ BASIN BARSCREEN PROJECT BID TO HARRISON, WALKER & HARPERItem No. 14 memorandum TO: City Council John Godwin, City Manager FROM: Doug Harris, Director of Utilities SUBJECT: AWARD FLOW EQ BASIN BARSCREEN PROJECT BID DATE: 04/28/2017 BACKGROUND: Bids for the flow equalization basin barscreen project were received and publicly opened at 2:00 p.m. on 04/27/2017. STATUS OF ISSUE: In lieu of a comprehensive rehabilitation project for the wastewater treatment plant, we have identified individual components by priority. The addition of a mechanical barscreen at the flow equalization basin was determined to produce the most immediate benefits. A barscreen will benefit both the wastewater treatment plant and the lift station division by removing debris from the waste stream, thus protecting pumps at the flow equalization basin and the master lift station, resulting in a decrease in equipment damage and maintenance labor. Harrison, Walker and Harper submitted the low bid of $966, 425.80. BUDGET: Department 86 — Wastewater Treatment; 10- 0901- 86 -98; $966, 425.80 is the low bid for the project; funding is distributed over three (3) budgets, fiscal years 2016, 2017 and 2018. RECOMMENDATION: Approve the low bid received, awarding the project to Harrison, Walker and Harper. CITY OF PARIS Flow EQ Basin Barscreen /HEI # 180070/Bid Opening April 27, 2017 @ 2:00 PM /Bid Tabulation CONTRACTOR BASE BID DEDUCTIVE ALTERNATE #1 (CONCRETE DRIVEWAY) DEDUCTIVE ALTERNATIVE #4 (304 STAINLESS STEEL) DEDUCTIVE ALTERNATE #6 (REPLACE STOP GATES) TOTAL HWH INDUSTRIAL $1,101,796.80 SUBTRACT $48,123.00 SUBTRACT $2,200.00 SUBTRACT $85,048.00 $966,425.80 J.S. HAREN CO. $1,187,000.00 SUBTRACT $30,000.00 SUBTRACT $2,200.00 SUBTRACT $61,000.00 $1,093,800.00