09 - STREET BOND PROGRAM PRESENTATION
Item No. 9 memorandum TO: Mayor & City Council FROM: John Godwin, City Manager SUBJECT: STREET BOND IMPROVEMENTS PROGRAM DATE: June 30, 2017 BACKGROUND: We have created a prioritized list of 22 street segments that have been identified as most needing reconstruction to one degree or another. As I described during the election cycle, these are not necessarily the streets with the absolute worst pavement in the city, but all are collector streets, so their reconstruction will impact the most overall traffic. Each is an asphalt street, and each will be replaced with asphalt. Some will necessarily include sidewalk, drainage, and utility work. Obviously we do not want to rebuild a roadway only to leave behind drainage problems, or have it dug up when a water or sewer line breaks. ADA comes into play with some sidewalk requirements. STATUS OF ISSUE: Most of the streets will be rebuilt using a construction practice called mill & overlay (or inlay). This is the type of work that was done on Collegiate in 2016, and is suitable for roads with adequate bases. Other roads will require full -depth reconstruction, a more expensive construction process that also includes significant engineering costs. Two roads, 33`d SE and Collegiate between Clarksville and Lamar, fall somewhere in a middle ground where full -depth would be preferred but not absolutely necessary. By doing only mill & overlay there, coupled with some new curbing and other improvements, we will get a much better driving surface that should last many years, while saving money to complete more projects. Attached is a draft three -year plan, showing all of the proposed streets. Year one includes four mill & overlay projects that can be done quickly and without outside engineering. They also have what we believe to be good utility structures under them, so we can proceed this calendar year. Also we will do in -house utility work on Graham so that it will be ready for repaving in 2018. Finally, we will hire an engineer to begin design on a full reconstruction of Church Street, work on which will occur in 2018. All of the 22 segments will likely not be able to be funded. BUDGET: Funding will come from 2017 bond proceeds, anticipated in late August. RECOMMENDATION: Direct staff to proceed with plan, along with any changes agreed to. STREET PROJECT CALENDAR 2017 E Cherry, 25 NE to 20 NE $136,500 3`d SE, Sherman to Provine $612,518 (with sidewalks) 7th NW, Graham to Center $289,354 7th SW, Washington to Bonham $187,950 Replace water line, Graham, 3`d to 7th Engineering design, Church 2018 Church, Hearne to Clarksville $2,340,277 Collegiate, Lamar to Clarksville (summer) $419,003 33`d SE, Lamar to Clarksville $508,243 Graham, 3`d to RR $291,375 Clement, Loop to N. Main $397,005 Washington, 7th SW to 1S1 SW $147,420 Fitzhugh, Hickory to Pine Bluff $956,708 (with sidewalks) Hickory, 20th NE to 25th NE $35,438 25th NE, Lamar to Hickory $822,541 (partial full- depth) E. Price, 201h NE to Collegiate $288,750 Engineering, 24th SE & 17th NE 2019 1St SE, Kaufman to Pine Bluff $218,768 (with sidewalks) 24th SE, Clarksville to Lamar $1,265,115 (full- depth) 17th NE, Clarksville to Pine Bluff $1,288,058 (full- depth) Kaufinan, 3`d SE to 7th SW $230,000 Hickory, Main to Fitzhugh $259,875 Tudor, 3`d NE to Fitzhugh $280,035 Graham, RR to 19th NW $1,914,750 Document Name: 2017 Street Improve me nt Projects -Tab bid L S - LEGEND W PARK �NLVN i W CENTER Document Path: S:\citydata \GIS_Basemap\Map MXDs\2017 Street Improvement Project s\2017 Street Improvement Projects - Tabloid LS - LEGEND.mxd RRIYEI 12 u wN�OE 2 C Z Z g JOHNSONST R i V = � CAESC $D = 1 N K IY a MLK IY ■.� WMENDERSON HL F 2 Z°Z W F Z 2 €2 COOPER WGARRETT EWNDERSON F ASH VAR ZPNOT a MAX STD ° Q9 y FRANKLIN Z FRANKLIN € E GMRETT YI Y O WLONG � � � ^ k � OROVE y%,PR WLONG CAMPBELL L €NG L 2 ° GROPE GROVE ICI ONO = (AIriAX A S� 2 2 G MPBELL " n I c WPRO VINE Eqt OV NCE � f 20VNCE IFI BELMONT � HGNU WARMER VALIER - Z OIAR X21 2 SH LO H p E1000 R KIM 2 SHLOH F Z N € 2- € BOOTH &Y m EBOOTH M O Z F 2 € WBOOTN Z 2 ' r BDOTN PIC ti € EBOOTH y1I WCHERRV Z z S 2 weooTH _ x F " Z 2 2 22 Z �I EBOOTH � � � n_EOIERRI " Z PLUM t 2 WCHH3RY WCH-RY OIERM 5 EOIERIry EOIERRY IY = LE Z € RUN22 DC,�ONA Z Z 2 O 5 FIRE BLUFF RNE BLUFF Z � uJ Z 2 2 GRNINA WHOUSTON K Z 22 NAPLE AVE Z 2 BONHAM 2 r WK WAUSTN WALISTN 2 WSHERMAN W BMME OLD BON— Fx 2 �' RUM_ n f till,� E PItCE z f ,,, E PRCE Z W P E CE S(ON Z WHOUSTON AASHBBY WHOUSTON O ENDUSTON WFNOR Z UM4RBONHAM w( HLLARD JONEB KAUFMAN - �3 FORt ° H1BBARD AUSTIN W TN W T EAUSDN ( EVEUND ' G.EVELAND LF SPFARV MRR WOODLPWN� WOOOLAWN € E OJLBERTSO WSIERIMN 5 91ER ESHEMAN € OG*0 MmPSDN EBRAME BROWN WB NE ATHE RY WSRAME BRA HEARON IEMRON ,EARON IN o A W Bpa qE - Z HE ON _e O �, PCHREM IV, EWASHNGTON EWiSHNGTON Wi E WASHNGTON �( WWASHNGTON PAR 4; 2 E, EPOLK %H A B E POLK ^ E FOLK E NLK BROWN df CEDAR ST I jk Z BROWN LONG q " G OM ST FRISCO .RCKSON ST JACKSON ST tm - - - .ACKSON sli W HEARN E Z TRNL DE PAgS o = g IK .ACKSONCT; ; ALLEGE SYCALIOW SY MORE BELUVSrq O SYMNORE RT = Lamar County tM SYgyO. PARIS BLVD ORANGE M EFEAGLE w OLDJEFFERSON W NEAGLE �I 0 4?,4,1 Paris, TX Esri, HERE,DeLorme, Mapmylndia,© OpenStreetMap contributors, and the GIS user community,_ .. U 0 J a ELD IN E IN City or County Roadway 0?1 ASPEN aEe 6 ° orK° FAIR OAKS O WOOD HOLLOW E CENTER 0,16 KESSLER �Q KESSItR� 'MESS BALLARD BRMRWOOD BNARWOOD .T� �i BRMRWOOD RIDGEV E W q DGEV E W IQ A PINE MILL EHOWNWOOD UP W000LAND CLEMENT OAK $T RENO gFARGp x F VAGA$ e MILLER e NEVAOA 'Y RJBY 7 ECHERRY Z e n Z MALNUT M� YI to aKIN p RMBLUFF RNE BLUFF n W Y ROBIN Ii E FD ISTON n f x RAVE Y W W moo C NA RG MET MARGARET N 1 HJBBARD HUBBARD Q S VE QE LA C M >K ALLEN V,2 0 2r5 QARK QARK IA lW DUBON MAMFFEY ABBOTT C ABBOTT J 01 ODE Ui STAGY HYDE W, Rye, W N•R�NL E TRNLDE PAPoS "s Date: 7/52017 ZkF .EFFERSOry 1 inch = 2, 000 feet State Roadway B YORK Municipal Boundary - Paris, TX A SE LOOP TSB l 5,200 2,600 0 5,200 Feet Z r ?0M 2017 Street Improvements #1 - Church St. - E.Hearn Ave. To Clarksville St. #2 - Collegiate - LamarAve. To Clarksville St. #3 - SE 33rd St. - LamarAve. To Clarksville St. #4 - E.Cherry St. - NE 20th St. To NE 25th St. #5 - SE 3rd St. - Sherman St. To Provine St. #6 - NW 7th St. - Graham St. To Center St. #7 - SW 7th St. - W.Washington St. To Bonham St. #8 - SE 24th St. - Lamar Ave. To Clarksville St. #9 - Graham St. - Railroad To NW 19th St. #10 - NE & SE 17th St. - Pine Bluff St. To Clarksville St. #11 - SE & NE 1 st St. - E.Kaufman St. To Pine Bluff St. #12 - Clement Rd. - N.Main St. To NE Loop 286 #13 - Kaufman St. - SE 3rd St. To SW 7th St. #14 - W.Washington St. - SW 7th St. To SW 1st St. #15 - Fitzhugh Ave. - Pine Bluff St. To Hickory St. #16 - Hickory St. - NE 20th St. To NE 25th St. #17 - NE 25th St. - LamarAve. To Ballard Dr. #18 - NE 25th St. - Ballard Dr. To Hickory St. #19 - E. Price St. - NE 20th St. To Collegiate Dr. #20 - E.Hickory St. - N.Main St. To Fitzhugh Ave. #21 - Tudor St. - NE 3rd St. To Fitzhugh Ave. #22 - Graham St. - NW 3rd St. To Railroad Improvements by Year YEAR Project Begins —2017 —2018 —2019 W OAK E E OAK 1!I W PARK 2 2 E CEN E ECENTER V W 2 W W R RN = = O O W PARK Y Y _ _e WHGNOR y y� _ a M M� Yil EWLLAMS '' a G MPBELL " n I c WPRO VINE Eqt OV NCE � f 20VNCE IFI BELMONT � HGNU WARMER VALIER - Z OIAR X21 2 SH LO H p E1000 R KIM 2 SHLOH F Z N € 2- € BOOTH &Y m EBOOTH M O Z F 2 € WBOOTN Z 2 ' r BDOTN PIC ti € EBOOTH y1I WCHERRV Z z S 2 weooTH _ x F " Z 2 2 22 Z �I EBOOTH � � � n_EOIERRI " Z PLUM t 2 WCHH3RY WCH-RY OIERM 5 EOIERIry EOIERRY IY = LE Z € RUN22 DC,�ONA Z Z 2 O 5 FIRE BLUFF RNE BLUFF Z � uJ Z 2 2 GRNINA WHOUSTON K Z 22 NAPLE AVE Z 2 BONHAM 2 r WK WAUSTN WALISTN 2 WSHERMAN W BMME OLD BON— Fx 2 �' RUM_ n f till,� E PItCE z f ,,, E PRCE Z W P E CE S(ON Z WHOUSTON AASHBBY WHOUSTON O ENDUSTON WFNOR Z UM4RBONHAM w( HLLARD JONEB KAUFMAN - �3 FORt ° H1BBARD AUSTIN W TN W T EAUSDN ( EVEUND ' G.EVELAND LF SPFARV MRR WOODLPWN� WOOOLAWN € E OJLBERTSO WSIERIMN 5 91ER ESHEMAN € OG*0 MmPSDN EBRAME BROWN WB NE ATHE RY WSRAME BRA HEARON IEMRON ,EARON IN o A W Bpa qE - Z HE ON _e O �, PCHREM IV, EWASHNGTON EWiSHNGTON Wi E WASHNGTON �( WWASHNGTON PAR 4; 2 E, EPOLK %H A B E POLK ^ E FOLK E NLK BROWN df CEDAR ST I jk Z BROWN LONG q " G OM ST FRISCO .RCKSON ST JACKSON ST tm - - - .ACKSON sli W HEARN E Z TRNL DE PAgS o = g IK .ACKSONCT; ; ALLEGE SYCALIOW SY MORE BELUVSrq O SYMNORE RT = Lamar County tM SYgyO. PARIS BLVD ORANGE M EFEAGLE w OLDJEFFERSON W NEAGLE �I 0 4?,4,1 Paris, TX Esri, HERE,DeLorme, Mapmylndia,© OpenStreetMap contributors, and the GIS user community,_ .. U 0 J a ELD IN E IN City or County Roadway 0?1 ASPEN aEe 6 ° orK° FAIR OAKS O WOOD HOLLOW E CENTER 0,16 KESSLER �Q KESSItR� 'MESS BALLARD BRMRWOOD BNARWOOD .T� �i BRMRWOOD RIDGEV E W q DGEV E W IQ A PINE MILL EHOWNWOOD UP W000LAND CLEMENT OAK $T RENO gFARGp x F VAGA$ e MILLER e NEVAOA 'Y RJBY 7 ECHERRY Z e n Z MALNUT M� YI to aKIN p RMBLUFF RNE BLUFF n W Y ROBIN Ii E FD ISTON n f x RAVE Y W W moo C NA RG MET MARGARET N 1 HJBBARD HUBBARD Q S VE QE LA C M >K ALLEN V,2 0 2r5 QARK QARK IA lW DUBON MAMFFEY ABBOTT C ABBOTT J 01 ODE Ui STAGY HYDE W, Rye, W N•R�NL E TRNLDE PAPoS "s Date: 7/52017 ZkF .EFFERSOry 1 inch = 2, 000 feet State Roadway B YORK Municipal Boundary - Paris, TX A SE LOOP TSB l 5,200 2,600 0 5,200 Feet Z r ?0M 2017 Street Improvements #1 - Church St. - E.Hearn Ave. To Clarksville St. #2 - Collegiate - LamarAve. To Clarksville St. #3 - SE 33rd St. - LamarAve. To Clarksville St. #4 - E.Cherry St. - NE 20th St. To NE 25th St. #5 - SE 3rd St. - Sherman St. To Provine St. #6 - NW 7th St. - Graham St. To Center St. #7 - SW 7th St. - W.Washington St. To Bonham St. #8 - SE 24th St. - Lamar Ave. To Clarksville St. #9 - Graham St. - Railroad To NW 19th St. #10 - NE & SE 17th St. - Pine Bluff St. To Clarksville St. #11 - SE & NE 1 st St. - E.Kaufman St. To Pine Bluff St. #12 - Clement Rd. - N.Main St. To NE Loop 286 #13 - Kaufman St. - SE 3rd St. To SW 7th St. #14 - W.Washington St. - SW 7th St. To SW 1st St. #15 - Fitzhugh Ave. - Pine Bluff St. To Hickory St. #16 - Hickory St. - NE 20th St. To NE 25th St. #17 - NE 25th St. - LamarAve. To Ballard Dr. #18 - NE 25th St. - Ballard Dr. To Hickory St. #19 - E. Price St. - NE 20th St. To Collegiate Dr. #20 - E.Hickory St. - N.Main St. To Fitzhugh Ave. #21 - Tudor St. - NE 3rd St. To Fitzhugh Ave. #22 - Graham St. - NW 3rd St. To Railroad Improvements by Year YEAR Project Begins —2017 —2018 —2019 OLD BON— Fx 2 �' RUM_ n f till,� E PItCE z f ,,, E PRCE Z W P E CE S(ON Z WHOUSTON AASHBBY WHOUSTON O ENDUSTON WFNOR Z UM4RBONHAM w( HLLARD JONEB KAUFMAN - �3 FORt ° H1BBARD AUSTIN W TN W T EAUSDN ( EVEUND ' G.EVELAND LF SPFARV MRR WOODLPWN� WOOOLAWN € E OJLBERTSO WSIERIMN 5 91ER ESHEMAN € OG*0 MmPSDN EBRAME BROWN WB NE ATHE RY WSRAME BRA HEARON IEMRON ,EARON IN o A W Bpa qE - Z HE ON _e O �, PCHREM IV, EWASHNGTON EWiSHNGTON Wi E WASHNGTON �( WWASHNGTON PAR 4; 2 E, EPOLK %H A B E POLK ^ E FOLK E NLK BROWN df CEDAR ST I jk Z BROWN LONG q " G OM ST FRISCO .RCKSON ST JACKSON ST tm - - - .ACKSON sli W HEARN E Z TRNL DE PAgS o = g IK .ACKSONCT; ; ALLEGE SYCALIOW SY MORE BELUVSrq O SYMNORE RT = Lamar County tM SYgyO. PARIS BLVD ORANGE M EFEAGLE w OLDJEFFERSON W NEAGLE �I 0 4?,4,1 Paris, TX Esri, HERE,DeLorme, Mapmylndia,© OpenStreetMap contributors, and the GIS user community,_ .. U 0 J a ELD IN E IN City or County Roadway 0?1 ASPEN aEe 6 ° orK° FAIR OAKS O WOOD HOLLOW E CENTER 0,16 KESSLER �Q KESSItR� 'MESS BALLARD BRMRWOOD BNARWOOD .T� �i BRMRWOOD RIDGEV E W q DGEV E W IQ A PINE MILL EHOWNWOOD UP W000LAND CLEMENT OAK $T RENO gFARGp x F VAGA$ e MILLER e NEVAOA 'Y RJBY 7 ECHERRY Z e n Z MALNUT M� YI to aKIN p RMBLUFF RNE BLUFF n W Y ROBIN Ii E FD ISTON n f x RAVE Y W W moo C NA RG MET MARGARET N 1 HJBBARD HUBBARD Q S VE QE LA C M >K ALLEN V,2 0 2r5 QARK QARK IA lW DUBON MAMFFEY ABBOTT C ABBOTT J 01 ODE Ui STAGY HYDE W, Rye, W N•R�NL E TRNLDE PAPoS "s Date: 7/52017 ZkF .EFFERSOry 1 inch = 2, 000 feet State Roadway B YORK Municipal Boundary - Paris, TX A SE LOOP TSB l 5,200 2,600 0 5,200 Feet Z r ?0M 2017 Street Improvements #1 - Church St. - E.Hearn Ave. To Clarksville St. #2 - Collegiate - LamarAve. To Clarksville St. #3 - SE 33rd St. - LamarAve. To Clarksville St. #4 - E.Cherry St. - NE 20th St. To NE 25th St. #5 - SE 3rd St. - Sherman St. To Provine St. #6 - NW 7th St. - Graham St. To Center St. #7 - SW 7th St. - W.Washington St. To Bonham St. #8 - SE 24th St. - Lamar Ave. To Clarksville St. #9 - Graham St. - Railroad To NW 19th St. #10 - NE & SE 17th St. - Pine Bluff St. To Clarksville St. #11 - SE & NE 1 st St. - E.Kaufman St. To Pine Bluff St. #12 - Clement Rd. - N.Main St. To NE Loop 286 #13 - Kaufman St. - SE 3rd St. To SW 7th St. #14 - W.Washington St. - SW 7th St. To SW 1st St. #15 - Fitzhugh Ave. - Pine Bluff St. To Hickory St. #16 - Hickory St. - NE 20th St. To NE 25th St. #17 - NE 25th St. - LamarAve. To Ballard Dr. #18 - NE 25th St. - Ballard Dr. To Hickory St. #19 - E. Price St. - NE 20th St. To Collegiate Dr. #20 - E.Hickory St. - N.Main St. To Fitzhugh Ave. #21 - Tudor St. - NE 3rd St. To Fitzhugh Ave. #22 - Graham St. - NW 3rd St. To Railroad Improvements by Year YEAR Project Begins —2017 —2018 —2019 BROWN WB NE ATHE RY WSRAME BRA HEARON IEMRON ,EARON IN o A W Bpa qE - Z HE ON _e O �, PCHREM IV, EWASHNGTON EWiSHNGTON Wi E WASHNGTON �( WWASHNGTON PAR 4; 2 E, EPOLK %H A B E POLK ^ E FOLK E NLK BROWN df CEDAR ST I jk Z BROWN LONG q " G OM ST FRISCO .RCKSON ST JACKSON ST tm - - - .ACKSON sli W HEARN E Z TRNL DE PAgS o = g IK .ACKSONCT; ; ALLEGE SYCALIOW SY MORE BELUVSrq O SYMNORE RT = Lamar County tM SYgyO. PARIS BLVD ORANGE M EFEAGLE w OLDJEFFERSON W NEAGLE �I 0 4?,4,1 Paris, TX Esri, HERE,DeLorme, Mapmylndia,© OpenStreetMap contributors, and the GIS user community,_ .. U 0 J a ELD IN E IN City or County Roadway 0?1 ASPEN aEe 6 ° orK° FAIR OAKS O WOOD HOLLOW E CENTER 0,16 KESSLER �Q KESSItR� 'MESS BALLARD BRMRWOOD BNARWOOD .T� �i BRMRWOOD RIDGEV E W q DGEV E W IQ A PINE MILL EHOWNWOOD UP W000LAND CLEMENT OAK $T RENO gFARGp x F VAGA$ e MILLER e NEVAOA 'Y RJBY 7 ECHERRY Z e n Z MALNUT M� YI to aKIN p RMBLUFF RNE BLUFF n W Y ROBIN Ii E FD ISTON n f x RAVE Y W W moo C NA RG MET MARGARET N 1 HJBBARD HUBBARD Q S VE QE LA C M >K ALLEN V,2 0 2r5 QARK QARK IA lW DUBON MAMFFEY ABBOTT C ABBOTT J 01 ODE Ui STAGY HYDE W, Rye, W N•R�NL E TRNLDE PAPoS "s Date: 7/52017 ZkF .EFFERSOry 1 inch = 2, 000 feet State Roadway B YORK Municipal Boundary - Paris, TX A SE LOOP TSB l 5,200 2,600 0 5,200 Feet Z r ?0M 2017 Street Improvements #1 - Church St. - E.Hearn Ave. To Clarksville St. #2 - Collegiate - LamarAve. To Clarksville St. #3 - SE 33rd St. - LamarAve. To Clarksville St. #4 - E.Cherry St. - NE 20th St. To NE 25th St. #5 - SE 3rd St. - Sherman St. To Provine St. #6 - NW 7th St. - Graham St. To Center St. #7 - SW 7th St. - W.Washington St. To Bonham St. #8 - SE 24th St. - Lamar Ave. To Clarksville St. #9 - Graham St. - Railroad To NW 19th St. #10 - NE & SE 17th St. - Pine Bluff St. To Clarksville St. #11 - SE & NE 1 st St. - E.Kaufman St. To Pine Bluff St. #12 - Clement Rd. - N.Main St. To NE Loop 286 #13 - Kaufman St. - SE 3rd St. To SW 7th St. #14 - W.Washington St. - SW 7th St. To SW 1st St. #15 - Fitzhugh Ave. - Pine Bluff St. To Hickory St. #16 - Hickory St. - NE 20th St. To NE 25th St. #17 - NE 25th St. - LamarAve. To Ballard Dr. #18 - NE 25th St. - Ballard Dr. To Hickory St. #19 - E. Price St. - NE 20th St. To Collegiate Dr. #20 - E.Hickory St. - N.Main St. To Fitzhugh Ave. #21 - Tudor St. - NE 3rd St. To Fitzhugh Ave. #22 - Graham St. - NW 3rd St. To Railroad Improvements by Year YEAR Project Begins —2017 —2018 —2019 4?,4,1 Paris, TX Esri, HERE,DeLorme, Mapmylndia,© OpenStreetMap contributors, and the GIS user community,_ .. U 0 J a ELD IN E IN City or County Roadway 0?1 ASPEN aEe 6 ° orK° FAIR OAKS O WOOD HOLLOW E CENTER 0,16 KESSLER �Q KESSItR� 'MESS BALLARD BRMRWOOD BNARWOOD .T� �i BRMRWOOD RIDGEV E W q DGEV E W IQ A PINE MILL EHOWNWOOD UP W000LAND CLEMENT OAK $T RENO gFARGp x F VAGA$ e MILLER e NEVAOA 'Y RJBY 7 ECHERRY Z e n Z MALNUT M� YI to aKIN p RMBLUFF RNE BLUFF n W Y ROBIN Ii E FD ISTON n f x RAVE Y W W moo C NA RG MET MARGARET N 1 HJBBARD HUBBARD Q S VE QE LA C M >K ALLEN V,2 0 2r5 QARK QARK IA lW DUBON MAMFFEY ABBOTT C ABBOTT J 01 ODE Ui STAGY HYDE W, Rye, W N•R�NL E TRNLDE PAPoS "s Date: 7/52017 ZkF .EFFERSOry 1 inch = 2, 000 feet State Roadway B YORK Municipal Boundary - Paris, TX A SE LOOP TSB l 5,200 2,600 0 5,200 Feet Z r ?0M 2017 Street Improvements #1 - Church St. - E.Hearn Ave. To Clarksville St. #2 - Collegiate - LamarAve. To Clarksville St. #3 - SE 33rd St. - LamarAve. To Clarksville St. #4 - E.Cherry St. - NE 20th St. To NE 25th St. #5 - SE 3rd St. - Sherman St. To Provine St. #6 - NW 7th St. - Graham St. To Center St. #7 - SW 7th St. - W.Washington St. To Bonham St. #8 - SE 24th St. - Lamar Ave. To Clarksville St. #9 - Graham St. - Railroad To NW 19th St. #10 - NE & SE 17th St. - Pine Bluff St. To Clarksville St. #11 - SE & NE 1 st St. - E.Kaufman St. To Pine Bluff St. #12 - Clement Rd. - N.Main St. To NE Loop 286 #13 - Kaufman St. - SE 3rd St. To SW 7th St. #14 - W.Washington St. - SW 7th St. To SW 1st St. #15 - Fitzhugh Ave. - Pine Bluff St. To Hickory St. #16 - Hickory St. - NE 20th St. To NE 25th St. #17 - NE 25th St. - LamarAve. To Ballard Dr. #18 - NE 25th St. - Ballard Dr. To Hickory St. #19 - E. Price St. - NE 20th St. To Collegiate Dr. #20 - E.Hickory St. - N.Main St. To Fitzhugh Ave. #21 - Tudor St. - NE 3rd St. To Fitzhugh Ave. #22 - Graham St. - NW 3rd St. To Railroad Improvements by Year YEAR Project Begins —2017 —2018 —2019