2000-116-RES APPROVING CHANGE ORDER NO. ONE TO THE RESOLUTION NO. 2000-116 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING CHANGE ORDER NO. ONE TO THE CONTRACT BETWEEN THE CITY OF PARIS AND SKINNER CONCRETE CONSTRUCTION CO. FOR THE SITE AND FOUNDATIONS FOR FIRE STATIONS NO. TWO AND NO. FOUR; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 10th day of April, 2000, in Resolution No. 2000-046 , award the contract for the site and foundations for the "Fire Station No. Two, located at 4050 Pine Mill Road Project"and "Fire Station No. Four, located at 24th Street S.E. and Jefferson Road Project" to Skinner Concrete Construction Co.; and, WHEREAS, the City Engineer, acting as project engineer, recommends the amendment of the contract for said Fire Station No.2 and Fire Station No.4 projects to alter the anchor bolt setting to conform to a plan submitted by Harrison, Walker & Harper for the metal structure, providing for a net increase of $290.00 in the contract price; and, WHEREAS, the form of Change Order No. One, attached hereto as Exhibit A, should, in all things, be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the form of Change Order No. One to the contract between the City of Paris and Skinner Concrete for the site and foundations for the "Fire Station No. Two, located at 4050 Pine Mill Road Project"and "Fire Station No. Four, located at 24th Street S.E. and Jefferson Road Project," attached hereto as Exhibit A, to alter the anchor bolt setting to conform to a plan submitted by Harrison, Walker & Harper for the metal structure, providing for a net increase of $290.00 in the contract price, be, and the same is hereby, approved. Section 3. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, said Change Order No. One, upon the terms and conditions and in the form shown in Exhibit A, attached hereto. Section 4. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 14th day of August, 2000. ATTEST: Mattie Cunningham, City Clerk APPROVED AS TO FORM: Larr . Scheilk, City Attorney /H'~'~'~ Michael J. Pester, ayor SAM A. JUZBEE · ARCHITECTURAL Sb,- VICES Construction Design, Planning. Inspection, & Consultation Licensed in Texas & Arkansas; Professional Member CS[ & SBCCI P.O. Box 667 Paris. Texas 75461 (903) 925-2485 Change Order: SKINNER # 1 Dated: August 7, 2000 CHANGE ORDER Skinner # , PROJECT NAME: Fire Stations #2 & #4 City of Paris Paris, Texas To Contractor: Skinner Concrete Construction THE CONTRACT IS CHANGED AS FOLLOWS: In order to conform to the anchor bolt setting plan submitted by Hanison, Walker & Harper for the metal structure, the following changes are required. For Fire Station #2 1. Move Footing at Grids D-3 to Grids D-2. Add cross beams C-2 to D-2 and C-6 to D-6. 2. Ail steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". 3. Change Footings at Grids B-6 and C-6 to be same as at Grids B:2 and C-2. 4. Cast column Pedestals integral with the floor slab. Assure anchor bolts have a minimum 12" embedment. For Fire Station #4 1. Reduce size of Drilled Piers at Grids D-3 and D-5 to 18"/36". 2. Add new Drilled Pier at Grids D-2. Size shall be 24"/48". 3. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". 4. At your option column Pedestals may be cast integral with the floor slab. Assure anchor bolts have a minimum 12 embedment. The Contract Sum will be increased by this Change Order in the amount .................. $ 290.00 The Contract time will not be increased by this Change Order................................ ( no ) days. The date of Substantial Completion as of the date of this Change Order, therefore is: unchaneed. ['I(;/)/I(/" {P"cr..k YoYffler Cclot heA G'toQ~ Byl2k-r~ Date <; - q - 'LOOO <':SRlfoetor,:> "''''e.<!. By Date EXHIBIT A