2001-132-RES APPROVING/AUTHORIZING EXECUTION OF ADVANCE FUNDING AGREEMENT FOR STANDARD TRANSPORTATION IMPROVEMENT PROJECTS (ON-SYSTEM)
RESOLUTION NO. 7001-117
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADVANCE FUNDING AGREEMENT FOR STANDARD
TRANSPORTATION IMPROVEMENT PROJECTS (ON-SYSTEM) WITH
TXDOT FOR UPGRADING TRAFFIC SIGNALS AT THE FOUR
INTERSECTIONS OF BU 82 H AND BU 271 B ON THE PARIS SQUARE AS
PART OF THE DOWNTOWN STREETSCAPE PROJECT, "STATEWIDE
TRANSPORTATION ENHANCEMENT PROGRAM" GRANT NO. CSJ-
0901-29-017, PROJECT STP 2000 (615) TE; MAKING OTHER FINDINGS
AND PROVISIONS RELATED TO THE SUBJECT; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City Council of the City of Paris did heretofore, on the 5th day of
August, 1999, in Resolution No. 99-100, authorize an application to be made to the Texas
Department of Transportation for the Statewide Transportation Enhancement Program grant; and,
WHEREAS, the City Council of the City of Paris did heretofore, on the 12th day of June,
2000, in Resolution No. 2000-073, accept the Grant Award entitled "Statewide Transportation
Enhancement Program" Grant No. CSJ-0901-29-017, Project STP 2000 (615) TE, in the total
amount of $805,920.00, requiring matching contribution of $201,480.00; and,
WHEREAS, the City Council of the City of Paris did heretofore, on the 9th day of July,
select Hayter Engineering to provide professional engineering/design services for the Downtown
StreetScape Project, "Statewide Transportation Enhancement Program" Grant No. CSJ -0901-29-
017, Project STP 2000 (615) TE; and,
WHEREAS, the City Council of the City of Paris did heretofore, on the 13th day of
August, 2001, in Resolution No. 2001-122, approve an Agreement for Professional Services with
Hayter Engineering for professional engineering/design services related to the Downtown
StreetScape Project; and,
WHEREAS, as part of said Downtown Streetscape Project, the City of Paris has requested
that TxDOT allow the City to paint the color black four galvanized steel traffic poles, the
crosswalk poles, the traffic signal heads, and the illumination heads on the downtown square; and,
WHEREAS, in order to have such devices black in color, which match the decor and color
scheme for the Downtown Streetscape Project, and at the same time satisfy TxDOT requirements,
the devices must be factory coated at the time of manufacture and at the sole cost of the City; and,
WHEREAS, to allow the City to obtain these traffic devices with the desired finish,
TxDOT requires approval by formal resolution of the City Council of an Advance Funding
Agreement committing the City to defray the costs of said devices in the amount of $5,427.00;
and,
WHEREAS, the form of the Advance Funding Agreement for Standard Transportation
Improvement Projects (On-System) with TxDOT, attached hereto as Exhibit A, should, in all
things, be approved, and the City Manager should be authorized to execute the same; NOW,
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS,
TEXAS:
Section 1. That the findings set out in the preamble to this resolution are hereby in all
things approved.
Section 2. That the form of the Advance Funding Agreement for Standard Transportation
Improvement Projects (On-System) with TxDOT, CSJ # 0045-09-079, Project Number MC 45-9-
79, attached hereto as Exhibit A, for black powder coating of signal poles and luminaires and
supplying black signal heads at the four intersections of BU 82 Hand BU 271 B on the Paris
square as part of the Downtown StreetScape Project, "Statewide Transportation Enhancement
Program" Grant No. CSJ-0901-29-017, Project STP 2000 (615) TE, be, and the same is hereby,
approved.
Section 3. That the City Manager be, and he is hereby, authorized and directed to execute,
on behalf of the City of Paris, the Advance Funding Agreement for Standard Transportation
Improvement Projects (On-System) with TxDOT, under the terms and conditions and in the form
shown in Exhibit A, attached hereto.
Section 4. That this resolution shall be effective from and after its date of passage.
PASSED AND APPROVED this 20th day of August, 2001.
~~~
ATTEST:
~~-.. t...~."..~~
Mattie Cunningham, City Clerk
( 0045-09-079
Project Number MC 45-9-79
County LAMAR
Location BU 82 H vs BU 271 B
ADVANCE FUNDING AGREEMENT FOR STANDARD
TRANSPORTATION IMPROVEMENT PROJECTS (ON-SYSTEM)
THE STATE OF TEXAS
THE COUNTY OF TRAVIS
THIS AGREEMENT IS MADE BY AND BETWEEN the State of Texas, acting through the Texas
Department of Transportation, hereinafter called the State, and Citv of Paris, a Texas City, acting by
and through , hereinafter called the Local
Government.
WITNESSETH
WHEREAS, Transportation Code, Chapter 201 and Transportation Code, Chapter 221 authorize the
State to layout, construct, maintain, and operate a system of streets, roads, and highways that
comprise the State Highway System; and,
WHEREAS, Commission Minute Order Number 108266 authorizes the State to undertake and
complete a highway improvement generally described as uparading traffic sianal; and,
WHEREAS, the Local Government has requested that the State allow the Local Government to
participate in said improvement by funding that portion of the improvement described as black
powder coating of sianal poles. and luminaires and supplying black signal heads at the four
intersections of BU 82 Hand BU 271 B on the Paris sauare, hereinafter called the "Project"; and,
WHEREAS, the State has determined that such participation is in the best interest of the citizens of
the State;
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements
of the parties hereto, to be by them respectively kept and performed as hereinafter set forth, the
State and the Local Government do agree as follows:
AGREEMENT
Article 1. Time Period Covered
This agreement becomes effective when signed by the last party whose signing makes the
agreement fully executed, and the State and the Local Government will consider it to be in full force
and effect until the Project described herein has been completed and accepted by all parties or
unless terminated, as hereinafter provided.
Article 2. Project Funding and Work Responsibilities
The State will authorize the performance of only those Project items of work which the Local
Government has requested and has agreed to pay for as described in Payment Provision and Work
Responsibilities, Attachment A, which is attached to and made a part of this contract.
EXl;1~t=JJt 5 A
Revised 4/9/01
( 0045-09-079
Project Number Me 45-9-79
In addition to identifying those items of work paid for by payments to the State, Attachment A,
Payment Provision and Work Responsibilities, also specifies those Project items of work that are the
responsibility of the Local Government and will be carried out and completed by the Local
Government, at no cost to the State.
Texas Government Code, Chapter 2106 requires the State to recover indirect costs associated with
this agreement as calculated based on prevailing rates specified in the State's Indirect Cost Recovery
Program.
Article 3. Right of Access
If the Local Government is the owner of any part of the Project site, the Local Government shall
permit the State or its authorized representative access to the site to perform any activities required
to execute the work. The Local Government will provide for all necessary right-of-way and utility
adjustments needed for performance of the work on sites not owned or to be acquired by the State.
Article 4. Responsibilities of the Parties
The Local Government acknowledges that while it is not an agent, servant, nor employee of the
State, it is responsible for its own acts and deeds and for those of its agents or employees during the
performance of the work on the Project.
Article 5. Document and Information Exchange
The Local Government agrees to electronically deliver to the State all general notes, specifications,
contract provision requirements and related documentation in a Microsoft@) Word or similar
document. If requested by the State, the Local Government will use the State's document template.
The Local Government shall also provide a detailed construction time estimate including types of
activities and month in the format required by the State. This requirement applies whether the local
entity creates the documents with its own forces or by hiring a consultant or professional provider.
Article 6. Interest
The State will not pay interest on funds provided by the Local Government. Funds provided by the
Local Government will be deposited into, and retained in, the State Treasury.
Article 7. Inspection and Conduct of Work
Unless otherwise specifically stated in Attachment A, Payment Provision and Work Responsibilities,
to this contract, the State will supervise and inspect all work performed hereunder and provide such
engineering inspection and testing services as may be required to ensure that the Project is
accomplished in accordance with the approved plans and specifications. All correspondence and
instructions to the contractor performing the work will be the sole responsibility of the State. Unless
otherwise specifically stated in Attachment A to this contract, all work will be performed in accordance
with the Standard Specifications for Construction and Maintenance of Highways, Streets, and
Bridges adopted by the State and incorporated herein by reference, or special specifications
approved by the State.
Revised 4/9/01
Page 2 of 5
( 0045-09-079
Project Number Me 45-9-79
Article 8. Increased Costs
In the event it is determined that the funding provided by the Local Government will be insufficient to
cover the State's cost for performance of the Local Government's requested work, the Local
Government will pay to the State the additional funds necessary to cover the anticipated additional
cost. The State shall send the Local Government a written notification stating the amount of
additional funding needed and stating the reasons for the needed additional funds. The Local
Government shall pay the funds to the State within 30 days of the written notification, unless
otherwise agreed to by all parties to this agreement. If the Local Government cannot pay the
additional funds, this contract shall be mutually terminated in accord with Article 10 - Termination. If
this is a fixed price agreement as specified in Attachment A, Payment Provision and Work
Responsibilities, this provision shall only apply in the event changed site conditions are discovered or
as mutually agreed upon by the State and the Local Government.
If any existing or future local ordinances, including, but not limited to, outdoor advertising billboards or
storm water drainage facility requirements, are more restrictive than State or Federal Regulations, or
any other locally proposed changes, including, but not limited to plats or replats, result in increased
costs, then, any increased costs associated with the ordinances or changes will be paid by the local
entity. The cost of providing such right of way acquired by the State shall mean the total expenses in
acquiring the property interests either through negotiations or eminent domain proceedings, including
expenses related to relocation, removal, or adjustment of eligible utilities.
Article 9. Maintenance
Upon completion of the Project, the State will assume responsibility for the maintenance of the
completed Project unless otherwise specified in Attachment A to this agreement.
Article 10. Termination
This agreement may be terminated in the following manner:
. by mutual written agreement and consent of both parties;
. by either party upon the failure of the other party to fulfill the obligations set forth herein;
. by the State if it determines that the performance of the Project is not in the best interest of
the State.
If the contract is terminated in accordance with the above provisions, the Local Government will be
responsible for the payment of Project costs incurred by the State on behalf of the Local Government
up to the time of termination.
A. In the event the State determines that additional funding is required by the Local
Government at any time during the development of the Project, the State will notify the Local
Government in writing. The Local Government will make payment to the State within thirty
(30) days from receipt of the State's written notification.
B. Upon completion of the Project, the State will perform an audit of the Project costs. Any
funds due to the Local Government, the State, or the Federal Government will be promptly
paid by the owing party.
C. In the event the Project is not completed, the State may seek reimbursement from the Local
Government of the expended funds. The Local Government will remit the required funds to
the State within sixty (60) days from receipt of the State's notification.
Revised 4/9/01 Page 3 of 5
J 0045-09-079
Project Number Me 45-9-79
D. The State will not pay interest on any funds provided by the Local Government.
E. The State will not execute the contract for the construction of the Project until the required
funding has been made available by the Local Government in accordance with this
Agreement.
11. Notices
All notices to either party by the other required under this agreement shall be delivered
personally or sent by certified or U.S. mail, postage prepaid or sent by electronic mail,
(electronic notice being permitted to the extent permitted by law but only after a separate written
consent of the parties), addressed to such party at the following addresses:
State: District Engineer
Texas Department Of Transportation
1365 North Main Street
Paris, Texas 75460-2697
Local Government: City of Paris
P.O. Box 9037
Paris, Texas 75461-9037
Attention: City of Paris
All notices shall be deemed given on the date so delivered or so deposited in the mail, unless
otherwise provided herein. Either party may change the above address by sending written notice of
the change to the other party. Either party may request in writing that such notices shall delivered
personally or by certified U.S. mail and such request shall be honored and carried out by the other
party.
Article 12. Sole Agreement
In the event the terms of the agreement are in conflict with the provisions of any other existing
agreements between the Local Government and the State, the latest agreement shall take
precedence over the other agreements in matters related to the Project.
Article 13. Successors and Assigns
The State and the Local Government each binds itself, its successors, executors, assigns, and
administrators to the other party to this agreement and to the successors, executors, assigns, and
administrators of such other party in respect to all covenants of this agreement.
Article 14. Amendments
By mutual written consent of the parties, this contract may be amended prior to its expiration.
Article 15. Signatory Warranty
The signatories to this agreement warrant that each has the authority to enter into this agreement on
behalf of the party they represent.
Revised 4/9/01
Page 4 of 5
-
( '0045-09-079
Project Number Me 45-9-79
IN WITNESS WHEREOF, THE STATE AND THE LOGAL GOVERNMENT have executed duplicate
counterparts to effectuate this agreement.
THE STATE OF TEXAS
Executed for the Executive Director and approved for the Texas Transportation Commission for the
purpose and effect of activating and/or carrying out the orders, established policies or work programs
heretofore approved and authorized by the Texas Transportation Commission.
By
District Engineer
Date
THE LOGALGOVERNMENT
Name of the Local Government
By
Date
Typed or Printed Name and Title
Revised 4/9/01
Page 5 of 5
C 0045-09-079
Project Number Me 45-9-79
Attachment A
Payment Provision
and
Work Responsibilities
Description of the Cost of the items of Work
The State will be responsible for the black powder coating of signal poles and supplying black signal
heads at the four intersections of BU 82 Hand BU 271 B on the Paris Square as described in the
plans and specifications for CSJ 0045-09-079.
Indirect Costs
There will be no indirect costs charged to the Local Government.
Payment Schedule
The Local Governments cost for its portion of the work is estimated to be $5,427 which includes,
construction costs to make signal items black. This payment will be paid to the State within thirty (30)
days of the execution of this agreement.
This is an Actual Cost Agreement
The Local Government will be responsible for paying any costs of the project in excess of $5,427
within thirty (30) days of notification by the State of the last overrun. If the project costs less than
$5,427, a refund will be made by the State to the Local Government after all work is complete.
Revised 4/9/01
Page 1 of 1