2005-056-RES CHANGE ORDER NO. ONE TO CONTRACT FOR THE REHAB AND RECONSTRUCTION OF THE CITY HALL AND CENTRAL FIRE STATION BLD. RESOLUTION NO. 2005-056 A RESOLUTION OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING CHANGE ORDER NO. ONE TO CONTRACT FOR THE REHABIUT A nON AND RECONSTRUCTION OF THE CITY HALL AND CENTRAL FIRE STATION BUILDING; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council ofthe City of Paris did heretofore, on the 22nd day of September, 2004, in Resolution No. 2004-167, award the contract for the rehabilitation and reconstruction of the City Hall and Central Fire Station Building project to Charlie Clark Construction; and, WHEREAS, Denny Architects, acting as project architect, recommends the amendment of the contract for said project to make changes as described in Exhibit A attached hereto, and providing for a net increase of $3,336.00 in the contract price, for a total contract price of $739,736.00; and, WHEREAS, the form of Change Order No. One, attached hereto as Exhibit A, should, in all things, be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the form of Change Order No. One to the Contract for the rehabilitation and reconstruction of the City Hall and Central Fire Station Building project, attached hereto as Exhibit A, for the changes described on Exhibit A attached hereto and made a part hereof, and providing for a net increase of $3,336.00 in the contract price, for a total contract price of $739,736.00, be, and the same is hereby, approved. Section 3. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, said Change Order No. One, upon the terms and conditions and in the form shown in Exhibit A, attached hereto. Section 4. That this resolution shall be effective from and after the date of passage. PASSED AND APPROVED this 23rd day of May, 2005. ATTEST: ~/O roo 0) Ice ElliS, City Clerk ,-- \ CHANGE ORDER NO.1 PHONE NO.: City Hall Renovation Charlie Clark Construction 5403 U.S. Hwy. 82 W. Clarksville, TX. 75426 (903) 925-2023 DATE: May 18, 2005 PROJECT NAME: CONTRACTOR: ADDRESS: 30.24 ITEM ITEM UNIT OF UNIT CONTRACT NO. DESCRIPTION MEASURE PRICE ADD/lDEDUCn 1 Additional Concrete to backfill wall at Elevator Pit LS $732.00 $732.00 2 Remove existing rooftop AC unit over elevator & cao ooenino LS $2,280.00 $2,280.00 3 Demolition of concrete floor, existing toilet and shower in the existina 2nd floor bathroom LS $8,340.00 $8,340.00 4 Install 4" sanitary riser and 1" water supply riser to 2nd floor LS $942.00 $942.00 5 . Break out existing sanitary clean out on North side af bulldina and install at nrade eiean-out LS $498.00 $498.00 6 Demolition of existing subsurface concrete slab at excavations for sewer line LS $360.00 $360.00 7 Additional underground piping at the elevator pit LS $2,840.00 $2,840.00 8 Work in elevator pit as required by the elevator comoanv LS $2,500.00 $2,500.00 9 Work to accommodate the revised electrical distribution riser diaaram LS $605.00 $605.00 10 Addition of duct outlet into elevator shaft on the second floor above the cellina LS $210.00 $210.00 11 Addition of a new water meter to separate the new council chamber & attornev's office water meters LS $786.00 $786.00 12 Additional concrete in the handicap parking area on The south side of the buildino LS $6,500.00 $6,500.00 13 Conduit and wiring to electric w5ter he8ter in rooms 204,205 and 215 LS $1,743.00 $1,743.00 Continoency fund in the contract $25,000.00 ($25,000.00) NET CHANGE ORDER AMOUNT $3,336.00 Original Contract Total Total Amount of Previous Change Orders Total Amount of this Change Order NEW CONTRACT TOTAL Original Contract Time (Calendar Days) Total Amount of Previous Change Orders Total Amount of this Change Order EW ONTRACT TIME (CALENDAR DAYS) $736,400.00 $0.00 $3,336.00 $739,736.00 285 o 9 294 This Dacument will be ement to the contract and all provisions will apply hereto. RECOMMENDED FOR APPROVAL: 5'"- / -0 S- Date ACCEPTED: Contractor Date APPROVED: City Manager Date EXHIBIT A PAGE 1 OF 1