18 - 2018 Road Reconstruction ProgramItem No. 18 TO: Mayor & City Council FROM: John Godwin, City Manager SUBJECT: 2018 ROAD RECONSTRUCTION PROGRAM DATE: February 19, 2018 BACKGROUND: We initially created a prioritized list of 22 street segments that were identified as most needing reconstruction to one degree or another. These are not necessarily the streets with the absolute worst pavement in the, city, but all are collector streets, so their reconstruction will impact the most overall traffic. Each is an asphalt street, and each will be replaced with asphalt. Some will necessarily include sidewalk, drainage, and utility work. Obviously we do not want to rebuild a roadway only to leave behind drainage problems, or have it dug up when a water or sewer line breaks (though there is no guaranty that will not happen). ADA coines into play with some sidewalk requirements also,. Last sura mer the council approved a three-year plan, and adding two new street segments to bring the list to 24. Four projects were approved for immediate design and construction: East Cherry (20"' to 25"), 7hNW (Graham to Center), 3"1 SW and SE (Sherman to Provine), and 7"' SE (Kaufinan to Washington). The first two projects were completed in 2017. The latter projects are underway; pending dry weather and Atmos line repairs they will be finished in, March. Church Street is under design, with construction expected to begin this summer. That project has a very large scope, including full -depth paving, drainage, wastewater, sidewalk, and streetlight improvements. Most of the streets will be rebuilt using a construction practice called mill & overlay (or inlay). This is the type of work done so far, and is suitable for roads with adequate bases. A few roads will require full -depth reconstruction, a more expensive process that also, includes significant engineering costs. These include Church, 1.7`h SE,, and 20'' SE, as well as a part of 25t" NE. Two roads, 33rd SE and Collegiate between Clarksville and Lamar, fall somewhere in a middle ground where full -depth would be preferred but not absolutely necessary. By doing only mill & overlay there, coupled with some new curbing and in-house repairs to "soft spots", we will get a much better driving surface that should last many years, while saving money to complete more projects. STATUS OF ISSUE: Each year we need to update and readopt our draft three-year plan to account for any changes in priorities, needs, costs, or other matters. The attachment shows all 24 planned streets, grouped into seven discreet projects, plus a group that is as yet unfunded, Project I is Church Street, and Project 2 is the group of segments currently under construction. We propose doing Projects 3 and 4 beginning this calendar year (five street segments totaling about $4 million), Collegiate, 33'-'J SE, and Graham will likely be designed in-house and bid as a single project this spring. As mentioned previously, we are negotiating with KSA to provide design engineering for 17'h and 24th, which will begin in late summer .and will be built somewhat consecutively so that both streets are not closed at the same time. As we did on 3"', we will do in-house utility work on Graharn so that it will be ready for repaving in 2018. We will plan to bid Projects 5-7 in 201 , and as many of the currently unfunded projects as possible in 2020. BUDGET. Funds are available from 2017 bond proceeds, RECOMMENDATION: Approve attached plan of work, specifically as it relates to Projects 1, 3, and 4. 2017 Street Bond Improvements - Proposed' Project List No. STREET PROJECTS PROJECT COST PROPOSED Overlay ani/ Sws IMPROVEMENT 1 Church, Hearne to Clarksville 2,340,000 'Full Depth E Cherry, 25 NE to 20 NE Mill & Overlay 2 art! SE, Sherman to Provine Overlay vu/ SWs 7NW, Graham to Center 1,280'000 Mill & Overlay 7 SW, Washington to Benham Mill & Overlay 4 24 SE, Clarksville to Lamar Full Depth 2,560,000 17NE, Clarksville to Pine Bluff Full Depth 6 Fitzhugh, Pine Bluff to Hickory Overlay ani/ Sws Hickory, 20th to 25th 1,000,000 Mill & Overlay 25th NE, Lamar to Ballard 290,000 Mill & Overlay Ui N 25th , Ballard to Hickory 540,000 Full Depth z E Price, 20th to Collegiate 290,000, Mill & Overlay Hickory, Main to Fitzhugh 260,000 Mull' & Overlay Tudor, 3rd to Fitzhugh 280,000 Mill & Overlay Oralham', RR to 19th NW 1,910,000 Mill & Overpay N Collegiate Dr - Lamar to Loop Mill & Overlay Stillhouse Rd - DShong to City Limits Mill & Overlay Do curnent Name, FEB 2018 RE. V2.- 2017 Street tlm pro vemerl Prq acts - Tabloid LS LEGEND x Z 2018 Status ® Street Improvements, List Date: 2/20/2018 011 #1 - Church, St, - E.Hearn Ave. to Clarksvifle St. #2 - S. Co lleg iate - C larksv lie St. to La m a r Ave. 24 #3 - 33rd St. SE - Clarksville St. to Lamar Ave. a) TAR WR LO., I inch 2,0'00' feet t #4- E. Cherry St, - 20th St. NUE to25th St. NE limm"M=7 #5. 3rd St. SE & NE - E. Sherman St. to E. Provine St. 'WQ.N'000a'k YLOODLAND #6 - 7th St. NW - Graham St. to W. Center St. 12' #7 - 7th St, SW - W, Washington St. to Bonham St. WCENTERC q, z 01- w0AN F. 0.1v om BY #8 - 24th St. SE - Clarksville St. to Lamar Ave. E CE. NT�.R E CENTER canna maaiOw WPARK _',_720 Ar - Graham St. - Railroad to 3rd St. SW WHCKORY EHCKGRY,, hil #9 40 W4LO It NO us 5,RQ. 6 #10- 17th St. NE & SE -Clarksvifle St. to Pine Bluff St, VAGM car F!E,o+gLw:xaru 'a 901 123 coo GAR�TT U VAOA #11 - 1st St. SE & NE - E. Kauftnan St, to Pine Bluff St. TE.DFR�)w 4 V_ ERMAN WLONG VYL.HG E GMREn W.R.00D RLEY GRO Ys GRO 'a. ­RLY-Ce #12 - Clement Rd. - N. Main St, to NE Loop 286 ��xrvav FOL R w2 x @ jR Kaufman St. - 7th St. SWto 3rd St. SE waoEvrtwe ETUWk / #13 "OHL / � 11 PILO" uxo / a HALY kE W BOOTH WTOTHMC "CHEP.� WBOOT� F.)OTH 71 #14 - W. Washington St, - 7th St. Salto 1 st St, SW �TO c �&E R Pi.U. i 9i I ;z 4 FHLPkRY 5" 1 , CHERRY IV i CHERRY CHERRY LE 1UFF #15 -Fitzhugh Ave. - Pine Bluff St. to E. Hickory St, jE RNE BLUFF Pima PW BIX" "RE 'LUfr 2 RU. i4B N 9 QM ­ E PiRr'E PH CE IeONVVII WHOUSTON 19 L.0,6ioN wHoUSION 4 1' F #16 E. Hickory St. - 20th St. NE to 25th St. NE E -USTO� �MLE AMroure WLE AYE own A V quPAV ONES ._O�kr #17 - 25th St. NE - Lamar Ave. to Ballard Dr. 10, FORT TIUBWD HUBBARD 3 1 A I ,Y T. SRR s =IW E�VFTIN #18 - 25th St. NE - Ballard Dr. to Hickory St. Lamar County -OODLPvVN E 8FLp ALEN 9m..HN- 416� U� 01 7 Coo' SWSON' #19 - E. Price St. - 20th St. NE to Collegiate Dr. MAR i2 e Wo 3 WORAME E RR HEMON HE MON HEAR.MON a.AkK AUVV50- #20 E Hickory HickoSt. N. Main St. to Fitzhugh Ave. rAFFer —�,,NGIONIT *4<_ IIUI E E FOLK"" ,gaom y #zKon P E POLK J 4A 0 N fiSYtUWM t E K)LI L �%K #21 - E. Tudor St. - 3rd St. NE to Fitzhugh Ave. PROwl FRsCO �C KS ON V ACKSONST #22 - Graham St. - 19th St. Salto Railroad 16 1 - -YlCK5aM 5T E ER'l DE RM, LEGEND #23 - N. Collegiate Dr. - Lamar Ave. to NE Loop 286 II,III VIII,MORE klo.F RYCAWRE Vt City or County Roadway #24 - Still'houlse Rd. - DeShong Dr. to City Limits Documan)t Pat" E:1AMPL ad yRULE&MapMXDsQr017 Sire et Improveffent Prcieds;WEB 2018 REV2 2017 Street Ireprovement Projects - Talloid LS LEGEND mxd M ENRON