Loading...
09 - Code & Demolition ReportsItem No. 9 Code Enforcement Report: February, 2018 Work crew report for Jan ary 29 -February 2, 2017 Monday - Picked up tires, litter and looked at remaining lots to see conditions of lot so we can try to get on them. illegal dump clean up at 845 Cedar (vacant lot) Tuesday- 12`h NE and Booth — trimmed cedar tree Unloaded trailers at Blossom dump. Wednesday — 12" NE and Booth — clean up tree limbs 101h NE and Houston, — clean up scattered litter.. Thursday — 705 3`d SE —trim and clean up limbs in yard 4th NW and Cherry—clean up lumber in lot Friday — Took bobcat from wastewater to lift station. Price Paint and Body Shop_ cleaned up litter, junk and rubbish. Work crew report for February 5-_9,2017 Monday - Friday Picked up 88 tires and other illegally dumped items from City Right -of -Ways. (Rained most of the week) Work crew report for February 12-16, 2017 Monday - Friday Monday — worked on water leak at Wise Field shop.. Rode dump roads, abated several illegal dump sites from Right -of -Way, worked on bobcat and other equipment. (Rained most of the week) Work crew report for February 19-23, 2018 Monday - Friday Scrapped paint off the floor in the shop at the Airport. Picked up tires and rubbish from Right -of -Ways. Worked on mowers and other equipment. (Rained all week) Work crew report for February 26 — March 2,_2018 Monday - Friday 1512 Margaret — picked up tires at street. 5`h -6`h 6Ih W Cherry —Tires on side of road pickup; rubbish and litter in Right -of -Ways,. Picked up mattresses and couch on Hickory Street. Worked on tractors and trimmers. 8 Structures were presented to the Commission: 410 Fitzhugh 1.524 E Price 646 NE 17th 2400, N Main 1238 NW 18th 348 SW 13`" 1440 Sperry 37 Clarksville There were no structures demolished in February.