Loading...
09 - Demolition & Code Enforcement ReportsItem No: 9 Cole Enforcement Report: March 2418 Work crew report for February 26 — March 2, 2018 Monday - Friday 1512 Margaret — picked up tires at street. 5" -6t" W Cherry —Tires on side of roadpick up.. Abated l 2 illegal dumpsites in the 1400 Block of E Hickory, and 1 in the 1200 Block of'W Cherry. Work crew report for March 5-9, 2018 Monday —Tuesday Rode dump roads, picked up tures and illegal dumping, worked on equipment. "Wednesday— Friday The work crew and B of Rills guys worked at the Love Civic Center on the shooting ranges. Wednesday Bpm moved conference table from Big Brother Big Sisters to City Hall 2 Ild Floor. Work crew report for March 19-23, 2018 M -F picked up tires, cleaned up illegal dumps and anything else we found.. Monday — Abated tree at 458 10t" NE Tuesday —Abated 1220 Fitzhugh Wednesday - Repaired pavers with cement and glue in water billing parking lot around trees. Thursday— moved wiindows and doors from upstairs in city hall. V11''ork crew report for March 19-28, 2018 M -F picked up tires, cleaned up illegal dumps and anything else we found. Monday— Fixed water leak at "Wise Field. Tuesday Abated 18th NE (BSC Ordered), Abated 114 NW 13th Wednesday — Archery Lanes Thursday—Archery Lanes Work crew report for March 26-30, 2018 Monday — Winefest banners were hung. Pick up tires at TXDOT by road. Paint disposal preparation at Cox Field, Tuesday — Archery Lanes Picked up ATVS for Archery Tournament Picked up fork lift for Archery Tournament targets, Wednesday—Archery Lanes Thursday — Archery Trails Lanes 4 Structures were presented to the commission: 37 Clarksville 240 & 260 N Main 129 W Washington 631 E Washington There were no houses demolished in March due to rain. Buiillding Violations Delapitated Structures Fences Signs Unsecured Structures Working Without Permit General Violations Yard Code Violatbn Vehicles Violations Front Yard Parking Junk Vehicles Special Vehicle - Complete Removal Special Vehicles Totals City of Paris's Code - Work Summary - Weekly Month of March, 2018 Case Starts Completed Cases Initial Inspections Reinspections Total Inspections 2 2 2 2 2 1 2 2 3 3 10 10 10 110 10 4 0 4 1 1 1 62 83 125 135 13,5 15 20 30 33 33 40 28 60 72 72 4 5 7 9 9 1 1 2 2 2 140 152 243 273 273 MYGOV.US City of Paris I Code - Work Surnmary - Weskfy I Printed 0411712018 Page 1 of 1