16 - Parks, Recreation & Open Space Master Plan UpdateItem No, 16
TO. Mayor & City Council
FROM: John Godwin, City Manager
SK
A.
0 T ? � 1111 11 1 1, NiF1112MM1. :: 11 r11
DATE: May 2, 2018
BACKGROUND: The city adopted a Parks, Recreation, & Open Space Master Plan in late 2013
for the planning period 2013-23, That plan was prepared by MHS Planning & Design, using a
grant to pay the cost of preparation. We have rnade some progress on the plan, though only
minimal funding was available until last summer's successful bond election.. We are due for a
five-year update, and a draft updated plan has been assembled by the city's parks work group
towards that purpose.
STATUS OF ISSUE: The council received public input on the draft revisions on April 9, and
.have sought feedback through other sources as well. The attached revised Sections 7 and 8
include all changes since the 2013 plan marked in blue for easy reference. We will receive
additional input at the May 14 council meeting, prior to adoption of the new plan. Upon
adoption, the plan will be submitted to the Texas Parks & Wildlife Department in support of a
parks development grant we will submit later this year.
RECOMMENDA'I"'.ION: Approve attached revised plan, with any additional changes agreed to.
The following list consists of key points from the 2013 needs analysis:
The City of Paris needs to focus on top quality upgrades and renovations to existing parks.
Trails are needed for more connectivity throughout the community and to encourage healthier
lifestyles.
Existing parks and facilities need to continually be upgraded and maintained at a high level in order
to keep Paris's park system tip to local standards and safe for all users, This includes making public
parks and facilities compliant with ADA guidelines.
• A multi -sports practice field with lights needs to be constructed.
• A sprayground/siTiall water park is needed for water-based recreation.
• Additional restrooms are needed throughout town at multiple diftbrent parks.
• An indoor recreation, center needs to, be considered in Paris.
• An indoor swimming facility is desired for both competitive and recreational use.
• Nature trails,, playgrounds, pavilions, enhanced landscaping, picnic areas at the parks and multi -use
trails all are needed to satisfy senior citizens' recreational needs.
• Additional and upgraded site amenities are needed throughout the park system.
• All new park facilities need to be properly designed, well-built, and maintained at a high level.
The flive-year update for 2018-20 3 was drafled 1'.)y a parks work group that niet niont1fly for approxin-mtely
1wo years. "Hie city council received public illpUt aat two regular, advertised meetings, on April 9 arnd May
14, In addition, the proposed update was distributed by direct mail to� key stakeholders in the conununity,
and yvas placed for pUbfiC inspection (_)n the city's website, in the aitinicipal Hbra:)/, and in various social
media..
01v Of'Paris Parks, Recreation & Open Space AMster Plan 2018-2023 Uridate
W
The following table represents the projected recreational facilities priorities for the Paris Park
System. These priorities are based on the needs analysis, citizen survey, public input meetings,
focus group input, city staff, the City of Paris Citizen Advisory Committee and professional
opinion, is chiding revisions rnade In 2018 folkm'ing close review by at city slatf parks \NvotI,
grmij:) and opportunities for additional citizen inj)LA.
Priority
Facility
Playgrounds
2
Multi-purpose trails
3
Amphitheater/gathering spaces
4
Picnic shelters/pavilions
5
Picnic areas
6
Restrooms
7
Nature traits
8
Spray ground/Small water park
9
Botanical/flower gardens
10
Lawn a rcas for general play
I I
Indoor recreation center
12
Swimming pool /natatorium
13
Dog park
14
Water features (creeks, small lakes, etc-)
15
Nature areas
16
Tennis courts
to
35
The following actions are recommended to be implemented within the next ten years to ensure that the
parks and open space system continues to meet the recreational needs of the city. 2018 updzite in
New Parks
Acquire and develop land at the southwest corner of Main Street and Graham Street. Property
acquired nand ceared through <In H,A with I amar C'ounty ( 19 acres)
- Construct large open green lawn,
- Plant trees and landscaping,
- Construct Wagon monument.
Acquire natural open spaces to be preserved as the opportunities are available. Expanded
ch°vcloped area al lake, Crook,
Existing Parks
Construct a spray ground. The cay worked closely with the First unite(,i Mo]14�)djst (,11urch in
2016 to construo a joint use ,ipray ground on FUMC proj,�)erty in downtown, The park is open, u)
th.c public, and includes a restroom facility constructed and maintained by the city.
Provide additional picnicking areas and tables. A picnic, area was added to Lake Crook Park
in 2016,; the picnic area at Oak Park was unproved in 2018. Acquired and completed recon-
struc,tion of fi.)rr:nerTXD0'l'park on US 8I2W,
Replace playgrounds (older than 15 years old), Added a new playgl-OUnd to Lake Crook ill
2016, Playgf'OLInds at ( _)ak Park and Wade Park were compIctely replaced in winter/spring
2018, utilizing a coinbination of voter -approved 2017 park bonds and local I , 'undraising,
new paygrounds arc ADA coinphant and include new accessible equipment,
Increase level of maintenance. Staff fevc]s in the Parks, division have been incrcased by two
FYI,", effi„cfive April 1, 2018, Added safiety, fencing al 5'q' Slreo basketball COLIM, established
additional permanent water-c"eck crossing on archery la,ncs,- finished building archery
lanes at Sports ('oy,)If)lcx property.', snowed clearcd large ()pcn spaces at lake Crook_
o Construct multi-purpose and walking trails. ( "OnStrUcted new West Paris Trail (1 .8 miles) in
2016-17, LISifIg as TXD01'granI of'$51 5,193 kind matching city ha. nds, Reconstructed 7,203 firie'ar.
,I�et ofthe Trad de Paris, Completed'I'rad, dc Paris extension of'4,224 feet, using '["'PWI) grant ol'
$20,0,000 and city MatChiTIg funds, Created nature trail at Lake Crook (,-3 affles round trip).
0 Provide additional landscaping including irrigated turf in all parks.
le
36
Provide restroom facilities in high use parks. C0IIStIUdCd new resIrtm'Aris downlown and at
city-owried fairgrm.ffl(]S. J:,.nhari(,;ed restrooms at Eake (.-'rook acid Market S(pmr(.,,�,
Upgrade existing tennis courts. --new surfaces, nets,, windbreaks, etc. I`ivc exisfing tenrlis
courts at (. I Park were rctinbishtxi in 2017, Ba(,,,k.stoj-,) refurbished. One coufl, to be
ccmverted to Nasketball iti 2018.
Construct lighted lawn areas for sports practice areas within existing parks, Soccer
WrjS'ieh] in 2017" alSo soccer field, sofibaH backsto , and basketball goals at
added at e 1-, P
police 61, courts building
0 Provide and install attractive lighting at parks Ior safety.
0 Improved Marko `~wear -c gr(ninds; added shcldc shelter. at MltigLIOLIS kalc Park,
IIrq-,)r()Ved historic Pklza. row AD)k cornpliant, repcored bistoric fburitatii; upgradc4J eteclriciiy
and lighting.
Upgraded lights and unproved landscaping af ('Jale%v;.Ily llal-L
linproved Bywatens Park, Mchidirig safety and eleCtflj(,",aj enhancements,
Athletic Facilities
• The City of Paris needs to work closely with the Optimist Club to provide even more and better
baseball opportunities for the youth. Began providin�
.! graw funds to clula in 2017,
Construct an indoor swimming pool for both competitive and recreation use. [Jpgraded
de.teriorating iSSUes at cxistillg OW(1001- P001; installed new f'encing r-irtd sidewalks.
min,r)s and filter to be replaced in 2018, Meeting with NP(.-) regarding possible joint
operation of a recreation facility with an indoor pool.
V'slablisfied in-house gir-ls" sof1bal I 1-,)rograrn in 20 15; addcd Field #7 to Sports (L."ornplex
R)Y- softball.
Natural Open Space
Preserve the most valuable and aesthetically pleasing natural open spaces. Rrovided beticr
access to aper spaccs at 1-ake C.'rook and encouxagmg inultiple uses.
CILtY Ea 'Paris Parks° Recreat �ion & Open S
2acs Master Plan, 2018-2023 Update
M
Indoor Recreation Center
Construct an indoor recreation center at the Sports Complex for multiple recreational
opportunities. Financial resources may not aflow tile city to construct and (.q.-wrate �such a
fac,ifily� 'I'll ��n,e I 6re, the city Wdl Seek ol-q-)ortunifles to INUIlICT with offi.erjurisdictions and noll,
profit's to morc efficienfly offi,-,r these much-needed rec.reational opportunities, [:'xisdngl
hicilifies ruay also be the Inost way 1(:,) cre'ate a fun(-Aioning Worl"L 1)d gt,j[.j t(II
develcp 111is soil Of facility rc-use(s) and joiia programn)ing at two possible localioj,,r�s.
Senior Citizens
Provide facilities such as: multi -use trails, nature trails, playgrounds, botanical gardens,
picnic shelters/pavilioris, benches and picnic areas for senior citizens at all new and upgraded
parks, 1"he City HSSUmed cordrol of," 0,)e fin-iner fair associalion exhibit hall in 2,015, and
began passive prognunining, 1,or seniors in 2017. Bench swings werc raddedl at Lake Crook.
Plan to add a garden photo spot at or near Love Civic Cenler., need a non-profit partner to
plant and manage. Planning pickle ball within 'an exisling facility, Developilao 11cw lwf_w
grannning in conjunction with the library.
Maintenance
The City of Paris currently has one maintenance employee for approximately every 25 developed park
acres. In addition, this same staff maintains all the rights-of-way, medians, ditches and trees on public
land inside the city limits. The staffing levels have slowly been falling behind and need to increase in
order to keep the maintenance of parks and facilities at a high level. The following two bullets are
necessary in order for the city to provide well maintained areas at an efficient cost:
Prepare and adopt a statistically -based maintenance study that will increase the maintenance staff
and budget as the park system continues to grow. Staff levels In the parks divilsion have been
incrc,ascd by mo FTF, cfTectivc April 1, 2018, reducing park acres/employee to approx ini ate ly
2 1
"Trails
Develop parks that are not overly maintenance intensive by including more natural areas, native
plantings and natural play (play opportunities with limited or no playground equipment). Staff
has adopled an intertial policy to ahva.ys lie added staffing to any new Pr()gj-ajjrjS, ser6ces,
schedules, or respmisibilities. Finphasizirig xeriscaping with riew plawings,
Develop trail linkages throughout Paris to, connect schools, residential areas, commercial areas,
parks and adjacent communities. Completed tivo grant -funded Salt:, Routes to School pr(11ects,
HICIUditig bikc, hmes
City of'Paris date
38
Construct minor trail and sidewalk connections in order to connect large segments of trails for
better access, throughout the community, Usu ..',d 1:.mveinew m,,.ir-kjngs and signage t() coj)jj(.,,ej
%
Faris trail and Trad Lie Parls alontj exismig paroa
ved ways,
l
Sidewalks are to be used in conjunction with trails to connect different nodes throughout the
community. Constn,u,,ted 5,300 fevl ofnevv sidewalk on Grahmnl6:onrneOjo< ii to West Paris Tnail
scha.,.(.kded for 2018,
te
39
The following table depicts the project priorities with suggested completion dates. It is important to note
that the following schedule is intended to be a flexible guide for the development of parks and
recreational facilities over the next ten years for the City of Paris. The city should evaluate and take
advantage of any unforeseen opportunities that may arise that are not identified in the schedule or
change the order of implementation if necessary. The information below is organized based on specific
needs from the City of Paris citizens, and revised In 2018. The general idea is to create one great and
easily accessible park in each of four major areas of the city. Tbis will allow all residents the opportunity
to recreate at a large redeveloped park within the community. The four specific parks, Wade Park,
Markel SCILuare Park, Oak Park, and the Sports Corniflex/Dragon Park, were chosen based on their
locations within the city, size, accessibility, and community usage.
Beyond the plans ten year time -frame:
As is true of city planning in general --of which parks, recreation and open spaces planning is a
component ---this implementation schedule should be evaluated, modified as necessary, and updated to
address ten-year periods that begin after 2013, 'The Texas Parks and Wildlife Department suggests ten-
year plans should be updated every five years; however,, the City of Paris should review the plan
annually in order to have a current, meaningful and implementable plan. This will aid the Paris park
system to: continually work to achieve the park plans Goals and Objectives; allow this plan to remain
current with other City of Paris planning efforts; serve to address on-going financial needs; address parks
needs in conjunction with future population growth, and keep the users, citizens and businesses
continually aware of the city's commitment to achieve and maintain an outstanding parks, recreation
and open space system and program,
Projects Year Estimated cost Possible funding source(s)
1 Wade Park 2018-22
580,000 TFINVI) grants
NeNv playgiounds ( ieneral Fund appropriations
2
Renovate Pavdion
S(mcer field
Walking trail
Open lawn areas, picnic area
sirlaffl pavilion
Water i'vature
Oak Park
Neav playground
Ren( -ovate pa%,flion
Pri\fate donafi(:m's
Bond 1,)rc)cecds
parr tnersliips
2018-22 200,000 ITT l) gr"'.Ints
General Fund appropria6cmis
flrivatc donations
Ci1v ot'Paris Parks, Recreation& Open Space Master Plaro _1018-2023 Undate
40
PNn re="n Whty Partners]Jps
race phmlg mW 1wWwWing
3 aat leu aellLmv Par20 1'/- 19 24 7,0CH) TPWD gran0s
Anyground, elkinbing, GainAl lQuid appropikikms
Landscaphg Nvate MmUmts
Artil.)hidicater Gnieml Obhgalkm bond yvocee&
BMW parking. cmsmulks Parmership's
likuygmums
Wwnromi mmmmn
4 �i Dj(!:Ls "qg!2!!tj201 9 2q 8 1 o,w)()
UYmp taxa k uAl & bho Ines Paanemhys
Mygmund hivate donations
Add fighting N) field 4#7 Bond procecds
Mgmgc� GMCINA FUlixf appropiations
Rdmaw sUW puk
(Ack WX Ehagon w EAckson Imidge
5 QumN t raaaaa ",f:tN?.20 NA Gemml Fmd qTnTHmKns
Ndama Phi NhawMdocs
(`nails developnient Bmid proceeds
Rehcaw dA gWf' J'allr1rierships
Updaw LIS 271 signage INVI) tgants
6 !'
R(,T 201119 NA Geineral
Snows Ili ivate (101hitions
Special nec(ris children programs Panmrslmps
IMMY propwmmhig TPMM grants
('hiline enhancenwnts
F.nhanced swim,niing
Improved, expanded sports
Firay Imums & %WpIg w pool
7 QTyjq0Q1k 20 1 T12 I 90yoo TPWD granas
Rovate tennis courts General Fund appropriiijons
Renoisic MAMA court Privalc donations
Wamog Vol Andyacceds
CA ol"Pahs TOM
41
R eno vate pa v i ion P artnersh i p S
Opcn lawn area
Dog park
Landsc.,al)ung & sto arncnj�jes
Ne%v srmall phiy'ground
Convert baseball field to soccer
8
Nlain & Graham
20 1
,' 50,000 Gcw,al Fund
Open Iawn area
Privwe donalions
Landscaping, j_maiden
Parmerships
C ourlhouse wagon pockel park
Picnic area, beziches, mvings
Sl -tom trail
,9
, IN,
h I On Park
I — MT . . .... — h.
2022
350M0 111 W f) Pra n ts
Spray park
General F"und aj:NProjm i"itions
Soccer fkdds (8)
Pril"ate Clonations
I marl enhancements
Bond proceeds
Relocate Frisbeo gaff'
Paruref-ShipS
Bridges, trails
10
Trail fin
2013-23
500,000/mile Tl°6""1) gm 11 (s
Wesl Paris J rad
(icneral Fund appropriations
CnA-k trail, Dragon to Frickson 1-indge
]AD01 viihancemem grwj(,,i
NET Y completion
Private donations
Walking track (r ,
_r, new Fire Stalion P3
Bond proceeds
Sidewalks/TTV to downt4mri-t, Qr 11
Partnerships,
Schools, neighborhoods, etc,
C`omprehervJve bike &, wail plan
11
Renovate&.WjLajt_j,eOjj %J�jljjajjjs
2023-27
500,000 'EM"D grants
Open lawn area
Ocneral Fund appropriations
playground
Private domiflons
Latidscaping
Bond proceeds
Site amelifties
Partnerships
12
Indoor recreadon, & ilyie cejjtea,
2019-20
NA General Fund approp ri�.Idons
FeasihiMy study
Private donations
date
42
Parwersldp
13 Wisk, Field
flarmershijp�,
2017 NA General
ON of farisParky Rorrooti,-) pac«M sterPlan 2018-2023