1996-043-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-045 AWARDED RESOLUTION NO. 96-043 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 94-045, award the contract for Water Treatment Plant Expansion Vol. II - Controls & Instrumentation, being a part of Project 92WSRB03-92 to ED WILSON, INC.; and, WHEREAS, the City Engineer, Earl Smith, acting as projcct engineer of said projcct recommends the amendment of said contract by Change Order No. One and Final attached hereto as Exhibit "A", which provides for a net increase in contract price of $2,710.36 for the purpose of making modifications to Pat Mayse Pumping Station RTU #1; Booster/High Service Pump Station RTU #2; Local Operations - Program Additions; Local Operations, alarm Annunciator - Program Additions; Hardware Additions; Hardware Installation; Additional Travel Expenses; Pat Mayse/Lake Crook Ratio Calculator; Automatic Filter Backwash Initiation; GPM conversion on flow meters; Totalize Ground Storage Flow Meter; Chemical Feed Rate Adjustment Capability; Ground Storage Pump Control Logic; Turbidity Meters; and Control Signal to Backwash Turbidimeter Solenoid, for a total contract price of $367,710.36, and such form should be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL 01<' THE CITY OF PARIS, that the Water Treatment Plant Expansion Vol. II - Control & Instrumentation, being a part of Project 92WSRB03-92, contract is hereby amended by Change Order No. One and I<'inal attached hereto as Exhibit" A", providing for a net increase in contract price of $2,710.36 for the purpose of making modifications to Pat Mayse Pumping Station RTU #1; Booster/High Service Pump Station RTU #2; Local Operations - Program Additions; Local Operations, alarm Annunciator - Program Additions; Hardware Additions; Hardware Installation; Additional Travel Expenses; Pat Mayse/Lake Crook Ratio Calculator; Automatic Filter Backwash Initiation; GPM conversion on flow meters; Totalize Ground Storage Flow Meter; Chemical Feed Rate Adjustment Capability; Ground Storage Pump Control Logic; Turbidity Meters; and Control Signal to Backwash Turbidimeter Solenoid, for a total contract price of $367,710.36, which is in all things approved; and, BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. Clifford, be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. One and Hnal. PASSED AND ADOPTED this 13th day of May, 1996. E~::> ATTEST; ~~"...~~~~ 9035810178 BW&R TYLER TX. F-987 T-186 P-005 MI'IY 06 '96 17:36 CHANGE ORDER (Ill!llnll:lians on reverse aide) No 1 - Final PROJECT. .l!MIl!'.. 'J:,Il".~\I!"!1~..fJiW); J~l\Pjlns ion Volume II - Controls & Instrumentation DATE OF ISSUANCE ............................... EFf'EcrJVEDATE ........................................... OWNER .. St-: ~Y..R~.. r.!'.t;~.~.................................................................................. .......... OWNER's CoIIInCl No. ..~.?~~M!!~::?L,............. CONTRACrOR .~:.~....l!g:'!9]lt..1..11'......... ENGINEEll. ..~J!I'.lJ!;....HM;J.~l!..Q..I!jl.~;U..{t... ......... You an: direc:Icd to amkc the rollowing chanp:s in the Contract Docu_. 0.....;"""'" See Attachment a-rorc",OnIcr. See Aeeachmene ^tDK:lubcms: lList d.,...."""". ~ clwlle) See Attachment CHANGE IN CON'I'RACf PRICE: 0riPa0I c-o... Price CHANGE IN CONTllACrTJMES: 0ri8i00I c-o... T_ "" "C +1 ~ Per Contract -. for tmoI.....-, --- $ 365.000.00 Nct__..-~OnlootNo._..N.._ $ 0 N......._ "'"'"""'~Ordon No._ so No._ N/A - $ 365.000.00 ConUllcI T_,...... IhiI ~ 0nIe< s...... c.. .' . ..: Per Contra.ct Rddy for _ paynal; --- ConUllcI Price"'" so this ~ 0nIa' Nee_f" .oCllila.-OnIe< 1 2.710.36 N..'....... ._. ortllis a....o 0nIe< o Davs - ConUllcI PrIoe _.. __ ~ Ordon ConUllcI1'iaIes willl.u __ ~ Ordon So" . '''" Per Contraet . aadr lor.... p8J'1DCIIIC --- $367.710.36 RECONMENDED: AJItIItOV1!n AlXEI't1tD: By: .......~----, By: o.............~ EriC S. Clifford. Mayor IloIr. By: ~~..........' IloIr. - E1CDC No. 1910-3-8 (I9lJ1l1!ditionl ~by.... e....,._c-... D A=: "lie ...._ by The A_GaomoI C APPIlOvED AS TO FOIII: . or "-icL ""tUe C\IIlD1II9- City Clerk T.,K. Haynes CIty Att....., EXHIBIT A . 9035811J178 BW&R TYlER TX. F-987 T-186 P-1J1J6 MAY 1J6 '96 17:36 ATTACHMENT TO CHANGE ORDERNO.l-FINAL PARIS, TIiXAS - WATER TREA TMl!NT PLANT EXPANSION VOLUME n - CONTROLS &: INSTRUMENTATION 1. Pat Mayse Pumping Station RTU #1 A All pump items $545.00 B. Operator Interface, covered by proposal 112 $0.00 C Controls for one pennanganate feeder have been installed. the spec required two. (Deduct) 1) Jnstallation. 3 @ $420 $1.260.00 3) Programming, 3 @ $109 $ 329.00 ($1,581.00) D. Power Failure Sensor (Deduct) 1) Programming, 3 @ $36 $108.00 2) Installation. 3 @ $100 $300.00 ($408.00) 2. Booster/High Service Pump Station (RTU #2) A) All pump program additions $1,596.00 B) Ground Storage Pressure &: flowrate added in lieu of chlorine &: turbidity transmitters $0.00 C) Pump Room High Water Alarm is extra $36.00 D) Power Failure Sensor (Deduct) 1. ProgranUning, 5 @ $36.00 $180.00 2. Installation. 6 @ $150 $900.00 ($1,080.00) 3. Local Operations - Program Additions A Al;cess Level Sensitive Password Protection provided In lieu of Report Generation per proposal #2 $0.00 B. Filter Limit Swi.tm indication $288.00 C. Filter reprogramming required to accomtnodate Pratt controllers on Filters 1-6. $1,449.00 Contractor will re-tune filters as necessary after control ciIcuits lit power circuit, have been isolated. D. All pump run lime meters $936.00 E. Recycle meter $72.00 F. Power Failure Sensors, 8 @ $36.00 (Deduct) ($288.00) 4. Local operations, alarm lIJ1JlUnciator (Prog Add.) A All alarm annunciators $504.00 B. Chlorine Pressure Alarm, 2@ $72.00 $144.00 . 9035810178 BW&R TYLER TX. F-987 T-186 P-007 MJ:lY 06 '96 17:36 ATIACHMENT TO OIANGE ORDER NO.1- FINAL PARIS, TEXAS - WATER TREATMENT PLANT EXPANSION VOLUME n - CONTROLS &: INSTRUMENTATION Page 2 5. Hardwwe Additions A. One 8 pt I/O Genius BIQCk to acrommodate the effluent valve switch additions and the Filter Basement High Water Alarms 6 Allied Switches (for alum, caustic, and fluoride pumps) $1,111.00 $49.00 B. 6. Hardware Installation A. B. C. D. Filter Limit Switch Input Toggle Switches are extra Recycle meter installation Power Failure Sensors InstalJation 8 @ $200 (Deduct) $1,680.00 $348.00 $420.00 ($1,600.00) 7. Additional Expenses Hotel 4 pts/day (53/4) Meals Travel 14 nights .. 14@$25/day= 3 RT@ 200 x 0.28 miles " 3@3HR/RT@$60/Hr" $608.36 $350.00 $168.00 $540.00 $1,666.36 8. Pat Mayse/Lake Crook Ratio Calculator (Deduct) ($375.00) 9. Automatic Filter Backwash Initiation (Deduct) ($l.soo) 10. GI'M conversion on flow meters (Deduct) ($50.00) 11. Totalize Ground StOIage Flow Meter $72.00 12. ~ Feed Rate Adjustment Capability $510.00 13. Ground Storage Pump Control Logic (Deduct) ($1,000) 14. Turbidity Met~ 9 @ $100 (Deduct) ($900.00) 15. Control Sp to Backwash Turbidimeter Solenoid, 2@ 36 $72.00 TOTALAD)USTMENT: $2,710,36