Loading...
1996-042-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-110 AWARDED RESOLUTION NO. 96-042 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 94-110, award the contract for the Water Treatment Plant Expansion, 92WSRB03- 92 Project to ARCHER-WESTERN CONTRACTORS, LTD.; and, WHEREAS, the City Engineer, Earl S. Smith, acting as project engineer of said project recommends the amendment of said contract by Change Order No. Three and ,,'inal attached hereto as Exhibit" A", which provides for a net decrease in contract price of $39,560.69 for the purpose of making modifications to Installation of Turbidity Backwash sensor; Training Room conduit runs and wiring; lime silo control panel; installation of additional conduit and wiring for turbidity meters, particle counters and Pratt Actuators; extra work on a time and material basis to the Filter Building West Stairway; extra work on a time and material basis on the existing grouted joints in the underdrain of Filter No.1; extra work on a time and material basis for the addition of canopy to front entryway of main building; and deleting Item 1455, patching existing asphalt; Item 17, extra 3,000 PSI Concrete; Item 18, extra 2,000 PSI Concrete; Item 19, extra crushed stone and extra foundation pier footage; Item 21 extra handrail; and Item 22, extra filter underdrain, for a total of $4,806,281.37, and such form should be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY 01<' PARIS, that the Water Treatment Plant Expansion, 92WSRB03-92 Project, contract is hereby amended by Change Order No. Three and Final attached hereto as Exhibit "A", providing for a net decrease in contract price of $39,560.69 for the purpose of making modifications to Installation of Turbidity Backwash sensor; Training Room conduit runs and wiring; lime silo control panel; installation of additional conduit and wiring for turbidity meters, particle counters and Pratt Actuators; extra work on a time and material basis to the Filter Building West Stairway; extra work on a time and material basis on the existing grouted joints in the underdrain of Filter No.1; extra work on a time and material basis for the addition of canopy to front entryway of main building; and deleting Item 1455, patching existing asphalt; Item 17, extra 3,000 PSI Concrete; Item 18, extra 2,000 PSI Concrete; Item 19, extra crushed stone and extra foundation pier footage; Item 21 extra handrail; and Item 22, extra filter underdrain, for a total of $4,806,281.37, which is, in all things, approved; and, BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. Clifford, be, and he is hereby, authorized and directed, on behalf of the City of Paris, to execute said Change Order No. Three and Final. PASSED AND ADOPTED this 13th day of May, 1996. I ~ Eric S. Clifford, Mayor ATTEST: \ \' 9035810178 BW&R TYLER TX. CHANGE ORDER F-987 T-186 P-009 MRY 06 '96 17:37 (Il111n1Clions 011 mme side) No 3 & Final PRCUECT.~~~~~_I~~~~~~H~.?!~~~.~~~~nsion Volume 1 - Exvansion I\4.TE OF ISSUANCE .m........................... EPFECI1VE D.\TE ........................................... OWNER .. ft~y.. Rt. !'.'~t;:!.",................................,.....,. _............................ ......... -.. _n........ OWNER', CoclIDct No. ..?~".~!l:I!~~::R................ CON'TRACTOR ..g~l,t!!r.-:R'''-~~m.......... Contractors, Ltd. ENGINEER ..~!!!'.I]!'..,.,H1-.gf.)!..lt.,~t~Mf............ You are ~ 10 IIIllke the foIIlIwinlI ~ in the CoaIract O""""'....ts. Deler/plioa: See Au:achment Reasoa for Cbansc 0nI0r: See Attachment At1a(ld"eatl' (USuloclIlllelllS SIowu'li.,. cbaa8e) See Attach_nt CHANGE IN CONTIUlCT PRICE: ClrieiooI~JIriI:c CHANGE IN CONTRACTTIMES: 0JiIiIaI ~...... s 4.783.965.00 '0 ~('" .r r . -,........ ...-: Per Contract --- NcI____"- ~0IlIIn "".LIO No.-L S 61.877.06 N........_,..- 0...<0.-.. N.. _18 No'_ N/A - ~ """"'" '" IIIls Cboo8o 0I*r ~ r............. tlois CldolF Older S' -:"'11"'.. ([lien' Per Contract _'r....... ....-: --- $ 4,845,842.06 "..__'VlIllisCllloFOnkr s C39.560.69) ".._I_'VlIIIlsO"'<OIder o Days - ~JIriI:c_..__~OIlIIn c-.ar..... _aII__Cb008000*n St' I ; Ie ...' . Per Contract -........ ..-: --- s 4.806.281.37 R!COMMENDI!D: APPIlOVI!D: ACCEPnIl: 81" .......~......) By: u.-...:..........~I EdC S. Cl1ft,ord. Mayor Dalo: By: c...wl.......,....,..' Dalo: Dole: EJCDC NO. 1910-8-8 (1990 Edldon) Pl.,..,s 11)'.... .,.,....._ ~ 0 ~ ~.... _ by Tho . '-4 Geamd c..__. VI-. AT7ISt', APPIlllvEo AS 'l'O FORII: !lattle l;UIIII>IIqIWI T.K. 1la7D"$ Cltr Clerk Clty Attomt\')' EXHIBIT A 9035810178 BW&R TYLER TX. F-987 T-186 P-010 MAY 06 '96 17:37 ATTACHMENT TO CHANGE ORDER NO.3 - FINAL PARIS, TEXAS - WATER TREATMENT PLANT EXPANSION VOLUME I - EXPANSION Under the terms of the above tefeI enced contract, the following modifications in the scope of work: are submitted.. 1. Ins@llation of TuIbidity Backwash sensor as detailed by letter dated January 29,1996. . . . . . . . . . . . . . . .. . . . . .. . . . .. Add $2.166.80 2. Make modifications to the Training Room conduit nms and wiring as detailed by letter dated February 20,1996. . . . . . .. . . .. . . . . . . .. ................... Add $601.45 3.. Make modifications to the lime silo control panel as detailed by letter dated Febmary20,1996................................................. . Add $6,686.23 4. Installation of additional conduit and wiring for tuIbidity meters, particle counters and Pratt Actuators as detailed by letter dated March 26, 1996................................................... Add $20,699.53 5. Extra work perfotmed on a time and material basis to the Filter Building West Stairway as detailed by letter dated April2, 1996 . . .. . .. . . .. '.' .. . .. . . .. . . .. . .. .. . . .. Add $454.05 6. Extra work performed on a time and material basis on the existing grouted joints in the underdrain of Filter No. 1 as detailed by letter dated April 2. 1996 . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Add $451.85 7. Extra work perfonned. on a time and material basis for the addition of canopy to front entryway of main building. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Add $8,419.40 8. Delete Item 1455 from Contract (patch Exlstlng Asphalt not used) .. .. .. . . .. .. . .. . . .. . .. . . . . . . . .. . . .. .. . .Deduct $12,500.00 9. Delete Item No. 17 from Contract (Extra 3,000 PSI Concrete not used) . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Deduct $5,000.00 10. Delete Item No. 18 from Contract (Extra 2,000 PSI Concrete not used) .. . .. . . . . . .. . . . . .. .. . . .. .. . .. .. . .. ... Deduct $8,000.00 . 11. Delete Item No. 19 from Contract (Extra Crushed Stone not used) ......................................... Deduct $1,440.00 91335810178 BW&R TYLER TX. F-987 T-186 P-Bl1 MRY 136 '96 17:38 AITACHMENT TO CHANGE ORDER NO.3 PARIS, TBXAS- WATER TREATMENT PLANT EXPANSION VOLUME I - EXPANSION Page 2 12. Delete Item No. 19 from Contract (Extra Foundation Pier Footage not used) . .. . . . . . . . . .. . .. . . . . .. . .. . . .. ... Deduct $1,500.00 13. Delete Item No. 21 from Conlmct (Extra Handrail not used) .............................................. Deduct $8,000,00 14. Delete Item No. 22 from Contract (Extra Filter Underdrain not used) , . .. .. . . . .. . . .. . . . .. . . .. .. .. .. .. .. . .. Deduct $42,600.00 1he estimated net amount deduct in the Contract Amount D\le 10 Change Order No, 3 is $39,560.69.