Loading...
10 - Code & Demolition ReportsItem No. 10 Code Enforcement Re ort: Se Member 2018 Work crew re,ogrt for September 3-7, 2018 Monday – September 3`a Holiday Tuesday – September 4th Worked on all equipment this am. Right of ways. ... ......... _ 1. 18-01899 722 SW 3`a _......_ — ...... ... 2. 18-01706 731 SE 3rd 3. 18-01705-- _,.. 705 SE 3`a Wednesday, September 5th –Friday, September 7th Due to rain ... we worked on tires A total of 10 loads totaling 593 tires plus 7 semi tires were taken from 18th NW and Henderson to disposal site. Work crew report for Se'p tember 10-14, 2018 Rained all week. Monday – September 10th Started working tires on back lot of City shop. Tuesday – September 11th Worked on tires on back lot of City shop. Wednesday - September 12th Worked on tires on back lot of City shop. 244 Tires, 13 Semi tires and 9 Tractor tires have been moved from the back lot to the disposal site. That makes a total of 837 tires, 20 semi tires and 9 tractor tires between last week and this week. Thursday – September 13th Worked on right of ways. Friday –September 14th Worked on right of ways. ............. 2 18 01768 F1 387 NW 3rd Map 2"a NE Alley - Work crew reort for September 17-21„ 2018 Monday — September 17th Right of ways. Tuesday — September 18th Right of ways. (Clarksville) 1. Map .... ...... 547 Fitzhugh 2. — 2. 18-02431 18-02420 1809 E Cherry _ 3. 12".__. 33 SE 15tH 18-01181 1_600 MLK 18-01170 4 5. 18-00061 1200 Blk NW 18th.._ -- 620 NE 2nd 6. 18-01072 ,,,, .. 1100 B I k..N W Stn 7. 6 1111_ _ ..--- — i..01634 8 ......rr_. 18-01118 .. _4 SW 7th 414 & 42. 1111... _ _.... ......... -- 7. ...... �......__ 18-00874 1005 W Shiloh ,1111.... 8—_. ...11 �. , .. 8-00924 ---...... 1028 W Shiloh 1111_..- 9. 18-01382 1560 W Campbell ........... ,,. _. 1-1111, 1-- 18- 0076..._..600 7 W S 1hiloh _. 11. . m 1111. 18-01132.....__ _ ........... 204 NW 241h 1600 MLK — received a call from 1645 MLK that the w ork crew was disturbing her dogs while mowing the vacant lot next to her .... lol! She was not happy and talked to Robert also. We cannot please these people. She said if her dogs were upset it upset her. I'm sure she's the one that called in the vacant lot for being grown up. Right of ways. Tuesday — September 18th Right of ways. (Clarksville) 1. 18-02430 306 Clarksville St. _ 2. — 18-02431 50 5 Clarksville St 3. 18-01707 12".__. 33 SE 15tH 4 18-01170 �. ._._ 7 NE 2nd 5. .. _.,__ 18-01171 620 NE 2nd 6. ,. ....,. 18-01295 8.�.......... 13 SE Stn 7. _ ..--- — i..01634 8 50 1-205-511 NE 11th Mass mow around TG Givings. Mow Fire Field Pick up electronics from Fair Grounds and hold until e -cycle. Wednesday - September 191h 1. 18-01191 North of 1030 Meadowlark 2.� �. _...__ 18-01262 810..x... NE 3151 ..�........_ ... 3. 18-0...,,._ 1837 2 006 Maple _ 4. _ 18- 01484 1200 Martin Luther King _ _ 5. 18-00730 Behind 1322 MLK on Van Zandt �� � ,..r..andt .— 6 18 00729 MLK on Van Z . Behind 1322 M 7 18-00728 1200 Blk (1230 MLK) Van Zandt F-- 18-00727 Across street from 120 1 8 -00 726 1322 MLK _.._. 5 MLK........... Thursday –September 20th 1. - 18.01660 1739 W........... -.e Walker 2. . �. 1111 18-01661 1111 � , ____ 1725 W Walker 3. I'll ._e ® 18-01377 1716 W..................b Campbell .....A 4. . ..�.._._._—_ 18-01664 25 NW 31St 5 18-01151 _._ .. 170 NW 33`d 6. —._ 18-01961 1460 W Shiloh m...__..- ._ 7.18 01957 1600 Blk W Shiloh ----................... I­­­1­____________--- 8. ........................................... 18-01959 1640 W Shiloh �._..._,,,,— 9. ......... 18-00766 _._ 1546 W Shiloh ........ 10. 18-00765 1540 W Shiloh _ , ._.m.. 11.... 18-01836 2m........... 006 Bonham .. 12. . 18-01260 ... _ 1111... r.... 880 NE 31s' Friday – September 21St ..11111.1111. 1. ------- ....... 18-01480 .._ ....... .-11.11 ----- 140 . 2 18-0.1482 1414 W Cherry - – 3 18-019511-11---11 — . 758 W Shiloh ... 1111 — 4 _.18-01956 � ..�.....__ 690 W Shiloh 5. 18-01958 1650 W Shiloh Work crewega rort_for September 24-,2,8,,,, Rained off and on all week. Monday – September 24th Worked on mowers and shop. Tuesday – September 25th Worked on soccer fields all day removing trees. Wednesday – September 26th Worked at soccer fields all day removing trees. Thursday – September 27th Replaced banners downtown. Weed eated some of the right of ways. Friday — September 28th Remove more trees from soccer fields. Smoothed the dirt/ground at soccer fields where we removed the trees. Building and Standards Report: September, 2018 tures were t: resented to the commission: 1037 SE 6" 405 SW 5th 415 SW 5th 948 SE 5th 956 SE 5th No structures were demolished due to the rain