1994-136-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 93-064 RESOLUTION NO. 94-136 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 93-064, award the contract for RAW WATER TRANSMISSION MAIN FROM PAT MAYSE LAKE TO CITY OF PARIS WATER TREATMENT PLANT, EDA Project No. 08-01-02814 to KENCO, INC.; and, WHEREAS, the City Engineer, Earl Smith, acting as project engineer of said project, recommends the amendment of said contract by Change Order No. Four attached hereto as Exhibit "A", which provides for a net increase in contract price of $15,881.20 for a total of $3,700,080.00 for Modifications to intake walkway support brackets due to deteriorated condition of existing intake concrete from weathering, and such form should be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the RAW WATER TRANSMISSION MAIN FROM PAT MAYSE LAKE TO CITY OF PARIS WATER TREATMENT PLANT, EDA Project No. 08-01-02814 contract is hereby amended by Change Order No. }'our attached hereto as Exhibit" A" , providing for a net increase in contract price of $15,881.20 for a total of $3,700,080.00 for Modifications to intake walkway support brackets due to deteriorated condition of existing intake concrete from weathering, which is in all things approved; and, BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Don Shelton, be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. Four. PASSED AND ADOPTED this 10th day of October, 1994. tk~ Don Shelton, Mayor ATTEST: ~ ~'>...\..",\. Mattie Cunningham, City Cle A~d::' CHANGE ORDER Order No. Four Date: October 4, 1994 Agreement Date: July 12, 1993 OJECT 36" Raw Water Transm.;ss<on Ma<n NAME OF PR: ~ ~ . ~ Job No. 92 WSRB 02-92 OWNER: City of Paris CONTR..~CTOR: Kenko, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: Justification: Modifications to intake' walkway support brackets due to deteriorated condition of existing intake concrete from weathering. Change to CONTRACT PRICE: Original CONTRACT PRICE S 3.657,005.80 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3,685,198.80 The CONTRACT PRICE due to this CHANGE ORDER will be [increased]~ by: S 15,881.20 , The new CONTRACT PRICE including this CHANGE ORDER will be $3,700,080.00 Change to CONTRACT TIME: The CONTRACT TIME will be [increased) f@'e\Kl\,~ by 90 calendar days. The date for completion of all work will be January 14, 1995 Approvals Required: . To be effective this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLE- MENTAL GENERAL CONDITIONS. Requested by: (Date). Kenko, Inc. Recommended by: Ordered by: Acceeted by: City of Paris Federal Agency Approval [where applicable) Hayter Engineering, Inc. CONTJIlIACT OOCUWEHTS "OR CONSTJIlUCT10H OF "OEAAU.Y ASSIST'EC WATEA AND SEWE" PROJECTS JOel ft...., No. 10 0..,.. ens-: lfao;. 1 01 , EXHIBIT A /' ) f\ [i C I') , c;, ~ -;'"t- - 1--1 (.., / J KENKO~ Attn: Mr. Michael Donnan , (( < ,: ,:rca"~'u. ~'\.-" \I i "- J~_'- '/ q-!' 1"'1 I ~ I'~,./..-:., rr"" r "" /\ ' .', I ,... \. .'v 'J :""j' :r' J ,,-" \ - -r . "L' ~/. ,~ .",,~. . r--,:::.- Ly." ,'J>' .... . 'l.(t.v~ ',11 [,1> - I .....-c ::1." t p, .",l:If ' ~ .<,'"' .r-')J.-; /', C.(1"!#<" ',' V. vi~(!() ,vi' I 1 r:<:' ~ tc y!--"'" II '\...,-l.....(t ,,,,,,'iI'-);';, c!. :..,. l - ",r' I ,',-",. .. ./, ',' .j>- I) -, wl- ll/ / e ." , ",\..I>- /. . -' ".;.. :'J;,A.'l'I/L/' [v/.l.,.., " il" ''- ( ..., , (;I/" :,1 C.' / , i CONTRACTORS I "I '1)..,'..- ...' August 27, 1994 Hayter Engineering, Inc. 4445 S.E. Loop 286 Paris, TX 75460 Re: 36" Raw Water Transmission Main Job No. 92 WSRB 02-92 Paris, TX Kenko Job #9313 * Request for change order Dear Sirs: Attached is a letter from LaMarc revising the costs associated with the extra work you authorized due to the deteriorated concrete at the existing intake structure. Kenko respectfully requests a change order be initiated to encompass this extra work. The revised costs are as follows: work done by others contractors mark up total /1437,15" I 1,443.75" /6;e6'1. Zc extension of the contract time in the allowed for this change order. @ 10% S16,2GG.le -1 , I; 2 G .6-r 517,832.11 Additionally, an of 12 weeks should be amount Please call if you have any questions. Sincerely, M./!i ' Daniel R. F~~r;ge~ Kenko, Inc. SOlfll1WtsTt.RN DIVISION. 16415 Addison Rd.. Sle. 308 . Dallas. TIC 75248, (214) 931-9494 - rax (214) 931-5474 WtsTt.RN DIVISION - Post Office Box 831 -Callmesa. Callromla 92320 - (909) 795-2568 - rax (909) 795-1840 CORPORATr: orrlcr: - 1694 91st Avenue. alalne. Minnesota 55449 - (612) 786-6510 - rax (612) 786-6602 ~ LAI\IIARC, INC. Route 9 Box 1290 High\Nay 85 West Kemp. Tx 75143 general contractors Office: (903) 432-2117 Fax: (903) 432-2740 CHANGE ORDER NO. 7 TO: KENKO, INC. Mr. Dan Frettinger 16415 Addison Rd. Dallas, TX 75248 August 26, 1994 Re:Paris Raw Water Pump Station Modifications for Bridge Support-Cost Revised This work was authorized by Mr. Donnan, Hayter Engineering. Additiona 1 work due to deteriorated concrete at existing intake structure. 1. Pull test for engineer Generator $ Triple A Rental (Drill and rotary hammer) 3/4" x 5-1/2" Bolt Modifications for bridge support southwest fluids new bracket on structure M&R Maint. 3"x3"x 3/8" (7) angle iron Jenkins Rental hammer drill Hilti Tubes and bolts Hi1ti Cl00 Cartridge w/mixer Hi lti Jenkins Rental Compressor-Drill-Bits Morris Industries 36"x 1" s.s. rod w/nuts Luckett Crane Service Dozer John Dusenberry(400-455) Dozer James Bivens David Basterwench Truc~~ Lamarc, Inc. Labor ~/'\Tfos.@ $15.00 Labor M&R Maintenance ~J~rs.@ $40.00 /~ II II "3t Ii ~I /':", ((~ SUBTOTAL 15% P & OH Total 156.69 143.97 8.75 425.00 480.00 64.95 105.20 31.52 97.70 165.08 271.44 1,910.00 400.00 455.00 225.00 -3-; 045cOO ~e-.-OO ;!i...."... iJ{~ .X_ ,fJ<:;':...r,'(_C .. ~' ~.' '. -7 f....., "'I::.; (~ "- 2. ~"---"-4-30- /' c ,,-. '.:.: -:"/ --r-... ,"'- . '_/_' .' " ".:'" -2---121 80 ,;:; "':' .", . . , __i L.' ...J' _ . J , -__ ._ $ '1&-;266.10 ;..... 'r-:; : -."':-, This work has required an extension of 12 weeks additional time and overhead to our work. We appreciate the opportunity to be of service. I f you have any questions or if we may be of any further service please do not hesitate to call. ~RespectfullY SUb.mitted, /' cay. '-'- c....... Lamarc. 1 nc. John C. Amyx