Loading...
1994-119-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 93-064 RESOLUTION NO. 94-119 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 93-064, award the contract for RAW WATER TRANSMISSION MAIN FROM PAT MAYSE LAKE TO CITY O}' PARIS WATER TREATMENT PLANT, EDA Project No. 08-01-02814 to KENCO INC.; and, WHEREAS, the City Engineer, Earl Smith, acting as project engineer of said project recommends the amendment of said contract by Change Order No. Three attached hereto as Exhibit" A", which provides for a net increase in contract price of $7,433.69 for a total of $3,685,198.80, for: I) Furnish and install replacement check valve for raw water pump #4 discharge piping; 2) Furnish and install 2 EA valve manifolds for high and low pressure lines connecting to two differential pressure transmitters, and such form should be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the RAW WATER TRANSMISSION MAIN FROM PAT MAYSE LAKE TO CITY OF PARIS WATER TREATMENT PLANT, EDA Project No. 08-01-02814, contract is hereby amended by Change Order No. Three attached hereto as Exhibit" A" , providing for a net increase in contract price of $7,433.69 for a total of $3,685,198.80 for: I) Furnish and install replacement check valve for raw water pump #4 discharge piping; 2) Furnish and install 2 EA valve manifolds for high and low pressure lines connecting to two differential pressure transmitters, which is in all things approved; and, BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Don Shelton, be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. Three. PASSED AND ADOPTED this 12th day of September, 1994. IkJf#- Don Shelton, yor ATTEST: ~\.\:\. ...~,~ Mattie Cunningham, City rk APPROVED AS TO FORM: / /' / CHANGE ORDER Order No. Three Date: August 22, 1994 Agreement Date: July 12, 1993 NAME OF PROJECT: 36" Raw Water Transmission Main Job No. 92 WSRB 02-92 OWNER: City of Paris CONTRACTOR: Kenko, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: justification: 1. Furnish and install replacement check valve for raw water pump #4 discharge piping. 2. Furnish and install 2 EA 3 valve manifolds for high and low pressure lines connecting to two differential pressure transmitters. Change to CONTRACT PRICE: Original CONTRACT PRICE $ 3,657,005.80 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3.677.765.11 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) ~~ by: $ 7,433.69 The new CONTRACT PRICE including this CHANGE ORDER will be $ 3.685.198.80 Change to CONTRACT TIME: The CONTRACT TIME will be ~ (decreased) by 4') calendar days. The date for completion of all work will be October 16. 1994 (Date]. Approvals Required: To be effective this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT. or as may otherwise be required by the SUPPLE- MENTAL GENERAL CONDITIONS. Requested by: KENKO, INC. Recommended by' . HAYTER ENGINEERING, INC. O,d".d by ~ ~ Accepted by: ~ ~.. . CI 0 PARI Don Shelton, Mayor Federal Agency Approval (where applicable] CONTRACT DOCUMENTS FOR CONSTRUCTION OF FEDERALl.Y ASSISTED WATER AND SEWER PROJECTS Document No. 10 Change Order: Page 1 of , EXHIBIT A