11 - Automatic Barscreen Project Close OutItem No. 11
J
TO: City Council
John Godwin, City Manager
FROM: Doug Harris, Director of Utilities
SUBJECT: AUTOMATIC BARSCREEN PROJECT CLOSE OUT
DATE: 06/17/2019
BACKGROUND: McInnis Brothers, Inc. was awarded the bid for installation of an automatic
barscreen at the flow equalization facility during the 03/12/2018 City Council meeting.
STATUS OF ISSUE: The project was substantially complete on February 1, 2019 and the
equipment has been in operation since that time. Based upon inspection by City staff and the
project engineer Hayter, Engineering, Inc., the project work has been completed in accordance
with the contract documents.
BUDGET: $51,920.71
RECOMMENDATION: Accept public improvements, release retainage, and authorize final
payment to McInnis Brothers, Inc. in the amount of $51, 920.71.
H AYT E R
ENGINEERING. INC
Planners Surveyors Engineers
June 14, 2019
Mr. Doug Harris, Director of Utilities
City of Paris
PO Box 9037
Paris, TX 75461-9037
Re: Flow Equalization Basin Barscreen – Pay Request #14 & Final
Mr. Harris —
HEI # 180070-300
Transmitted herein please find Pay Request #14 and Final, which has been executed by the contractor and
the engineer.
Based on the pre -final inspection, and city concurrence, we believe that the work has progressed to the
point represented by the request, the quantities have been verified, and to the best of our knowledge,
information and belief, the quality of the work is in accordance with the contract documents.
We therefore recommend payment, contingent on council approval, in the amount of $51,920.71 as
shown on the attached request. Including this request, you will have paid the contractor 100% of the
contract amount and will have released all retainage.
This recommendation for payment is subject to the various provisions contained in Section 14.02 of the
General Conditions, and any corresponding portions of the engineering service agreement.
Please let me know if you have any questions.
Sincerely,
HAYTER ENGINEERING
Kevin R. Wanhoozier, P.E.
Project Manager
®��..OF ..
.. .........�5,�1►//„ � 1.1 l ; ,,
f
KEV04 R. VANH00ZIER j
127925 : 2 /�
attachment: Pay Request # 14 & Final
For More than 60 Years: Practical Solutions for Your Infrastructure Needs
4445 SE Loop 286 1 Paris, TX 75460 1 P 903.785.0303 1 www.hayterengineeringinc.com
TBPE #F-315 I TBPLS #10028600 1 ASBPE #2521 1 OSBPE/LS #603 1 LA #EF6529
Texas I Arkansas I Oklahoma I Louisiana
McInnis Brothers Construction, Inc.
119 Pearl street
Minden, LA 71056
PARTIAL PAYMENT REQUEST
Pay Request No. 14
From: 6/1/2019
To:
6/30/2019
Name of Owner: City of Paris
Owner's Address: P.O. Box 9037,
Paris, TX 75461
Engineer: Hayter Engineering, Inc.
Engineer's Address: 4445 SE Loop 286, Paris, TX 75460
Project Name: Flow EQ Basin
Barsereen
Project Number: HEI #180070
Contract Price (Including Change Orders): $1,038,414.13
Item No...,
m,...... ..... µ........ ..r .m.... - e Ori in..
g al Bid
Description of Item
_ _ , .. w........ ...... m.., ..,
Unit of Original Bid Quantity
Completed
. .........
Quantity Total
Completed Quantity
...... ..__..... ..
Total Value
Quantity
Measure Unit Price This Month
Previously Completed
Completed
1
Mobilization ......_-. j......
LS 60 000.00 0.00
1 1, 00
SO.00O.OD
Barecree n &Concrete diversion structure,
.,
------ ___
Including gates and stop gates, stairs and
platform, handrals, grating, transducer 1
LS 352,862.00 0.00
1.00 1.00
352,882.00
supports, excavation and connection to
inlet
���cendmoueet 'l i"
3
......_.._.caw
mmmechanicat barscreen, 2 ultrasonic
n"Vers and 1 Boat 1
LS 300,000.00 0.00
1.00 1.00
300,000.00
316 SS washer and compactor with flexible_0...._w
4
transition chola 1
LS 8Q000.00 0.00
1.00 1.00
80,000.00
---
_ _ P',.
Lidctnc&pl 1 _
-0
LS 25 OOD.00 0 00
.. _A
1 00 100
.
25 00�,Oq
Site work, including erosion control,
, __.! -A..�...
_......
- _
8
1
0redln0 oulvertsand drainage„
LS 20,000.00 0.00
1.00 1.00
20,000.00
Yard piping, including 36" and 42" PVC
1
sewer line, fittings, 1/2" and 2" PVC water
LS 80,000.00 0.00
1.00 1.00
80,000.00
7
Imes, backeow rp eventerand yard hdrants.
._..
8
,,.-- -- -
Concrete driveway, including curb, 398
earthwork, and retainin walls
- _... .., ,... .....- ----------- _.-., -.
syd 100.00 0.00
......... _.._...
398.00 398.00
39,800.00
9
_._
8 to man roof chs, link
_
m Ift 40 00 0.00
34.00 34.00
1,360.00
tell g ate 1
-
ea 3x000 00
p
� 00 1 00
3000.00
,
Replace stop gates n existing diversion
1�
structu8,
re
LS 40,000.OD 0.00
1.00 1.00
40,000.00
12 --_..e
handralis xlsm dlverslon_
C3retivt & ... . _._..
O
�..
-........
Q..
14
'O
0
m.. . _._0 .�
00.00
Fencing 361
lft 5 000
361 00 67 00
18805.00
Re
move and dispose
p existing sewer
m _ v_0.00, _
, „ , _
�'""
livres and manholes after new concrete 1
LS 5,000.00 0.00
1.00 1.00
5.000.00
15
ce
structure Is mlrleted
16
i' mmm . .
Materials lesLp: 1
.....
m. , w, ..,,,,,,
LS 7 353 00 0.00
1 00
. .
7 353 00
rder 1
21414 13
-'1"66
1 00 00
TOTALS ._.... .... .......... _ _.-'
LS
- _0.00 „.....
-1
.....:1,036
43
%%lil
Completed to Date:
$1,038,414.13
,or
� OF Tei
Stored Material:
$322,611.47
��(Q .- "' "' •: �S ��,
* ` Completed
Materials Installed
and Stored to Date
$322,611.47
$1,038,414.13
Less 6% Retsinage:
$0.00
;.....•/
Less Previous Payments:
$986,493.42
'
KEV IN R. VANHOOZIER Amount Due This Application:
$61,920.71
.... ...................y
of Work 'r�tjl3r�oMrs n appxeo on amount to discharge contractors ""male otdrgaeore
cauractor mrttlies Ilial to me beat of its knomedpe 1) all premus progress payments received hom Omer SWIS-oso.1wo
i.ed in connection with Work coveted by prior Applications for Payment. 3) life of ell Work materials and Ar"Mor Udl Wa 0110 to a covered by this Application for Payment vef pass to gvmer at lane of
free earn ria eactm interests
payment
by this Application
Appfand
mei encumbrances except as are mums
fa Payment Is ir accordance with the Contract Oocumenls by a
h not tlefectrve.
sto�vnv1 any suU,
Cleric sepmlY interest or ances
31 oris covefetl
. ...
�G
µH
r y N A
@ M1snd
4d
0
Engineer
Signature and Date:14�.�
,
Owner Signature and Date
Contractor Signature and Date 4 w m m mm mi
w� •
_ ._........
...... ,... ..... n
On -Site Observer Signature and Date: