1994-099-RES WHEREAS, the Texas Department of Transportation provides funding for Statewide Transportation
RESOLUTION NO. 94-099
WHEREAS, the Texas Department of Transportation provides funding for Statewide
Transportation Enhancement Program grants; and,
WHEREAS, the City Council of the City of Paris is desirous of processing an
application for the Statewide Transportation Enhancement Program grant for the WALKER
PARK SURFACE WATER RUNOFF POLLUTION AND FLOOD MITIGATION
PROJECT at a total cost of $276,000.00, with $220,800.00 to be provided by grant and
$55,200.00 to be provided by the City of Paris in the form of local funds and in kind services;
NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS:
I. That an application be made to the Texas Department of Transportation for a
Statewide Transportation Enhancement Program grant for the WALKER PARK SURFACE
WATER RUNOFF POLLUTION AND FLOOD MITIGATION PROJECT in the amount
of $220,800.00, being approximately 80% of the estimated cost of the transportation
enhancement project, with the City of Paris providing $55,200.00 in kind services and funds.
2. That Michael E. Malone, City Manager of the City of Paris, be, and he is hereby,
appointed as the Authorized Official of said project and is authorized and directed to execute on
behalf of the City of Paris the application for grant in the form attached hereto as Exhibit A.
3. That Earl Smith, City Engineer, be, and he is hereby, appointed as Project
Director and is hereby authorized to execute and deliver on behalf of the City of Paris all
reports, communications, assurances and documents necessary for the completion of said project.
4. That W. E. Anderson, Director of Finance, be, and he is hereby, authorized and
directed to serve as the Financial Officer for said project and to receive and distribute funds for
the WALKER PARK SURFACE WATER RUNOFF POLLUTION AND FLOOD
MITIGATION PROJECT.
PASSED AND ADOPTED this 8th day of August, 1994.
~-~
Eric S. Clif ord, Mayor Pro
ATTEST:
f'Y'.~~ .\..~'->-~
Mattie Cunningham, City Clerk
APPROVED AS TO FORM:
/
Putting New Faces on Familiar Places
Project Nomination Form
Second call for project nominations
Published in the Texas Register May 17, 1994
Nomination period: May la-Aug. 16, 1994
Texas Department of Transportation
Statewide Transportation Enhancement Program
f.6HIBltA
PROJECT NOMINATION FORM
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
provided for by the
Intermodal Surface Transportation Efficiency Act of 1991
Project Evaluation and Selection will be determined by the information submitted in this nomination form
or required attachments. Supplementary information is optional and may delay processing.
PART I. GENERAL INFORMATION.
PROJECT NAME:
DATE:
1 . CONTACT PERSON (name/title):
A. SPONSOR:
B. AFFILIATION:
C.ADDRESS:
D. CITY:
E. STATE:
F. ZIP CODE:
H. DAYTIME TELEPHONE: I. FAX NO.:
(person TxDOT may contact for further information)
2. TEST OF PROJECT ELIGIBILITY. The proposed project must have a direct
relationship of Function, Proximity, or Impact to the Intermodal Transportation
System. Please check the appropriate box(es} below that show(s} the candidate
project's relationship to transportation system.
D A. Function
D B. Proximity
D C. Impact
An original and eight copies of the completed nomination package must be
submitted to TxDOT by 5:00 p.m., Tuesday, August 16, 1994. A list of local
TxDOT district offices and their addresses is included at the end of the
nomination form. For further information or assistance in completing this
nomination package, please contact your local TxDOT district enhancement
coordinator.
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 2
Nomination
Form
3. ELIGIBLE CATEGORIES OF THE CANDIDATE PROJECT. Check only the
categories in which the project has legitimate activities. It is not necessary
to check every box.
o 1. Facilities for Pedestrians and Bicycles
o 2. Acquisition of Scenic Easements and Scenic or Historic Sites
o 3. Scenic or Historic Highway Programs
o 4. Landscaping or Other Beautification
o 5. Historic Preservation
o 6. Rehabilitation and Operation of Historic Transportation Facilities
o 7. Preservation of Abandoned Railway Corridors
o 8. Control and Removal of Outdoor Advertising
o 9. Archaeological Planning and Research
o 10. Mitigation of Water Pollution due to Highway Runoff
4. TYPE OF NOMINATING ENTITY. Please check the appropriate categories.
o A. County
o B. City
o C. Metropolitan Planning Organization (MPO)
o D. An Agency of the State
o E. Council of Governments
o F. Local Transit Operator
o G. State Agency
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 3
Nomination
Form
5. NOMINATING ENTITY.
A. NAME:
B. ADDRESS:
C. CITY:
D. ZIP CODE:
E. CONTACT PERSON:
F. TELEPHONE:
G. FAX NO.:
6. PROJECT LOCATION.
A. CITY/COUNTY:
B. TxDOT DISTRICT(S):
C. ROUTE NUMBER/STREET NAME/FACILITY NAME:
D. PROJECT LIMITS:
From
To
E. PROJECT LENGTH:
7. ESTIMATION OF FUNDS REQUIRED. Following selection by the Texas Transportation
Commission and approval by FHWA, all projects will be funded on a cost-reimbursable basis. Costs
Incurred before this time are not allowable. Be as accurate as possible. An inaccurate estimate may
result in an unexpected increase in the amount of funding required for the local match. Estimated total
project cost must Include 10% for project administration, design, engineering, and contingencies.
Year Funds Local Match Total Project Cost
Required
I I $ I $ I $ I
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paoe 4
Nomination
Form
PART II. PROJECT SPECIFIC INFORMATION
A. PROJECT DESCRIPTION. On a separate sheet, provide a clear and concise description of the
proposed project, including all work to be performed, right-of-way, easements required, or other
property interests, special land uses planned, and any relationship between the project and any other
work. The description should consist of one 8'12" x 11 ,. sheet with a of a maximum of one page of
single-spaced text. This sheet must be labeled. "ATTACHMENT 1. PROJECT DESCRIPTION."
B. PROJECT IMPLEMENTATION PLAN. On a separate 8'12" x 11" sheet, include a one-page,
single-spaced schedule of project activities and sn itemized budget, indicating any circumstances likely
to affect commencement of work or time required to complete project. Project budget should include
all proposed local financing. Give as much detail as possible as to the cost of each proposed activity.
The project budget must include 10% for administration, design, engineering, and contingencies. This
sheet should be labeled. "ATTACHMENT 2. SCHEDULE AND 8UDGET..'
This information should be accompanied by documentary evidence of a commitment to provide for a
locsl match. The documentary evidence should be in the form of an official action by a duly constituted
governing body. The document from this body may consist of a one-page letter in the form of a
resolution, a minute order, or commissioner's court order that provides for a commitment of local match
of funding. The letter should include a recommendation that the candidate project be considered for
enhancement funding. The nominating entity may provide this certification if it is a public authority.
Where appropriate, the letter should show the consistency of the project with long-range transportation
plans for the area. This letter should be labeled. "ATTACHMENT 3. CERTIFICATION OF FUNDING
COMMITMENT."
For projects within an MPO, provide a letter from the MPO stating that the project will be included in
the local Transportation Improvement Plan ITlP), if approved for funding. This letter should be labeled.
"ATTACHMENT 4. INTENT FOR TIP PLACEMENT:'
C. PROJECT LOCATION INFORMATION. Attach a map delineating the project location.
Indicate project limits, areas of major work and all existing and proposed transportation facilities and
rights-of-way. As appropriate, include original photographs of the existing project site, a site plan of
proposed construction, and illustrations of proposed work. Photographs may be used to indicate
proximity from a roadway of sufficient classification. Documentation of the project location should not
exceed six 8"2" x 11" pages. The map and any accompanying documentation should be labeled,
"ATTACHMENT 5. PROJECT LOCATION INFORMATION...
D. LAND ACQUISITION INFORMATION. If land will be acquired or other property interests
are Involved, describe on a separate 8'12" x 11" sheet how it will be acquired, including cost estimates
and funding arrsngements. The land acquiSition information should not exceed one page of single-
spaced text. This sheet should be labeled, "ATTACHMENT 6. LAND ACQUISITION INFORMATION."
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 5
Nomination
Form
E. CONSTRUCTION INFORMATION. If construction will be required. briefly discuss
below how it will be accomplished. Include cost estimates.
F. FACILITY OPERATION AND MAINTENANCE PLAN. Routine operations
and maintenance costs are not allowable enhancement costs. If a facility is
being proposed, discuss below how it will be operated and maintained. The plan will identify all
parties responsible for operation and maintenance. Estimate the annual cost to maintain said
facility, describe the source of those funds, identify expected annual gross income from the
facility, if any, and describe the intended use of that income.
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 6
Nomination
Form
PART III. PROJECT BENEFITS, IMPACTS, AND PUBLIC SUPPORT.
A. PROJECT USE AND BENEFITS. Describe below the benefits of the proposed
project. Description should include expected use of any facilities involved and should compare
current use with expected use and projected demand for use of the those facilities.
B. COMMUNITY INVOLVEMENT. Provide evidence below of community involvement.
support and public participation. Include a description of any opportunities for public
participation in the process of selecting candidate projects. Include resolution(s) or other official
document(s) from the governing body of each city and county with jurisdiction over any area in
which activities associated with the project would take place. Label the resolution Is}
ATTACHMENT 7.
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 7
Nomination
Form
D. POSSIBLE PROJECT IMPACTS. Indicate possible impacts
enhancement project on the resource categories listed below.
of the proposed
GENERAL
Following is B checklist of environmental fBctors. Fo, each of the/isted factors, answer the question of whether your
proposed project would have been B Beneficial fB) effect, 8 Neutral (N) effect, or an Adverse fA) effect. Fo, example,
would your project create any significant Land-Use Change, or is it Consisttmt with Local Plans? Would it have any
beneficial or adverse Economic Impacts?
Many transportation enhancement projects will have minor, if any, impacts on these listed factors. However, it is
important that each factor is considered and your response is indicated in the appropriate box.
Note: Check only one box for Bach line. Do not skip any lines.
:: Key to Imp.ct6: B=benefici.J; N = Neutr.J; A =.dver6e; n/.=not .pplic.b1e.
FACTORS Type of Impact B N A nla
Socio.Economic Facton Land-use Change/Consistency with Local Plans D D D D
Economic Impacts D D D D
Impacts on Neighborhoods/Community Cohesion D D D D
Relocation of Residences/Businesses D D D D
Impacts on Churches/Schools D D D D
Title VI Impacts (Le., impacts to ethnic, minority, elderly, D D D D
disabled, or other groups)
Potential for Controversy Yes No
R..ourc. F.ctor. Section 4(f) Properties (publicly.owned parks, recreation areas,
wildlife and waterfowl refuges, and all historical sites (in public
or private ownership) included on or eligible for the National D D D D
Register of Historic Places)
Historic Sites and Districts D D D D
Archaeological Resources D D D D
Recreation Areas D D D D
Wetlands D D D D
Aquatic Preserves (wildlife and waterfowl refuges) D D D D
Stream Modification D D D D
{Continued on next p.ge]
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 8
Nomination
Form
D. POSSIBLE PROJECT IMPACTS. Indicate possible impacts of the pro-
posed enhancement project on the resource categories listed below.
Type of Impact B N A n/a
R..ource Facto.-.. Wild and Scenic Rivers D D D D
continued
Floodplains D D D D
Threatened and Endangered Species D D D D
Farmland Conversion D D D D
Agricultural Operations D D D D
Hazardous MaterialsIWastes D D D D
Energy-Use Impacts D D D D
Construction Impacts D D D D
Tree Removal D D D D
Phyaical Environment Water Quality D D D D
Noise D D D D
Attainment of Air Quality Standards
D D D D
Other Factors Visual Impacts D D D D
Impacts on Utilities and Railroads D D D D
Pedestrian/Bicyclist Considerations Yes No
Detours; Temporary Closures of Roads/Ramps Yes No
Changes in Access Control
Yes No
PERMITS &
CLEARANCES Navigational Permits (Section 101 Yes No
Section 404 Permits Yes No
Section 106 Clearance Yes No
Texas Antiquities Permits Yes No
NPDES
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 9
Nomination
Form
BOTH SIGNATURE BLOCKS MUST BE COMPLETED BEFORE THE PROJECT
NOMINATION CAN BE CONSIDERED FOR THE STATEWIDE TRANSPORTATION
ENHANCEMENT PROGRAM.
The sponsoring entity indicated below hereby recommends that this project be selected for funding
through the Statewide Transportation Enhancement Program and attests a commitment to the project's
development, implementation, construction, maintenance, management, and financing.
SIGNATURE OF SPONSOR'S AUTHORIZED REPRESENTATIVE:
Michael E. Malone, City Manager
NamefTitle
Signature
P. O. Box 9037
Address
DateAugust 8, 1994
PariR Tp"x;:J~
City/StatelZip Code
7,)4fil
The nominating entity indicated below hereby agrees to provide TxDOT with a prioritized ranking of
all enhancement projects submitted for nomination by that entity. Projects will be listed by name and
in the priority order determined by the nominating entity. The ranking list indicating project priorities
must be received by the TxDOT office no later than 90 days after publication of the call for candidate
project nominations in the Texas Register.
SIGNATURE OF NOMINATING ENTITY'S AUTHORIZED REPRESENTATIVE:
NamefTitle
Signature
Nominating Entity
Date
Address
City/StatelZip Code
STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM
Paae 10
Nomination
Form
NOMINA TION FORM CHECKLIST
1 . Read the T xDOT booklet, Putting New Faces on Familiar Places, for general information.
2. According to the booklet, determine which of the three tests for eligibility the proposed project
addresses; function, proximity, or impact.
3. Determine which of the 10 categories of enhancements the proposed project addresses.
4. Determine who will act as the candidate project's sponsor.
5. Determine who will act as the nominating entity. Obtain a commitment from the nominating
entity to nominate the candidate project. Identify a contact person who will act as the
representative for the nominating entity.
6. Identify source of local match (funding source I and determine appropriate public authority
funding commitment.
7. Identify local TxDOT office.
8. Obtain a copy ofthe nomination form and instruction booklet from TxDOT. Review instructions
and TxDOT Guide (see Item 1).
5. Complete the nomination form. Do not skip any parts without an explanation on the
appropriate page. Your local TxDOT district office may be able to offer assistance if questions
arise.
6. Obtain the necessary attachments required by the nomination form. These are listed in the
nomination form as ATTACHMENTS 1 through 6.
7. Review nomination materials for completeness. Make a copy for your records.
8. Send completed nomination form to the local TxDOT district office. It is recommended that
the form be sent by registered mail.
9. The nominating entity must supply the TxDOT district office a list showing the prioritized
ranking for all candidate projects nominated within 90 calendar days of the call for projects in
the Texas Register.