Loading...
09 - Demolition and Code Enforcement Activity ReportsItem No. 9 Code Enforcement Re ort: Au ust 2019 Cases Worked: 322 Cases Completed: 502 Initial Inspections: 311 Re -inspections: 579 Lots Abated: 277 Other Work by Abatement Crew: Mowed 6 Right -of -Ways Mowed Loop 286 Cleared 11 Brush piles Removed Tires from 9 lots Removed 3 Illegal Dumps Mowed Cemetery at 17th & Price Mowed Compost Site Mowed 2 Ditches BuiU ng and Standards Re ort ,Au us , 2019 6 Structures were presented to the Commission: 643 NW 41h 435 NE 61h 448 NE 6th 1009 NE 8th 1480 Hickory 433 Grove 3 Structures were demolished: 348 SW 13th 304 E Neagle 133 NE 14th