Loading...
09 - Demolition & Code Enforcement ReportsItem No. 9 Code Enforcement Report: September 2019 Cases Worked: 150 Cases Completed: 382 Initial Inspections: 148 Re -inspections: 462 Lots Abated: 231 Other Work by Abatement Crew: Mowed 5 Right -of -Ways Mowed Nature Trails at Lake Crook — 2 days Cleared Brush — 6 days Removed Tires —1 day Removed Illegal Dumps — 3 days Repaired Equipment — 5 days Mowed Ditches —1 day Assisted Other Departments (Hung banners downtown, fairgrounds) — 3 days qg§cring and Standards Re ort: Se tember 2019 6 Structures were presented to the Commission: 322 NE 17th 564 W Cherry 1034 NW 19th 373 NW 5th 714 Oak 418-420 SE 10th 1 Structure were demolished: 565 SE 12th