Loading...
09 - Demolition & Code Enforcement ReportsItem No. 9 Code Enforcement Report: October 2019 Cases Worked: 189 Cases Completed: 141 Initial Inspections: 189 Re -inspections: 273 Lots Abated: 152 Other Work by Abatement Crew: Mowed 6 Right -of -Ways Mowed Loop 286 — 3 days Tree Removal — 6 days Removed Tires —1 day Removed Illegal Dumps —1 days Repaired Equipment — 6 days Mowed Wise Field —1 day Mowed Behind Civic Center —1 day Assisted Other Departments (Set up for Festival of Pumpkins, worked downtown) — 5 days Building and Standards Report: October„ 2019 S Structures were presented to the Commission: 1061 NE 17th 485 NW 27th 1017 NE 5th 580 SW 3rd 322 NE 17th 4 Structure were demolished: 1415 E Polk 737 NW 14th 617 NW 4th 1524 E Price