09 - Demolition & Code Enforcement ReportsItem No. 9
Code Enforcement Report: October 2019
Cases Worked: 189
Cases Completed: 141
Initial Inspections: 189
Re -inspections: 273
Lots Abated: 152
Other Work by Abatement Crew:
Mowed 6 Right -of -Ways
Mowed Loop 286 — 3 days
Tree Removal — 6 days
Removed Tires —1 day
Removed Illegal Dumps —1 days
Repaired Equipment — 6 days
Mowed Wise Field —1 day
Mowed Behind Civic Center —1 day
Assisted Other Departments (Set up for Festival of Pumpkins, worked downtown) — 5 days
Building and Standards Report: October„ 2019
S Structures were presented to the Commission:
1061 NE 17th
485 NW 27th
1017 NE 5th
580 SW 3rd
322 NE 17th
4 Structure were demolished:
1415 E Polk
737 NW 14th
617 NW 4th
1524 E Price