Loading...
09 - Demolition & Code Enforcement Activity ReportsItem No. 9 Code Enforcement Report: November, 2019 Cases Worked: 102 Cases Completed: 77 Initial Inspections: 102 Re -inspections: 131 Lots Abated: 70 Worked all of West Paris for New Storage Container Ordinance Other Work by Abatement Crew: Mowed 6 Right -of -Ways — 1 day Tree Removal — 4 days Removed Tires — 6 day Removed Illegal Dumps — 8 days Repaired/Serviced Equipment -2 days Mowed Wise Field —1 day Hauled Tires — 2 days Building and Standards Report: November 2019 11 Structures were presented to the Commission: 950 MLK 900 BLK of Corporation Street 1460 W Hickory 906 E Polk 827 NW 1311 1003 NE 511 635 NW 1311 1114 W Austin 1191 E Grove 1381 W Kaufman 1 Structure was demolished: 339 NE Stn Code Enforcement Report: December, 2019 Cases Worked: 68 Cases Completed: 119 Initial Inspections: 68 Re -inspections: 132 Lots Abated: 66 Worked all of East Paris for New Storage Container Ordinance Other Work by Abatement Crew: Mowed 6 Right -of -Ways — 2 day Tree Removal —1 days Removed Tires — 9 day Removed Illegal Dumps — 4 days Repaired/Serviced Equipment — 2 days Hauled Brush — 2 days Buildine and Standards Reoort: December. 2019 There was no BSC Meeting in December 5 Structure were demolished: 141 NW 2511 151 NW 2511 405 NW 511 415 NW 511 133 NE 8th