Loading...
1991-045-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 90-097, award the RESOLUTION NO. 91-045 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 90-097, award the contract for 10th Street S.E. Sewer Line Replacement Project No. 88-WSRB- 09-90 to Bill Hazelwood, Inc.; and, WHEREAS, the City Engineer, Earl Smith, acting as project engineer of said project recommends the amendment of said contract by Change Order No. Three attached hereto as Exhibit "A", which provides for a net increase in contract price of $19,999.00 for a total of $442,291.00 for rerouting the 12" line south then east to maintain minimum slope and to move line out onto City right-of-way., and such form should be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the 10th Street S.E. Sewer Line Replacement Project No. 88-WSRB-09-90, contract is hereby amended by Change Order No. Three attached hereto as Exhibit "A", providing for a net increase in contract price of $19,999.00 for a total of $442,291.00 for rerouting the 12" line south then east to maintain minimum slope and to move line out onto City right- of-way, which is in all things approved; and, BE IT FURTHER RESOLVED, That the Mayor of the City of Paris, George Fisher, Jr., be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. Three. Passed and adopted this 13th day of May, 1991. ~ iff'; ~ - ~_ 0b/V---rJ , Gorge Fis er, Jr., Mayor ATTEST: Mattie Cunningham, City ity Attorney CHANGE ORDER (Instructions on reverse side) No. Three (Name, Address) lath SE Sewer Line Replacement City of Paris P.O . Box 9037 Paris, Texas 75461-9037 DATE OF ISSUANCE: April 24, 1991 PROJEcr: OWNER: CONTRAcrOR: Bill Hazelwood, Inc. OWNER's Project No. 88 WSRll-09-90 ENG J:NEER: CONTRAcr FOR: Construction of approximately 5214 L.F. 4" ~ 6", 10", 12" Sanitary Sewer ENGrnEER's Project No. with appurtenances. You are directed to make the Collowing changes in the Contract Documents. tkscription: Adjustment of contract prices as shown on the attachment. Purpose ofCbaoge Order. The 1211 line will be rerouted south then east to maintain minimum slope and to move line out onto City right-of-way. This construction will delete part of the original.job. Some additional 6" line will be installed not shown on the AttaetuDents: (List documents supporting change) original plans. The time extension will cover the extra work as well as the 6" water' line work CHANGE J:N CONTRAcr PRICE:' CHANGE J:N CONTRAcr TIME: Original (Antract Price Original (AntnlCt Tune s $449,779.90 July 3, 1991 UTI_Guc Previous Change Orders No 1 to No. 2 Net change from previous Change Orders $422,292.00 o ..,.. s (AntnlCt Price prior to this Change Order (Antract Tunc Prior to this Change Order $427 707 no July 3, 1991 s .uTI.'" $19,999.00 Net Increase (decrease) of this Change Order 30 Net Increase (docxoaso:) of this Change Order s - (Antraet Price with all approved Clange Orders (Antraet TIme with all approved Change Orders s 5442.291. 00 August 2, 1991 -<<- RECO-MMEl'::IED:- .1J'PROVED: CITY OF PARIS, PARIS, 7X APPROVED: by U\cIl>C'Cr by G F'''''''''''h' eorge J.5 er, Qt.,"}:c:R. by c...nlr-.c\.Ol' ~..:lyot' AT'I'EST: ~attie (u~ni~gham. Cicy Clerk EXHIBIT A Item H2..... Items to be deleted Description Estimated Ouantity Unit Price Total 2 12" SDR 35 PVC gravity sewer, in place, tested, cleaned up (line 6 Sta 3 + 50 to 5 + 36) 186 L.F. $16jL.F. $2976.00 8 Standard MH 6' deep with I watertight ring & cover 9 Extra .MH depth 1 V.F. Sub-Total 1163 EA 1163.00 100 EA 100.00 l1.60jL.F. 997.60 14.70jL.F. 1470.00 1. 40jL. F. 140.00 $6,846.60 11 0-5' Trenching 86 L.F. 12 5-8' Trenching 100 L.F. 16 Trench Safety 100 L.F. Add 220 L.F. of 6" class 160 PVC sewer line @13.60jL.F., lID L.F. of 0-5' trenching @ 11.60jL.F., 110 L.F. of 5-8' trenching at 14.70jL.F., 2 service transfers at 500.00 EA, one standard cleanout at 280 EA, and 20' of 6" DIP @ 18.01jFT, all not originally on plans, for a subtotal of $7245.20. Additions = Additions = Deletions = $ 7,245.20 19,600.40 6.846.60 Net Increase $19,999.00 Attachment to ohange Order #3 lOth SE Sewer Line Replacement City of Paris, Paris, Texas April 24, 1991 Bid Item NQ.... Items to be added Descriotion 12" SDR 35 PVC gravity sewer, in place, tested, cleaned up 7 Standard MH 6' deep with standard ring and cover 2 8 Standard MH 6' deep with watertight ring & cover 9 Extra MH depth 10 Drop inlet structure 11 0-5' Trenching 12 5-8' Trenching 13 8-10' Trenching 16 Trench Safety 18 4" Service Transfers 25 Standard Cleanout 27 Concrete Ditch Repair Estimated Ouantitv unit Price Total 496 L.F. $16/L.F. $7936.00 1, $1080 EA 1080.00 I $1163 EA 1163.00 3 V.F. $ 100 EA 300.00 I $ 340 EA 340.00 295 L.F. $11.60/Ft 3422.00 156 L.F. $14.70/Ft 2293.00 45 L.F. $21. OO/Ft 945.00 201 L.F. $1.40/Ft 281.40 2 $500 EA 1000.00 1 $280 EA 280.00 5 L.F. $112/L.F. 560.00 Sub-Total $19,600.40