Loading...
1991-123-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 91-019, award the CHANGE ORDER (Instnlctions on reverse side) No. One and Final (Name, Address) Southeast Area Lift Station Area I?ATE OF ISSUANCE: November 25, 1991 C-88-WSRB-II-90 City of Paris, Texas P.O. Box 9037 Paris, Texas 75461 CONTRACTOR: Atkins Brothers Equipment Co., ~'s Project No. r_RR_lJC:::PR_l l_on PROJECT: OWNER: ENGINEER: Hayter Engineering, Inc. CONTRACT FOR: Wastewater Collection System Replacement Lines ENGINEER's Project No. You are directed to make the following changes in the Contract Documents. Description: See Attachment "A" Purpose of Change Order: See Attachment "B" Attachments: (List documents'supporting change) Attachments "An and liB" CHANGE IN CONTRACT PRICE: CHANGE IN CONTRAct TIME: Original Contract Price 454,986.00 Original Contract Tune $ 180 days days<<date Previous Change Orders No to No. Net change from previous Change Orders o $ 0 "" Contract Price prior to this Change Order Contract Tune Prior to this Change Order S At;;/l, \)s:~ nn o days or date Net Increase ~fthis Change Order Net Increase (decrease) of this Change Order 56.591.00 o "" $ Contract Price with all approved Change Orders Contract Time with all approved Change Orders s <; 1 I <; 7 7 no 180 days .."or4alc by ....- by 0..... George Fisher, O\<INER APPROVED: ATKINS BROTHERS EQUIPMENT CO, by .....~ RECOMMENDED: HAYTER ENGINEERING, INC. APPROVED: CITY OF PARIS, PARIS, TX Mayor ATTEST: Mattie Cunningham, City Clerk . EXHIBIT A ATTACli:MENT "A" CHANGE ORDER NUMBER ~ AND FINAL Item No. Description and Quantity 1. 6" SDR 35 PVC gravity sewer complete, in-place, embedded and tested (deduct 557 LF @ $7.00/LF) 2. 8" SDR 35 PVC gravity sewer complete, in-place, embedded and tested (add 389 LF @ $8.00/LF) 3. 10" SDR 35 PVC gravity sewer complete, in-place, embedded and tested 4. 12" SDR 35 PVC gravity sewer complete, in-place, embedded and tested (deduct 20 LF @ $11.00/LF) 5. 6" DIP gravity sewer complete, in-place, embedded and tested (deduct 90 LF @ $13.00/LF) 6. 10" DIP gravity sewer complete, in-place, embedded and tested (add 30 LF @ $19.00/LF) 7. 12" DIP gravity sewer complete, in-place, embedded and tested (add 20 LF @ $25.00/LF) 8. 6" Cl. 160 SDR 26 PVC gravity sewer, complete, in-place, embedded and tested (add 122 LF @ $8.00/LF) 9. 8" Cl. 160 SDR 26 PVC gravity sewer, complete, in-place, embedded and tested (add 20 LF @ $13.00/LF) 10. 10" Cl. 160 SDR 26 PVC gravity sewer, complete, in-place, embedded and tested (deduct 30 LF @ $17.00/LF) 11. St'd ME 6' deep, complete, in- place, w/st'd ring and cover (add 11 EA @ $l,317.00/EA) Add Deduct o 3,899.00 3,112.00 0 o 0 o 220.00 o 1,170.00 570.00 0 500.00 0 976.00 0 260.00 0 o 510.00 14,487.00 0 RESOLUTION NO. 91-123 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 91-019, award the contract for WASTEWATER COLLECTION SYSTEM REPLACEMENT LINES, SOUTHEAST LIFT STATION AREA, PROJECT No. 88-WSRB-11-90 to Atkins Brothers Equipment Co., Inc.; and, WHEREAS, the City Engineer, Earl Smith, and Reeves Hayter, Hayter Engineering, Inc., acting as project engineer of said project recommends the amendment of said contract by Change Order No. One and Final attached hereto as Exhibit "A", which provides for a net increase in contract price of $56,591.00 for a total of $511,577.00 for adjusting as-built quantities from as-bid quantities, and such form should be approved, and the Mayor should be author ized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that WASTEWATER COLLECTION SYSTEM REPLACEMENT LINES, SOUTHEAST LIFT STATION AREA, PROJECT No. 88-WSRB-11-90, contract is hereby amended by Change Order No. One and Final attached hereto as Exhibit "A", providing for a net increase in contract price of $56,591.00 for a total of $511,577.00 for adjusting as-built quantities from as-bid quantities, which is in all things approved; and, BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, George Fisher, be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. One and Final. Passed and adopted this 9th day of December, 1991. ~ t~ G ~ilher, Mayor ATTEST: , ;) ~ '\ \. "^""'" ON'- ~ ~ie ~unningham, c~~er Ity Attorney 12. St'd MH 6' deep, complete, in- place, w/st'd ring and cover and inflow insert (deduct 6 EA @ $l,399.00/EA) 13. Add'l depth of st'd new or re- placement MH, complete, and in-place (add 26 LF @ $126.00/LF) 14. MH drop structure, complete, in-place 15. 0-5' depth trenching, including backfill and clean up (deduct 234 LF @ $11.00/LF) 16. 5-8' depth trenching, including backfill and clean up (add 501 LF @ $13.00/LF) 17. 8-10' depth trenching, including backfill and clean up (add 24 LF @ $16.00/LF) o 8,394.00 3,276.00 0 o 0 o 2,574.00 6,513.00 0 384.00 0 10-12' depth trenching, including 54.00 backfill and clean up (add 3 LF @ $18.00/LF) 18. o 19. 18' Hwy. bore, complete, in-place 0 0 excluding encasement 20. 4" SDR 35,PVC customer transfer 0 5,640.00 complete w/trenching, backfill, cleanout, clean up, near side (deduct 15 EA @ $376.00/EA) 21. 4" SDR 35 PVC customer transfer 7,632.00 0 complete w/trenching, backfill, cleanout, clean up, far side (add 8 EA @ $954.00/EA) 22. 6" SDR 35 PVC customer transfer complete, w/trenching, backfill, cleanout, clean up, near side (deduct 1 EA @ $502.00/EA) 23. St'd 6" cleanout complete, in- place, and clean up (add 1 EA @ $251.00/EA) 24. Gravel and/or rock driveway and street repair, complete in-place, and clean up (deduct 5 LF @ $5.00/LF) o 502.00 251. 00 o o 25.00 25. Asphalt driveway and street repair, complete, in-place and clean up (deduct 1252 LF @ $7.00/LF) o 8,764.00 26. Concrete driveway and street repair, complete, in-place and clean up (add 1487 LF @ $19.00/LF) 28,253.00 0 27. Resodding/reseeding lawns complete, in-place and clean up (add 125 LF @ $2.00/LF) 250.00 o 28. Misc. storm drainage replacement (line 19), complete, in-place and clean up o 0 29. Concrete sidewalk and curb and gutter replacement (line 19) complete, in-place and clean up (add 60 LF $32.00/LF) 1,920.00 0 30. Concrete box culvert (Campbell St) 0 complete, in-place, including assoc. sewer replacement, drainage ditches, backfill, street repair and clean up o 31. Trench Safety provision 528.00 (add 528 LF @ $1.00/LF) o 32. Existing ME Rehabilitation Inflow insert, installed and 0 complete (rehab. tech. #1) (deduct 1 EA @ $188.00/EA) 188.00 33. Reset exist. ring and cover 0 outside pavement, installed and complete w/chimney seal (rehab. tech. #2) (deduct 1 EA @ $879.00/EA) 879.00 34. New st'd ring and cover 0 w/inflow insert outside pavement installed and complete, w/chimney seal (rehab. tech. #3) (deduct 3 EA @ $l,185.00/EA) 3,555.00 35. New st'd ring and cover, 0 w/inflow insert inside pavement, installed and complete w/concrete pad (rehab. tech. #4) o 36. Raise exist. ring and cover 0 972.00 0"-6", complete, in-place and clean up (rehab. tech. 115) (deduct 1 EA @ $972.00/EA) 37. Seal exist. precast ME wall 0 878.00 joints, complete, in-place and clean up (rehab. tech. 116) (deduct 2 EA @ $439.00/EA) 38. Seal isolated defects in exist. 0 314.00 ME walls, complete, in-place and clean up (rehab. tech. 117) (deduct 2 EA @ $157.00/EA) 39. Seal exist. ME joints between 0 251.00 wall and invert, complete, in- place and clean up (rehab. tech. #8) (deduct 1 EA @ $251.00/EA) 40. Rebuild exist. ME invert and 0 1,004.00 benches, complete, in-place and clean up (rehab. tech. 119) (deduct 2 EA @ $502.00/EA) 41. St'd replacement ME, 6' deep, 7,652.00 0 complete, in-place w/st'd ring and cover and inflow insert (rehab. tech. #10) (add 4 EA @ $1,913.00/EA) 42. Pavement repair for replacement 0 690.00 and/or new MH, complete, in-place and clean up (rehab. tech. 1111) (deduct 2 EA @ $345.00/EA) 43. Concrete over asphalt/service ditch-line (add 765 LF @ $12.00/LF) 9.180.00 0 44. Concrete Per Square Yard (add 133.2 SY @ $35.00/SY) 4,662.00 0 45. 8"Ductile Pipe (add 410. LF @ $16.00/LF) 6560.00 TOTALS $97.020.00 $56,591.00 $40,429.00 Contract increase ATTAC~ENT nBn CHANGE ORDER NUMBER 1 AND FINAL Justification: 1. The project was originally bid to have existing asphalt streets which were open cut during the installation of a replacement sewer main or service line to be repaired with asphalt. In order to stay consistent with the policy of the public works department this repair item was changed from asphalt repair to concrete repair (Bid items *25, 26, and 43). 2. Examination of the manhole rehabilitation bid items (Bid items #32 thru 42) compared to manhole replacement bid item (Bid item #41) indicated it would be less expensive to replace four manholes scheduled for rehabilitation. 3. Line rerouting due to existing underground utilities and line extensions in order to provide service same as existing made necessary the addition of five new manholes (Bid items #12 and 13) . 4. The remainder of the quantity adjustments revise the "as bid" quantities to "as-built" quantities. These adjustments are brought about in general by minor adjustments in routing due to the locations of existing underground utilities or field changes due to other unforseen conditions.