Loading...
09 - Demolition and Code Enforcement ReportsItem No. 9 Code Enforcement Report; March 2020 Cases Worked: 162 Cases Completed: 128 Initial Inspections: 162 Re -inspections: 221 Lots Abated: 27 Other Work by Abatement Crew: Mowed 6 Right -of -Ways —1 days Tree Removal — 2 days Removed Tires — 9 day Removed Illegal Dumps — 7 days Repaired/Serviced Equipment — 2 days Worked at Wise Field Shop — 2 day Building,_and Stwawndardsw gport: March,,w2020 There were 9 structures presented to the commission: 2004 Cleveland 926 W Cherry 322 NE 17th 743 NW 4th 717 NW 4th 1758 NE 10th 142 Plum 387 NW 3rd 359 NW 12th 4 Structures were demolished: 716 E Washington 115 NW 131h 1214 W Kaufman 714 NW 4th