Loading...
09 - April Demolition & Code Enforcement Activity ReportsItem No. 9 Code Enforcement Report: April 2020 Cases Worked: 264 Cases Completed: 162 Initial Inspections: 249 Re -inspections: 122 Total Inspections: 371 Lots Abated: 38 Other Work by Abatement Crew: Mowed Loop 286 — 1 day Tree & Brush Removal — 3 days Removed Tires — 6 day Removed Illegal Dumps — 8 days Repaired/Serviced Equipment — 3 days Worked at Wise Field Shop —1 day Building and Standards Report: Aril 2020 There was no Building and Standards meeting in April due to Covid-19. 8 Structures were demolished: 420 NW 141h 430 NW 14th 1450 Hickory 1460 Hickory 1575 NE 34th 706 NE 1st 1214 W Kaufman 115 NW 13th