19 - Water & Wastewater Cost of Service StudyItem No. 19
TO: Mayor & City Council
Grayson Path, City Manager
FROM: Gene Anderson, Finance Director
Doug Harris, Utility Director
SUBJECT: WATER & WASTEWATER COST OF SERVICE STUDY
DATE: June 22, 2020
BACKGROUND: The City Council heard a presentation from our independent rate consultant,
Chris Ekrut of NewGen Strategies & Solutions, LLC at their June 8, 2020 meeting. Pursuant to
our water contracts, the consultant conducts a cost of service study every year. In addition to the
larger users that we are contracted with, the study determines the recommended water and
wastewater rates for all other water and wastewater customer classes: residential, commercial, and
industrial. The study is an important financial tool enabling the City to maintain the financial
integrity of the Water & Sewer (Wastewater) Fund.
This annual rate study and the City's rate maintenance policy are looked upon favorably by
Moody's and other credit rating agencies when the City is attempting to issue bonded indebtedness.
The City's current bond rating with Moody's is Aa3. Any decrease in this rating would cost the
City millions of dollars in additional interest over the life of a large bond issue such as the one
contemplated to fund a new wastewater treatment plant in the near future.
Adjusting the rates in accordance with the consultant's recommendations and our 2010 Rate
Maintenance Policy are critical and healthy steps to provide basic care and maintenance to our
Water and Wastewater system and ensure that the City is able to meet its debt payment obligations.
Our water and wastewater systems are critical infrastructure needed by every individual and
business in Paris.
STATUS OF ISSUE: At the June 8th meeting, the Council heard a presentation on the 2020 Cost
of Service Study. The presentation made it clear that current water and wastewater rates are
insufficient to cover the costs of operating the system. Two rate scenarios were put forth by the
rate consultant for consideration. Scenario 1 rates would generate revenue sufficient to cover the
full cost of operating the system as well as maintain reserves for debt service payment. Scenario 2
rates would generate revenue sufficient to meet the requirements of our rate maintenance policy
but would not cover the full cost of the service. Scenario 2 would require the City to utilize
$306,445 of its reserves to cover the revenue shortfall.
Choosing Scenario 2 rates would benefit customers in the short run, but with the impending debt
issue for the Wastewater Treatment Facility, this benefit would be very temporary at best. The
$306,445 from reserves used to implement Scenario 2 will have to be recaptured in future rate
increases as a new debt issue would trigger a larger debt service coverage amount, a new interest
& sinking fund, and a larger reserve fund, all of which is required per our Policy. The amounts of
these increases are directly tied to the amount of debt issued. For example, $60 million in debt sold
in the open market with a 30 year payback would cause the debt service coverage amount to
increase by $306,000, result in an annual principal & interest payment of $3,060,000, and require
the reserve to likewise increase by $3,060,000. This increase to the reserve could be accumulated
over a period of 5 years without adversely affecting our bond rating. If we were able to go through
the Texas Water Development Board to issue the bonds, the debt service coverage amount would
drop to $250,000, the annual principal & interest payment would drop to $2,500,000, and the
reserve increase to be accumulated over 5 years would also be $2,500,000. Scenario 2 would
impact this slightly, requiring us to rebuild what we would be giving up today in order to then
proceed to this new required amount in the near future.
To assist the Council in understanding the scope of what the Water and Wastewater Rates cover,
the following is a list of the departments supported by the rates:
1. Warehouse
2. Water Billing & Collection
3. Water Treatment Plant
4. Water Distribution (replacement, extension, repair)
5. Wastewater Collection
6. Wastewater Treatment Plant
7. Lift Stations
These seven departments have 72.5 full time equivalent employees which is 2.5 more employees
than they had ten years ago. The 39 employees that work at the treatment plants keep it manned
and operating 24 hours a day. The other departments operate a standard 8 hour day shift unless
called out on emergencies. These departments are critical to providing, treating, servicing,
replacing, extending, and responding to the Water and Wastewater System from source to water
facility to distribution system to house, to collection system and ultimately to wastewater facility.
In addition to personnel, there are primary costs associated with the water and wastewater system.
For example, chemical costs. Nine different treatment chemicals are bid annually to obtain the
most competitive prices possible. Electricity was bid out in 2018 through the Texas Coalition for
Affordable Power (TCAP) and through 2022 the City is only paying 3.18 cents per kWh for
electricity. We strive to hold costs down where possible. The current 2019-20 operating budget for
the system is $11,266,001. Five years ago the 2015-16 operating budget was $10,816,708. The
difference in those budgets is $449,293 or 4.15% over the five year period.
But there are factors that impact residential, commercial, and industrial rates that are beyond our
control. Examples are rainfall amounts, reduced consumption by customers, and how much each
customer class uses of the system as a whole. In this year's study, you would find that all of our
contract customers utilized less of the system than they used last year thereby shifting some fixed
system costs away from them and to the other customer classes pressuring their rates upward.
Looking forward to the Wastewater Treatment Plant, the City Manager, Utility Director, and
Finance Director spoke with Garver Engineering and NewGen on Thursday, June 18th regarding
potential Wastewater Rate scenarios to cover our operations as well as a new facility. It is strongly
recommended that a new facility be built, more on this will be provided in a near future City
Council meeting. We are currently experiencing an incredible low in interest rates throughout the
market, we have also sent in a pre -application to pursue a revolving loan fund through the State
which would further have great interest savings over a 30 year life. Nevertheless, we are currently
looking at a very large expense to build the facility which will need to be supported by the
Wastewater Rate. If the City were to approve proceeding with this project in 2020; design through
completion would take 3-5 years. It is at that time we would experience the full impact of a debt
service payment. It is strongly recommended that the City begin a healthy and gradual ascent in
its Wastewater Rate to prepare itself for this ultimate expense, but more importantly to acclimate
our users gradually over the span of 3-5 years rather than a sudden and drastic increase at the end.
Ultimately, debt payments will be owed when they come due, therefore being prepared with the
Wastewater Rate to afford these payments will prevent a drastic impact to the reserves or, much
worse, to taxes. City Staff will do all it can to look for opportunities to find savings in the design
and construction of the project, there will be some minor savings in efficiency through operation
and maintenance brought on by a new facility, the drastic reduction in infiltration that is occurring
between the City and the Facility currently will bring about some savings, and Staff will look for
an opportunity to refinance existing debt during this time if rates continue to hold low. Ultimately
though, it is the Staff and Engineer's recommendation that we strategically begin to address this
much needed project now, including adjusting our rates, to avoid the ultimate situation of being
forced to act by the TCEQ — or worse, suffer a failure of operation at the Wastewater Treatment
Facility. Adjusting rates pursuant to Scenario 1 would be a step in managing the ultimate impact
to users over the next 3-5 years.
BUDGET: The rate study cost is $28,500 similar to previous years. Funds are budgeted in the
Water Billing Office budget to pay for the study.
OPTIONS:
1. Adopt Scenario 1 rates which cover the full cost of service of the water and wastewater
system (note — this does not take in to account the Wastewater Treatment Facility, that will
need to be examined if and when the Council approves the design to proceed).
2. Adopt Scenario 2 which meets the minimum amount of our rate maintenance policy but
does not cover the full cost of service of the system and relies on reserves to make up the
shortfall (note — again, this does not take in to account the WWTF).
3. Adopt a third scenario to be specified by the Council — City Staff will be available to discuss
scenarios the council might have.
RECOMMENDATION: The staff recommends the Council, given the long term forecast with the
Wastewater Treatment Facility, adopt Scenario 1 rates.
ORDINANCE NO. 2020 -Scenario 1
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS,
AMENDING SECTIONS 34-22(b), "WATER RATES," AND SECTION 34-
23(a), (b) AND (c), "SEWER RATES—FOR CUSTOMERS USING CITY
WATER," OF CHAPTER 34 OF THE CODE OF ORDINANCES OF THE CITY
OF PARIS, TEXAS TO REFLECT CHANGES RECOMMENDED BY THE 2020
WATER AND SEWER RATE STUDY; PROVIDING A REPEALER CLAUSE, A
SEVERABILITY CLAUSE, A SAVINGS CLAUSE, A PENALTY CLAUSE; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, on the 8th day of June, 2020, the City Council of the City of Paris, Texas,
was presented a water and sewer rate study prepared by NewGen Strategies and Solutions
LLC, with certain findings and recommendations for proposed water and sewer rate
increases (a copy of which is on file with City Finance Department); and,
WHEREAS, on June 22, 2020, the City Council has determined that it is in the best
interest of the City of Paris and its citizens to implement the proposed rates for water and
sewer services recommended by the 2020 Water and Sewer Study by amending portions of
Article II, "Service Charges," Chapter 34, "Water, Sewer, and Sewage Disposal," of the City of
Paris Code of Ordinances;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
PARIS, TEXAS:
Section 1. That the findings set out in the preamble to this ordinance are hereby in
all things approved.
Section 2. That Subsection (b) of Section 34-22 of the Code of Ordinances of the
City of Paris, Texas, be, and the same is hereby amended to read in its entirety as follows:
"Sec. 34-22. Water rates.
"(b) Charges for water furnished by the City, measured in cubic feet, are
established as follows based upon customer class and meter size and
incorporate a base monthly cost which includes the cost for the first
increment of water, and a cost per one hundred (100) cubic feet or portion of
one hundred (100) cubic feet used above the first increment:
"RESIDENTIAL CLASS
BASE COST FOR FIRST SERVICE IN
METER SIZE INCREMENT EXCESS OF BASE
(Inches) (In Cubic Feet) (For Each Additional 100 Cubic Feet)
3/4 or less $12.47 for first 200 $ 4.59
Page 1 of 4
1 and Larger $ 60.85 for first 1,000
"COMMERCIAL/INDUSTRIAL CLASS
BASE COST FOR FIRST
METER SIZE INCREMENT
(Inches) (In Cubic Feet)
3/4 or less
$14.90 for first 200
1 through 2
$ 59.69 for first 1,000
3
$ 214.25 for first 3,000
4
$ 3,674.83 for first 100,000
6
$ 5,512.24 for first 150,000
8 and larger
$ 7,349.65 for first 200,000
$ 4.59
SERVICE IN
EXCESS OF BASE
(For Each Additional 100 Cubic Feet)
$ 4.50
$ 3.67
$ 3.67
$ 3.67
$ 3.67
$ 3.67
Section 3. That Subsections (a), (b) and (c) of Section 34-23 of the Code of
Ordinances of the City of Paris, Texas, be, and the same are hereby amended to read in their
entirety as follows:
"Sec. 34-23. Sewer rates - For customers using City water.
"(a) Charges for sewer service furnished by the City to residential,
commercial and industrial customers shall be based upon customer class and
meter size, incorporating a base monthly cost for the first increment of usage
and a cost for each additional one hundred (100) cubic feet or portion of one
hundred (100) cubic feet above the first increment, as follows:
METER SIZE
(Inches)
3/4 or less
1 and Larger
METER SIZE
(Inches)
3/4 or less
1 through 2
Larger than 2
"RESIDENTIAL CLASS
BASE COST FOR FIRST
INCREMENT
In Cubic Feet)
$13.99 for first 200
$ 69.10 for first 1000
SERVICE IN
EXCESS OF BASE
(For Each Additional 100 Cubic Feet)
$ 6.91
$ 6.91
"COMMERCIAL/INDUSTRIAL CLASS
BASE COST FOR FIRST
INCREMENT
(In Cubic Feet)
$18.62 for first 200
$ 71.70 for first 1000
$143.40 for first 2,000
Page 2 of 4
SERVICE IN
EXCESS OF BASE
(For Each Additional 100 Cubic Feet)
$ 7.17
$ 7.17
$ 7.17
"(b) Monthly residential customers' wastewater volume for purposes of
assessing the sewer charge shall be based upon one hundred percent (100%)
of the actual metered potable water consumption averaged for the preceding
November, January, and February consumption, which shall be known as the
"flat winter average." Customers that do not have recorded water usage for
each of the winter average months will have their winter average calculated
based on the residential class average of 534 cubic feet.
"Monthly commercial and industrial customers' wastewater volume shall
be based upon one hundred (100) percent of the actual metered potable
water consumption, except those customers whose wastewater is metered,
and their volume shall be based upon one hundred (100) percent of the
metered wastewater. The former shall be billed for one hundred (100)
percent of the metered potable water and the latter shall be billed for one
hundred (100) percent of the metered wastewater.
"(c) Users desiring to discharge sewage into the City's sewerage system, the
strength of which sewage exceeds two hundred fifty (250) parts per million
biochemical oxygen demand (BOD), two hundred fifty (250) parts per million
of total suspended solids, (TSS), or thirty (30) parts per million of ammonia
(NH3), and which is acceptable under article III of this chapter, may do so
upon written permission of the city and by paying a monthly treatment
charge in the amount of ninety-seven cents ($0.97) per pound of biochemical
oxygen demand (BOD) in excess of the allowable biochemical oxygen
demand (BOD); fifty cents ($0.50) per pound of total suspended solids (TSS)
in excess of the allowable total suspended solids (TSS); and thirty-four cents
($0.34) per pound of ammonia (NH3 ) in excess of the allowable ammonia
strength. The city shall make the necessary tests of the user's sewage
strength to determine this charge. The charge prescribed by this subsection
shall be in addition to the charges prescribed in subsection (a) hereof."
Section 4. That water and sewer rates established in Sections 2 and 3 above shall
be effective beginning with July 1, 2020 consumption.
Section S. All provisions of the ordinances of the City of Paris, Texas in conflict with
the provisions of this ordinance are hereby repealed, and all other provisions of the
ordinances of the City of Paris not in conflict with the provisions of this ordinance shall
remain in full force and effect.
Section 6. The repeal of any ordinance or part of ordinances affected by the
enactment of this ordinance shall not be construed as abandoning any action now pending
under or by virtue of such ordinance or as discontinuing, abating, modifying, or altering any
penalty accruing or to accrue, or as affecting any rights of the municipality under any
section or provisions of any ordinance at the time of passage of this ordinance.
Page 3 of 4
Section 7. It is the intention of the City Council of the City of Paris that this
ordinance, and every provision hereof, shall be considered severable, and the invalidity or
partial invalidity of any section, clause, or provisions of this ordinance shall not affect the
validity of any other portion of this ordinance.
Section 8. Any person violating any of the provisions of this ordinance shall be
guilty of a Misdemeanor and, upon conviction, shall be fined in accordance with Section 1-6
of the Code of Ordinances and each and every day's continuance of any violation of the
above -enumerated section(s) shall constitute and be deemed a separate offense.
Section 9. Introduced and read on June 22, 2020, at a regular meeting of the City
Council of the City of Paris
Section 10. That this ordinance shall become effective from and after its passage
and publication as required by law.
PASSED AND ADOPTED this 22nd day of June, 2020.
ATTEST:
Janice Ellis, City Clerk
APPROVED AS TO FORM:
Stephanie H. Harris, City Attorney
Steven J. Clifford, M.D., Mayor
Page 4 of 4
ORDINANCE NO. 2020 -Scenario 2
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS,
AMENDING SECTIONS 34-22(b), "WATER RATES," AND SECTION 34-
23(a), (b) AND (c), "SEWER RATES—FOR CUSTOMERS USING CITY
WATER," OF CHAPTER 34 OF THE CODE OF ORDINANCES OF THE CITY
OF PARIS, TEXAS TO REFLECT CHANGES RECOMMENDED BY THE 2020
WATER AND SEWER RATE STUDY; PROVIDING A REPEALER CLAUSE, A
SEVERABILITY CLAUSE, A SAVINGS CLAUSE, A PENALTY CLAUSE; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, on the 8th day of June, 2020, the City Council of the City of Paris, Texas,
was presented a water and sewer rate study prepared by NewGen Strategies and Solutions
LLC, with certain findings and recommendations for proposed water and sewer rate
increases (a copy of which is on file with City Finance Department); and,
WHEREAS, on June 22nd, 2020, the City Council has determined that it is in the best
interest of the City of Paris and its citizens to implement the proposed rates for water and
sewer services recommended by the 2020 Water and Sewer Study by amending portions of
Article II, "Service Charges," Chapter 34, "Water, Sewer, and Sewage Disposal," of the City of
Paris Code of Ordinances;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
PARIS, TEXAS:
Section 1. That the findings set out in the preamble to this ordinance are hereby in
all things approved.
Section 2. That Subsection (b) of Section 34-22 of the Code of Ordinances of the
City of Paris, Texas, be, and the same is hereby amended to read in its entirety as follows:
"Sec. 34-22. Water rates.
"(b) Charges for water furnished by the City, measured in cubic feet, are
established as follows based upon customer class and meter size and
incorporate a base monthly cost which includes the cost for the first
increment of water, and a cost per one hundred (100) cubic feet or portion of
one hundred (100) cubic feet used above the first increment:
"RESIDENTIAL CLASS
BASE COST FOR FIRST SERVICE IN
METER SIZE INCREMENT EXCESS OF BASE
(Inches) (In Cubic Feet) (For Each
Additional 100 Cubic Feet)
Page 1 of 4
3/4 or less $11.97 for first 200
1 and Larger $ 58.37 for first 1,000
"COMMERCIAL/INDUSTRIAL CLASS
BASE COST FOR FIRST
METER SIZE INCREMENT
(Inches) (In Cubic Feet)
100 Cubic Feet)
3/4 or less
$14.32 for first 200
1 through 2
$ 57.25 for first 1,000
3
$ 205.52 for first 3,000
4
$ 3,530.00 for first 100,000
6
$ 5,295.00 for first 150,000
8 and larger
$ 7,060.00 for first 200,000
$ 4.40
$ 4.40
SERVICE IN
EXCESS OF BASE
(For Each Additional
$ 4.31
$ 3.53
$ 3.53
$ 3.53
$ 3.53
$ 3.53
Section 3. That Subsections (a), (b) and (c) of Section 34-23 of the Code of
Ordinances of the City of Paris, Texas, be, and the same are hereby amended to read in their
entirety as follows:
"Sec. 34-23. Sewer rates - For customers using City water.
"(a) Charges for sewer service furnished by the City to residential,
commercial and industrial customers shall be based upon customer class and
meter size, incorporating a base monthly cost for the first increment of usage
and a cost for each additional one hundred (100) cubic feet or portion of one
hundred (100) cubic feet above the first increment, as follows:
'RESIDENTIAL CLASS
BASE COST FOR FIRST SERVICE IN
METER SIZE INCREMENT EXCESS OF BASE
(Inches) In Cubic Feet) (For Each Additional 100
Cubic Feet)
3/4 or less $13.82 for first 200 $ 6.82
1 and Larger $ 68.24 for first 1000 $ 6.82
"COMMERCIAL/INDUSTRIAL CLASS
BASE COST FOR FIRST SERVICE IN
METER SIZE INCREMENT EXCESS OF BASE
(Inches) (In Cubic Feet) (For Each Additional
Page 2 of 4
100 Cubic Feet)
3/4 or less
$18.40 for first 200
$ 7.08
1 through 2
$ 70.82 for first 1000
$ 7.08
Larger than 2
$141.65 for first 2,000
$ 7.08
"(b) Monthly residential customers' wastewater volume for purposes of
assessing the sewer charge shall be based upon one hundred percent (100%)
of the actual metered potable water consumption averaged for the preceding
November, January, and February consumption, which shall be known as the
"flat winter average." Customers that do not have recorded water usage for
each of the winter average months will have their winter average calculated
based on the residential class average of 534 cubic feet.
"Monthly commercial and industrial customers' wastewater volume shall
be based upon one hundred (100) percent of the actual metered potable
water consumption, except those customers whose wastewater is metered,
and their volume shall be based upon one hundred (100) percent of the
metered wastewater. The former shall be billed for one hundred (100)
percent of the metered potable water and the latter shall be billed for one
hundred (100) percent of the metered wastewater.
"(c) Users desiring to discharge sewage into the City's sewerage system, the
strength of which sewage exceeds two hundred fifty (250) parts per million
biochemical oxygen demand (BOD), two hundred fifty (250) parts per million
of total suspended solids, (TSS), or thirty (30) parts per million of ammonia
(NH3), and which is acceptable under article III of this chapter, may do so
upon written permission of the city and by paying a monthly treatment
charge in the amount of,ninety-seven cents ($0.97) per pound of biochemical
oxygen demand (BOD) in excess of the allowable biochemical oxygen
demand (BOD); fifty cents ($0.50) per pound of total suspended solids (TSS)
in excess of the allowable total suspended solids (TSS); and thirty-four cents
($0.34) per pound of ammonia (NH3 ) in excess of the allowable ammonia
strength. The city shall make the necessary tests of the user's sewage
strength to determine this charge. The charge prescribed by this subsection
shall be in addition to the charges prescribed in subsection (a) hereof."
Section 4. That water and sewer rates established in Sections 2 and 3 above shall
be effective beginning with July 1, 2020 consumption.
Section 5. All provisions of the ordinances of the City of Paris, Texas in conflict with
the provisions of this ordinance are hereby repealed, and all other provisions of the
ordinances of the City of Paris not in conflict with the provisions of this ordinance shall
remain in full force and effect.
Page 3 of 4
Section 6. The repeal of any ordinance or part of ordinances affected by the
enactment of this ordinance shall not be construed as abandoning any action now pending
under or by virtue of such ordinance or as discontinuing, abating, modifying, or altering any
penalty accruing or to accrue, or as affecting any rights of the municipality under any
section or provisions of any ordinance at the time of passage of this ordinance.
Section 7. It is the intention of the City Council of the City of Paris that this
ordinance, and every provision hereof, shall be considered severable, and the invalidity or
partial invalidity of any section, clause, or provisions of this ordinance shall not affect the
validity of any other portion of this ordinance.
Section B. Any person violating any of the provisions of this ordinance shall be
guilty of a Misdemeanor and, upon conviction, shall be fined in accordance with Section 1-6
of the Code of Ordinances and each and every day's continuance of any violation of the
above -enumerated section(s) shall constitute and be deemed a separate offense.
Section 9. Introduced and read on June 22, 2020, at a regular meeting of the City
Council of the City of Paris
Section 10. That this ordinance shall become effective from and after its passage
and publication as required by law.
PASSED AND ADOPTED this 22nd day of June, 2020.
ATTEST:
Janice Ellis, City Clerk
APPROVED AS TO FORM:
Stephanie H. Harris, City Attorney
Steven J. Clifford, M.D., Mayor