Loading...
1990-096-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 89-136, award the RESOLUTION NO. 90-096 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 89-136, award the contract for Manhole Rehabilitation Project No. 88-WSRB-05-89 to Rhode Construction Company; and, WHEREAS, the City Engineer, Earl Smith, acting as project engineer of said project recommends the amendment of said contract by Change Order No. 2 and Final attached hereto as Exhibit "A", which prOVides for a net increase in contract price of $15,367.00 for a total of $536,588.00 for adjusting as-bid quantities to as-built quantities, and such form should be approved, and the Mayor should be author ized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that Manhole Rehabilitation Project No. 88-WSRB-05-89, contract is hereby amended by Change Order No. 2 and Final attached hereto as Exhibit "A", providing for a net increase in contract price of $15,367.00 for a total of $536,588.00 for adjusting as-bid quantities to as-built quantities, which is in all things approved; and, BE IT FURTHER RESOLVED, That the Mayor of the City of Paris, Eric Clifford, be, and he is hereby authorized and directed on behalf of the City of Paris to execute said Change Order No. 2 and Final. Passed and adopted this 12th day of November, 1990. EoJii~ ATTEST: \\ ~""" Mattie Cunningham, Cit ity At torney CHANGE ORDER Order No. Two & Final Date: 10-19-90 Agreement Date: November 13. 1989 NAME OF PROJECT: Manhole Rehahi 1 i tMi on - I'roj per IIRR TJ~RR n<; RQ OWNER: City of Paris, Paris, Texas CONTRACTOR: Rhode r.()n~trtlr.ti on r.omp;::my, Tn(" The following changes are hereby made to the CONTRACT DOCUMENTS: See Attachment "AIf Justification: To adjust as-bid quantities to as-built quantities. Change to CONTRACT PRICE: Original CONTRACT PRICE $ 529.211.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ <;71 771 nn The CONTRACT PRICE due to this CHANGE ORDER will be (increased) f9~H~nr?] by: $ 15.16 7.00 The new CONTRACT PRICE including this CHANGE ORDER will be $ 536.588.00 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by calendar days. The date for completion of all work will be (Date). Approvals Required: To be effective this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT. or as may otherwise be required by the SUPPLE- MENTAL GENERAL CONDITIONS. Requested by: !~LLY GluLL~r, v~ce-~reS1QenC, Knoae ~onstruct1on Co., Inc. Recommended by: Michael J. Donnan, P.E., Hayter Engineering, Inc. Ordered by: Accepted by: lJ I A . Eric Clifford, Mayor, City of Paris, Paris, Texas Federal Agency Approval (where applicable) N/A CONTRACT DOCUMENTS fOR CONSTRUCTION OF FEDERALLY ASSISTED WATER AND SewER PROJECTS EXHIBIT A Document No. 10 Change Order: Page 1 of 1 ATTACHMENT "A" Change Order #2 & Final Paris Manhole Rehabilitation #88-WSRB-05-89 1. Inflow insert installed & complete. Deduct 3 EA @ $65.00jEA 2A. Reset existing ring & cover out- side pavement installed & complete wjchimney seal. Deduct 5 EA @ $375.00jEA 2B. Reset existing ring & cover inside pavement, installed & complete wj concrete pad. Deduct 5 EA @ $511.00jEA 2C. New ring & cover, standard or water- tight, outside pavement, installed & complete wjchimney seal. Deduct 26 EA @ $595.00jEA 2D. New ring & cover, standard or water- tight, inside pavement, installed & complete wjconcrete pad. Deduct 1 EA @ $654.00jEA 2E. Raise existing ring & cover 0" to 6", installed & complete. Deduct 4 EA @ $225.00jEA 2F. Raise existing ring & cover 7" to 12", installed & complete. Add 1 EA @ $230.00jEA 2G. Reset ring & cover outside pavement with gunite. Add 3 EA @ $295.00jEA 2H. New ring and cover, st'd or outside pavement wjgunite. @ $515.00jEA watertight, Add 22 EA 3. Seal existing MH joint between wall & invert, complete. Deduct 10 EA @ $500.00jEA 4. Seal existing MH joint between wall & invert, complete. Add 2 EA @ $140.00jEA ADD 230.00 885.00 11,330.00 280.00 DEDUCT 195.00 1,875.00 2,555.00 15,470.00 654.00 900.00 5,000.00 5. Seal walls of existing MH's wjshot- crete liner. Add 25.25 VF @ $100.00jVF 6. Seal isolated defects in existing MH walls, complete. Add 4 EA @ $430.00jEA 7B. st'd 6' replacement MH wjwatertight ring & cover, installed & complete. Add 2 EA @ $3,300.00jEA 7C. Additional replacement MR depth, installed & complete. Deduct 10 EA @ $95.00jEA 7D. Drop structure for replacement MH, installed & complete. Deduct 2 EA @ $370.00jEA 8. Rebuild existing MR invert & benches, complete. Deduct 2 EA @ $650.00jEA 10. Trench safety protection. Deduct 1,032 LF @ $2.00jLF 11. Point repair outside MR, 4', in pavement. Add 13 EA @ $l,OOO.OOjEA 12. Point repair outside MR, 4', outside pavement. Add 14 EA @ $750.00jEA Net Project Recap: orig. Contract Price Change Order No. 1 Change Order NO. 2 - $529,211.00 (7,990.00) 15.367.00 $536,588.00 2,525.00 1,720.00 6,600.00 13,000.00 10,500.00 950.00 740.00 1,300.00 2,064.00 $47,070.00 $31,703.00 $15,367.00