Loading...
09 - Code ReportsItem No. 9 Code Enforcement Report: September, 2020 Cases Worked: 359 Cases Completed: 341 Initial Inspections: 351 Re -inspections: 591 Total Inspections: 942 Lots Abated: 186 Other Work by Abatement Crew: Tree & Brush Removal — 4 days Removed Tires — 3 days Removed Illegal Dumps — 6 days Repaired/Serviced Equipment — 2 days Buildinj_And Standards Report: September 2020 There was no BSC Meeting in September.. 1 Structure was demolished: 2004 Cleveland