12 - Bid from Bernal Commercial Construction for Johnson Woods Creek wall - agreement with Gary and Rebecca NashItem No. 12 TO: Mayor & City Council FROM: Grayson Path, City Manager SUBJECT: NASH Wall DATE: November 9, 2020 �G X-11610L"I On July 27, 2020, the City Council approved an agreement with Gary and Rebecca Nash to partner together in funding the installation of new gabion-style retaining walls in the drainage way behind their property. The City had performed a sanitary sewer and erosion protection project in this area, but at the time it was agreed that the Nash's sackrete wall would remain in place. The sackrete wall subsequently failed. The Nash's and City came to an agreement to partner together to fund the replacement of this wall. Bids were received and opened on October 1, 2020. STATUS OF ISSUE: A total of five (5) bids were received ranging from $56,985.00 to $88,500.00. The lowest bid came from Bernal Commercial Construction for $56,985.00. Hayter Engineering has recommended that the City Council award the bid to Bernal Commercial Construction and for City Staff and Hayter Engineering to begin constructing the contractual documents. BUDGET: Per an agreement with Gary and Rebecca Nash, as well as a proposed amendment on your agenda tonight, the City has agreed to spend no more than $25,000.00 on this project, to be amended to $33,000.00 if the City Council approves of the amendment. Expenses would be for both Bernal Commercial Construction as well as Hayter Engineering. The remaining amount will be covered by Gary and Rebecca Nash. The total estimated cost for the project is $68,260.00. Side note, at the time of negotiation with Hayter Engineering for their services, the City had an on -staff City Engineer who was going to perform some services not listed in the Hayter Engineering contract in order to save expense. With Hayter Engineering identified to serve as the Interim City Engineer (also on your agenda tonight), they will in fact serve in their contractual role for this project as well as the City Engineer when necessary. The City Manager has agreed with Mr. Nash that any City Engineer -related duties that were outside of the scope of Hayter Engineering's contract will be covered and paid for by the City as they would have been our expense with an in-house City Engineer, and therefore not charged under the Nash/City Agreement. This would be above and beyond our Nash/City Agreement amount. OPTIONS: 1. Accept and award the lowest bid of $56,985.00 to Bernal Commercial Construction. 2. Reject the bid and advise City Staff. 3. Request additional information. RECOMMENDATION: 1. Accept and award the lowest bid of $56,985.00 to Bernal Commercial Construction. HAYTER E N G I N E E R I N G November 4, 2020 Mr. Grayson Path, City Manager City of Paris 135 SE 1" Street Paris, TX 75460 RE: 645 Johnson woods Drive Channel Bank Stabilization HEI #180078 Dear Mr. Path: Regarding the above referenced project, bids were received on October 1, 2020. Five bids were received. All bids were opened and found to be responsive. Attached is the Bid Tabulation. The low bidder is Bernal Commercial Construction Co. in the base bid amount of $56,985.00. We have verified the completeness of the bid and have verified that the bonding company is licensed in Texas. The bid appears to conform to the contract document requirements. Based on a review of the Statement of Bidder's Qualifications, we believe them to be responsive and responsible. We therefore recommend award of this project to Bernal Commercial Construction Co. in the base bid amount of $56,985.00. If the City concurs with this recommendation, please sign the attached three original Notice of Award forms. Upon signing, please return all three originals to this office for initiating the contract execution process. Sincerely, HAYTER ENGINEERING, INC.®is OF . T ............ a HRISTOPHER M. D .. Christopher M. Donn i an, P.E. °4-�': 9072x3 Project Manager Enclosure Practical Infrastructure 4445 SE Loop 286 I Paris, T X 75460 i haytereng.co 31i1 i.. G k Isra�., `.0 r 1[ Project: 645 JOHNSON WOODS DRIVE CHANNEL BANK STABILIZATION Owner: City of Paris Bidder: Bernal Commercial Construction Co. Bidder's Address: 3232 La Sombra St., Grand Prairie, TX 75050 You are notified that your Bid dated October 1, 2020 for the above Contract has been considered. You are the Successful Bidder and are awarded a Contract for West ShermanStreet_ Sewer „Re„pl„acement. The Contract Price of your Contract is Fifty -Six Thousand Nine Hundred Eight Five Dollars ($56,985.00). 3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award. You must comply with the following conditions precedent within [15] days of the date you receive this Notice of Award. 1. Deliver to the Owner three [3I fully executed counterparts of the Contract Documents. 2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary Conditions (Paragraph SC -13.07). Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Contract Documents. City of Paris, Texas Page 1 of 1 Notice of Award 11/412020