09 - Demolition & Code Enforcement Activity ReportsItem No. 9
Code Enforcement Report:October & November 2020
Cases Worked: 462
Cases Completed: 778
Initial Inspections: 390
Re -inspections: 726
Total Inspections: 896
Lots Abated: 156
Other Work by Abatement Crew:
Tree & Brush Removal —10 days
Removed Tires — 6 days
Removed Illegal Dumps -10 days
Repaired/Serviced Equipment — 4 days
8 structures were presented to the Building and Standards Commission in November:
503 & 519 Tudor 720 NE 2nd
636 NE 2nd 1311 Hickory
Building and Standards Report: October & Novembers 2020
18 structures were presented to the Building and Standards Commission in October:
520 Deshong
1231 Martin Luther King Jr.
1021 NE 8th
265 NE 22nd
643 Cedar
-1257 E Sherman
1239 E Sherman
337 E Washington
343 Brown
346 NW 3rd
646 NW 5th
534 NW 5th
1321 NW 18th
1716 W Campbell
1365 Graham
1334 W Booth
2605 W Houston
260 S Main
8 structures were presented to the Building and Standards Commission in November:
503 & 519 Tudor 720 NE 2nd
636 NE 2nd 1311 Hickory
828 NE 12" 654 E Washington
645 E Polk 750 Tudor
2 structures were demolished in October & November:
1239 E Sherman
1257 E Sherman