Loading...
1989-024-RES WHEREAS, CITY MANAGER RECEIVED REQUEST FROM RALPH TAYLOR RESOLUTION NO. 89-024 WHEREAS, the City Manager of the City of Paris has heretofore received a request from Ralph Taylor, Pastor of the Bethel Temple Church, for a pro rata water main extension to serve property located in Lot 17, City Block 188E which fronts on the north side of S.E. Loop 286; and, WHEREAS, it is deemed appropriate to permit Bethel Temple Church to act as sponsor under the terms of Section IX of the Subdivision Ordinance No. 1315 of the City of Paris with any refunds due under said ordinance being paid to Bethel Temple Church or their successors or assigns; and, WHEREAS, upon receipt of the above described request, preliminary plans, specifications and estimate of the total cost of the proj ect were prepared by Chaney Engineering and approved by Earl Smith, City Engineer and delivered to the City Manager and considered at the regular Council Meeting on the 13th day of February, 1989, and a public hearing concerning the same was set for March 13, 1989, at which time such public hearing was held; and, WHEREAS, after hearing the matters present~d at public hearing, the City Council is of the op~nion Bethel Temple Church is entitled to have a pro rata water extension and to act as sponsor for said project; and, the that main WHEREAS, such project should be known as the Pro Rata Water Line Extension Bethel Temple, S.E. Loop 286 Project which has a total estimated cost of $59,330.80; the front foot method would be equitable and is the method described on Exhibit A attached hereto; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, That the pro rata water main extension beginning approximately 790 feet west of the west boundary line of 6th Street S.E. intersection with the north boundary line of SE Loop 286 and runs easterly along the north right of way line of Loop 286 S. E. approximately 3,268 feet, be, and the same is hereby approved and shall be known as "Pro Rata Water Line Extension Bethel Temple, S.E. Loop 286"; and, BE IT FURTHER RESOLVED, That Bethel Temple Church act as sponsor of said pro rata water main extension and pay the total construction cost, less the oversizing cost which will be paid by the City of Paris; and, BE IT FURTHER RESOLVED, That the front foot rule is the method described in Exhibit A attached hereto, less the cost of oversizing, is found to be equitable and is adopted as the method to be used for refunding the cost of the water and sewer main extension to sponsor, Bethel Temple Church, its successors or assigns; and, BE IT FURTHER RESOLVED. That the c;~v M~n~gpr_ Mi~h~p1 Passed and adopted this 13th day of March, 1989. ATTEST: ~~ 7,/ Eric .. ~ ~, Joe ~~ant CityC1erk FORM: -2 Mayor ---.. PRO RATA WATER LI~E EXTENSION BETHEL TEMPLE, S.E. LOOP 286 Based on the front foot rule, the estimated costs for the project are as follows: THOMAS (850') $11,071.89 ) ) $40,094.64 max. returnab le to EDZARDS (2,228' ) $29,022.75 ) church if they put up only $42,567.83 of the total proj. BETHEL (190' ) $ 2,473.19 cost ($59,330.80) TEMPLE 6" Line $42,567.83 8" Line $59,33-0.80 Upsizing Cost $16,762.97 EXHIBIT A