Loading...
09 - Demolition & Code ReportsItem No. 9 Code Enforcement Report: Janygry, 2021 Cases Worked: 281 Cases Completed: 117 Initial Inspections: 258 Re -inspections: 101 Total Inspections: 359 Lots Abated: 10 Other Work by Abatement Crew: Tree & Brush Removal — 6 days Removed Tires — 3 days Removed Illegal Dumps — 7 days Repaired/Serviced Equipment — 4 days Building and Standards Rg ort: Januar 2021 There were 8 structures presented to the Building and Standards Commission: 520 Deshong 1219 E Hearon 1144 SW 5th 531 Brown 601 SE 6th 102 SW 7th 3310 E Houston 1535 W Walker 2 structures was removed in December: 1011 Church 921 E Houston