1988-110-RES WHEREAS, the City Council of the City of Paris acting under emergency powers granted by the City
RESOLUTION NO. RR_lln
WHEREAS, the City Council of the City of Paris acting
under emergency powers granted by the City Council on
October 10, 1988, in Resolution No. 88-105, solicited
proposals for the reconstruction, replacement or repair of a
20 inch water main between Clement Road and Santa Fe Street
near the alignment of 3rd Street N.E.; and,
WHEREAS, a proposal was made by B. Bray Construction
Co., Inc. for a total price of $139,444.50, and Earl Smith,
City Engineer of the City of Paris, recommends the accep-
tance of said proposal; and,
WHEREAS, the form of contract for such construction
project is attached hereto as Exhibit A, and such form
should be approved, and the Mayor should be authorized to
sign the same; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PARIS, that the Bid of B. Bray Construction Co., Inc., for
the reconstruction, replacement or repair of a 20 inch water
main between Clement Road and Santa Fe Street near the
alignment of 3rd Street N.E. in the amount of $139,444.50 is
hereby accepted and let conditioned upon said contractor
meeting all of the terms and specifications included in the
bid documents; and,
BE IT FURTHER RESOLVED, That the Mayor of the City of
Paris, Eric S. Clifford, be, and he is hereby authorized and
directed to execute on behalf of the City of Paris the
contract with B. Bray Construction Co., Inc. for the
replacement or repair of a 20 inch water main between
Clement Road and Santa Fe Street near the alignment of 3rd
Street N.E., upon the terms and conditions and in the form
shown in Exhibit A attached hereto.
Pm"d .nd .dop'"d chi. '''~ NOV"mb~ _ _
Erin ~Yor
ATTEST:
~~,,~~
Mattie Cunning am, City er
APPROVED AS JP FORM:
/.~./
AGREEMENT
THI S AGREEMENT is dated as of the day of in
the year 19____ by and between City of Paris, Paris, Texas, (hereinaf-
ter called OWNER) and B. Bray Construction Co.. Inc.
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants herein-
after set forth, agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the
Contract Documents. The Work is generally described as follows:
Furnish and install approximately 3,200 L.F. of 20" diameter, DR25 PVC
water main and appurtenances, complete, tested and cleaned-up.
The Project for which the Work under the Contract Documents may be the
whole or only a part is generally described as follows:
20" Water Main Replacement 3rd N.E. from Clement Road to Santa Fe as
shown on the drawings.
Article 2. ENGINEER.
The Project has been designed by CITY ENGINEER, City of Paris, Paris,
Texas, or his authorized representative, who is hereinafter call
ENGINEER and who is to act as OWNER's representative, assume all
duties and responsibilities and have the rights and authority assigned
to ENGINEER in the Contract Documents in connection with completion of
the Work in accordance with the Contract Documents.
Article 3. CONTRACT TIME.
3.1 The Work will be substantially completed within 60 days from the
date when the Contract Time commences to run as provided in paragraph
2.3 of the General Conditions, and completed and ready for final
payment in accordance with paragraph 14.1l of.the.General Conditions
within 120 days from the date when the Contract Time commences to run.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is
of the essence of this Agreement and that OWNER will suffer financial
loss if the Work is not completed within the times specified in
paragraph 3.1 above, plus any extensions thereof allowed in accordance
with Article 12 of the General Conditions. They also recognize the
delays, expense and difficulties involved in proving in a legal or
arbitration proceeding the actual loss suffered by OWNER if the Work
is not completed on time. Accordingly, instead of requiring any such
proof, OWNER and CONTRACTOR agree that as liquidated damages for delay
(but not as a penalty) CONTRACTOR shall pay OWNER one hundred fifty
dollars ($150.00) for each day that expires after the time specified
EXHIBiT A
in paragraph 3.1 for Substantial Completion until the Work is substan-
tially complete. After Substantial Completion, if CONTRACTOR shall
neglect, refuse or fail to complete the remaining work within the
Contract Time or any proper extension thereof granted by OWNER,
CONTRACTOR shall pay OWNER fifty dollars ($50.00) for each day that
expires after the time specified in paragraph 3.1 for completion and
readiness for final payment.
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will
be processed by ENGINEER as provided in the General Conditions.
5.1 Progress Payments. OWNER shall make progress payments on
account of the Contract Price on the basis of CONTRACTOR's
Applications for Payment as recommended by ENGINEER, on or about
the first day of each month during construction as provided
below. All progress payments will be on the basis of the
progress of the Work measured by the schedule of values
established in paragraph 2.9 of the General Conditions (and in
the case of Unit Price Work based on the number of units complet-
ed) or, in the event there is no schedule of values, as provided
in the General Requirements.
5.1.1. Prior to Substantial Completion, progress payments
will be made in an amount equal to the percentage indicated
below, but, in each case, less the aggregate of payments
previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with para-
graph 14.7 of the General Conditions.
Ten percent (10%) of Work completed.
Ten percent (10%) of materials and equipment not
incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to
OWNER as provided in paragraph 14.2 of the General
Conditions).
5.1.2. Upon Substantial Completion, in an amount sufficient
to increase total payments to CONTRACTOR to ninety-five
percent (95%) of the Contract Price, less such amounts as
ENGINEER shall determine, or OWNER may withhold, in accor-
dance with paragraph 14.7 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the
Work in accordance with paragraph 14.13 of the General Condi-
tions, OWNER shall pay the remainder of the Contract Price as
recommended by ENGINEER as provided in said paragraph 14.13.
2
Article 6. INTEREST.
No interest will be paid to the CONTRACTOR on retained money unless
required by law.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into.this Agreement, CONTRACTOR
makes the following representations:
7.1 CONTRACTOR has familiarized itself with the nature and
extent of the Contract Documents, Work, site, locality, and all
local conditions and Laws and Regulations that in any manner may
affect cost, progress, performance or furnishing of the Work.
'1.2 CONTRACTOR has studied carefully all reports of explorations
and tests of subsurface conditions and drawings of physical
conditions which are.identified in the Supplementary Conditions
as provided in paragraph 4.2 of the General Conditions, and
accepts the determination set forth in paragraph SC-4.2 of the
Supplementary Conditions of the extent of the technical data
contained in such reports and drawings upon which CONTRACTOR is
entitled to reply.
7.3 CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such
examinations, investigations, explorations, tests, reports and
studies (in addition to or to supplement those referred to in
paragraph 7.2 above) which pertain to the subsurface or physical
conditions at or contiguous to the site or otherwise may affect
the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing
of the Work at the Contract Price, within the Contract Time and
in accordance with the other terms and conditions of the Contract
Documents, including specifically the provisions of paragraph 4.2
of the General Conditions; and no additional examinations,
investigations, explorations,. tests..r.eports, .studies or similar
information or data are or will be required by CONTRACTOR for
such purposes.
7.4 CONTRACTOR has reviewed and checked all information and data
shown or indicated on the Contract Documents with respect to
existing Underground Facilities at or contiguous to the site and
assumes responsibility for the accurate location of said Under-
ground Facilities. No additional examinations, investigations,
explorations, tests, reports, studies or similar information or
data in respect of said Underground Facilities are or will be
required by CONTRACTOR in order to perform and furnish the Work
at the Contract Price, within the Contract Time and in accordance
with the other terms and conditions of the Contract Documents,
including specifically the provisions of paragraph 4.3 of the
General Conditions.
3
7.5 CONTRACTOR has correlated the results of all such observa-
tions, examinations, investigations, explorations, tests, reports
and studies with the terms and conditions of the Contract Docu-
ments.
7.6 CONTRACTOR has given ENGINEER written notice of all con-
flicts, errors or discrepancies that he has discovered in the
Contract Documents and the written resolution thereof by ENGINEER
is acceptable to CONTRACTOR.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between
OWNER and CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement (pages 1 to 6, inclusive).
8.2 Exhibits to this Agreement (pages to
inclusive.)
8.3 Performance and other Bonds, identified as exhibits
and consisting of pages.
8.4 Notice of Award.
8.5 General Conditions (pages
3. to 33 , inclusive).
8.6 Supplementary Conditions (pages
inclusive).
1
to 18
8.7 Specifications bearing the title 20" Water Main Replacement. 3rd NE
Clement to Santa Fe and consisting of divisions and
pages, as listed in table of contents thereof.
8.8 Drawings, consisting of a cover sheet and sheets numbered
1 through 8 ,inclusive with each sheet bearing the
following general title: 88-WSRB-04-88
8.9 Addenda numbers
to
inclusive.
8.10 CONTRACTOR's Bid (pages
exhibit
to
Ii ,inclusive) marked
8.11 Documentation submitted by CONTRACTOR prior to Notice of
Award (pages to , inclusive). NONE
8.12 The following which may be delivered or issued after the
Effective Date of the Agreement and are not attached hereto:
All Written Amendments and other documents amending, modify-
ing, or supplementing the Contract Documents pursuant to
paragraphs 3.4 and 3.5 of the General Conditions. NONE
4
8.13 The documents listed in paragraphs 8.2 et seq. above are
attached to this Agreement (except as expressly noted
otherwise above).
There are no Contract Documents other than those listed above in this
Article 8. The Contract Documents may only be amended, modified or
supplemented as provided in paragraphs 3.4 and 3.5 of the General
Conditions.
Article 9. MISCELLANEOUS
9.1 Terms used in this Agreement which are defined in Article 1
of the General Conditions will have the meanings indicated in the
General Conditions.
9.2 No assignment by a party hereto of any rights under or
interests in the Contract Documents will be binding on another
party hereto without the written consent of the party sought to
be bound; and specifically but without limitation moneys that may
become due and moneys that are due may not be assigned without
such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically
stated to the contrary in any written consent to an assignment no
assignment will release or discharge the assignor from any duty
or responsibility under the Contract Oocuments.
9.3 OWNER and CONTRACTOR each binds itself, its partners,
successor, assigns and legal representatives to the other party
hereto, its partners, successors. assigns and legal representa-
tives in respect of all covenants, agreements and obligations
contained in the Contract Documents.
Article 10. OTHER PROVISIONS.
5
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
triplicate. One counterpart each has been delivered to OWNER, CON-
TRACTOR and ENGINEER. All portions of the Contract Documents have
been signed or identified by Owner and CONTRACTOR or by ENGINEER on
their behalf.
This Agreement will be effective on 19
OWNER CONTRACTOR
~ ~
(CORPORATE SEAL) (CORPORATE SEAL)
Attest Attest
Address for giving notices Address for giving notices
City of Paris B. Bray Construction Co.. Inc.
P. O. Box 9037, Paris, Texas 2146 S. Church Street, Paris, Texas
License No.