Loading...
09 - Code Enforcement ReportItem No. 9 Code Enforcement Re ort: Februar 2021 Cases Worked: 123 Cases Completed: 167 Initial Inspections: 123 Re -inspections: 180 Total Inspections: 272 Lots Abated: 10 Other Work by Abatement Crew: Tree & Brush Removal —1 days Removed Tires — 5 days Removed Illegal Dumps — 3 days Repaired/Serviced Equipment -5 days Removed Snow/Ice — 9 days Building and Standards Report: February, 2021 There were 6 structures presented to the Building and Standards Commission: 348 NE 6th 1033 NE 7th 529 Pine Bluff 441 NE 13th 233 NW 18th 1803 Graham 2 structures was removed in December: 705 E Cherry 715 E Cherry