Loading...
09 - April Code Reports (2)Item No. 9 Code Enforcement Re ort: A ril ZM Cases Worked: 388 Cases Completed: 283 Initial Inspections: 383 Re -inspections: 244 Total Inspections: 627 Lots Abated: 21 Other Work by Abatement Crew: Tree & Brush Removal — 2 days Removed Tires — 2 days Mowed Loop 286 —1 day Removed Illegal Dumps — 2 days Repaired/Serviced Equipment — 3 days Worked on Archery Lanes —15 days Building and Standards Re ort: A ril 2021 There were 8 structures presented to the Building and Standards Commission: 1113 SE 12th 473 NE 511 405 SE 3rd 401 E Sherman 1523 Neathery 1904 E Cherry 1505 NE 20th 207 E Center 1 structure was demolished in April: 1523 Neathery (Collapsed Carport was Demolished by Owner)