09 - April Code Reports (2)Item No. 9
Code Enforcement Re ort: A ril ZM
Cases Worked: 388
Cases Completed: 283
Initial Inspections: 383
Re -inspections: 244
Total Inspections: 627
Lots Abated: 21
Other Work by Abatement Crew:
Tree & Brush Removal — 2 days
Removed Tires — 2 days
Mowed Loop 286 —1 day
Removed Illegal Dumps — 2 days
Repaired/Serviced Equipment — 3 days
Worked on Archery Lanes —15 days
Building and Standards Re ort: A ril 2021
There were 8 structures presented to the Building and Standards Commission:
1113 SE 12th
473 NE 511
405 SE 3rd
401 E Sherman
1523 Neathery
1904 E Cherry
1505 NE 20th
207 E Center
1 structure was demolished in April:
1523 Neathery (Collapsed Carport was Demolished by Owner)