09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II WorkItem No. 9
TO: Mayor, Mayor Pro Tem & City Council
FROM: Grayson Path, City Manager
SUBJECT: LOVE CIVIC CENTER PROJECT
WRA ARCHITECTS — PHASE I CONCLUSIONS
PROPOSED AMENDMENT TO CONTRACT FOR PHASE II WORK
DATE: July 12, 2021
BACKGROUND:
At the February 8, 2021 City Council meeting, the City Council awarded a Professional Services
Contract to WRA Architects, Inc. to perform Phase I services for the Love Civic Center
Restoration Project. This project consisted of analyzing the original WRA Assessment from 2017,
speaking with City and Chamber of Commerce Staff, analyzing the building, and developing new
cost estimates to assist us with narrowing down our focus for future work given our finite set of
available funding from the original bond.
STATUS OF ISSUE:
Working with City and Chamber Staff, WRA has completed Phase I and produced the attached
Stakeholder Study Booklet complete with background information, statistical information,
situational assessment, but most importantly a series of cost estimates for each of the known
projects that we wish to pursue with restoring the Love Civic Center. There is more work than we
can afford, particularly with HVAC, but using their analysis, we have been able to narrow the
focus down to the following priorities (in no particular order): restroom renovations, roof repairs,
lighting upgrades, flooring finish upgrades, ceiling tile replacement, security upgrades, fire alarm
upgrades, door and window upgrades, ADA accessibility upgrades and painting. Specific work
will still need to be identified within each of these categories, but using the cost estimates provided
by WRA Architects, we wish to engage them now with designing and bidding phases.
To accomplish this, an Amendment to the Professional Services Contract has been prepared and
is ready for your approval tonight. If approved, we expect to have this project ready for contractor
bidding by Spring 2022 and final work done in Fall 2022. City Staff will perform day-to-day
oversight as the list of projects are not complex enough to warrant an Architect representative
onsite for inspection and observance. We are also looking to work with WRA Architects, Inc. to
assist us with hiring a Contractor -at -Risk. This would be a general contractor hired up front before
the work is designed who the Architect and City can consult with. When you design and construct
a building from the ground -up (brand new), it is relatively straight forward as you do not have any
existing conditions to worry about. But when it comes to a restoration, it is advantageous to work
with a contractor up front to help us walk through potential issues during design to help avoid
numerous change orders due to unforeseen issues during the project (without knowing what is
behind the walls, even the best plans could be wrong, so an experienced contractor can help us
avoid these issues). This Contractor -at -Risk would then be tasked with obtaining their own sub-
contractors pursuant to Texas Procurement Requirements for Contractor -at -Risk.
BUDGET:
For their services, WRA Architects will charge a not -to -exceed 8.5% of an estimated $1.1 million
construction project. If the project comes in less than $1.1 million, then their fee will be less. This
is a typical arrangement with an Architectural firm.
OPTIONS:
1. Approve the Amendment #1 to the Professional Services Contract with WRA Architects,
Inc. for Phase II services for the Love Civic Center and authorize the City Manager to sign.
2. Request more information to be brought back at a future City Council meeting.
3. Reject the Amendment #1 and advise City Staff as to next steps.
RECOMMENDATION:
1. Approve the Amendment #1 to the Professional Services Contract with WRA Architects,
Inc. for Phase II services for the Love Civic Center and authorize the City Manager to sign.
l
[-„
% CHAMBEROF COMMERCE
pl;�,
.., 11, P I
\IIGXAS
Municipal Facility Master Plan
Phase 1 - Stakeholder Study
b � k. A R C..H I T E C.T.V.
� R,E
43VJJ
Stakeholder Study Booklet
April 16',2021
WRA,, Vl114rchRecAs ° 'IM�117 IAehlit IIDulvp, SlIl�ke 1800, DaRa' m Texas 75251�� 14-,,',111150 w0077
[,Po,,re intentionall Y.Bankl
City of Paris, Texas
Love Civic Center
Chapter 1 - Executive Summary....................................................................
04
Chapter 2 - Site Evaluation.............................................................................
05
Chapter 3 - Project Goals, Values and methodology ..................................
06
Project Methodology
ITEM I Define Project Goals/ kick off Meeting
ITEM II Stakeholder's Document
ITEM III Preliminary Survey and Basemap Complete
ITEM IV Program and schematic design
ITEM V Project Budget (Draft)
ITEM VI Design Development
ITEM VII Construction Documentation
ITEM VIII Construction Administration
Chapter 4 - Facts and Data Analysis.............................................................
08
City Information
Project Code Research
Zoning Ordinance Research
Chapter 5 - Probable Cost (Based on Sketches)............................................13
Chapter 6 - Preliminary Sketches...................................................................
16
Chapter7 - Next Steps.....................................................................................
20
Chapter 8 - Acknowledgements.....................................................................
21
Chapter9 - References....................................................................................
21
_c M
IARC HITECT kiRE�
City of Paris, Texas
Love Civic Center
Mr. Path,
Thank you for the opportunity to collaborately partner with the city of Paris in your efforts to effectively
plan for meeting current and future municipality facility needs. In close collaboration with the city
stakeholders, WRA Architects and Caffey Architecture was tasked to evaluate the current state of the Love
Civic Center.
The current phase is the first step in the renovation process which recognizes the building's deficiencies as
well as the needs of the community. The next phase of the project will be to narrow down the scope and
select which renovations are desired in order to stay within the allowable budget.
Currently, the City of Paris, TX Love Civic Center is below building code standards and is due for an
upgrade to building systems and architectural renovations. The scope of the project was determined
based on code requirements, accessibility needs, as well as aesthetic upgrades. After meeting with city
representatives, the main areas of focus are restroom upgrades, flooring upgrades, painting, roof repairs,
and building security.
The following pages in this document give a more detailed look into our findings as well as a cost estimate
for the work.
Sincerely,
Mary O'Brien, AIA, NCARB, LEED AP BD+C
Principal, WRA Architects
H.
y CTURE
U�, P it I S4
City of Paris, Texas
Love Civic Center
The Love Civic Center is a landmark building for the City of Paris and sits on 15.25 acres with 570 parking
spaces. The building is in use throughout the year for a variety of events including gun shows, home shows,
vaccine distribution, weddings, and performing arts as an example. The original building was designed by
Denney Architects and built in 1993. The structure consists of 29,000 SF and, for it's age, is in good condition.
There are deficiencies related to the age and constant use of the building that are in need of repair.
The site surroundings are in usable condition with some exceptions including settlement cracks in sidewalks,
creating a trip hazard per ADA accessibility. The site drainage is in fair condition, given that is sheet flows into
the draignage swale at the west end of the site.
The design team understands that the existing structure is in constant use by the community and there are
patrons who visit the building as well as the neighboring veterans memorial site on a regular basis. The
community welcomes the collaboration between the two sites, however there are security concerns of access to
the entire civic center. The staff works deligently to supervise any visitors and ensure the facility remains safe.
ICC �flt III, „'.._- NITE CTUI�,E.. YI..;� ' IIT" !� �"i
Y W W
City of Paris, Texas
Love Civic Center
The project milestones outline the upcoming deadlines expectant by the team. Each
Milestone will be in a form of submission to the city. Upon approval, the project will
transition into the next milestones. Durations are prone to fluctuations based on city
approval processes.
PHASE I
ITEM I Define Project Goals/ kick off Meeting .............................. 03/01/2021
ITEM II Stake holders Document and Presentation ....................... 04/01/2021
PHASE II (Upon Approval)
ITEM III Preliminary Survey and Basemap......................................
TBD
ITEM IV Program and schematic design ..........................................
TBD
ITEM V Project Budget (Draft) .........................................................
..........................
TBD
ITEM VI Design Development.........................................................
TBD
ITEM VII Construction Documentation ..........................................
TBD
ITEM VIII Construction Administration .........................................
TBD
A. Preliminary Assessment of Owner's Development Objectives. Provide a preliminary assessment of the Owner's
Development Objectives and identify constraints and opportunities that will impact them.
B. Identify, discuss, and prioritize values and goals that will impact the Project, including institutional purposes, growth
objectives, and cultural, technological, temporal, aesthetic, symbolic, economic, environmental, safety, sustainability,
and other relevant criteria.
A. Gather available previous studies, data, reports, surveys, or other documents which have a direct bearing on the Site
Evaluation and Project Feasibility Services.
B. Available reports on existing facilities, site surveys, construction documents, and other owner documents, including
existing program material, if any.
C. Preliminary determination of space requirements, space relationships and circulation, including consideration of
special requirements, such as ambient environment, safety and security, furnishings, flexibility and site information,
where appropriate
0I�(, i�jl ""AAR ,,- CT ifE., P� i��.. 1 ��
T a
6
City of Paris, Texas
Love Civic Center
Upon Approval from the city, The Design team will initiate Phase II. The phase II
milestones are as follows. Duration and deadlines are to be determined based on
approval of Phase I submissions.
A. To include a preliminary survey of the project site locating adjacent roads, utilities, drainage patterns, and structures
B. Drone video and 3D map generation
C. Planning GIS level city map indicating all current properties and facilities
D. Space inventory of existing spaces (spreadsheet)
A. Develop agreed program and space utilization
B. Kick off meeting with consultants
C. High level specifications
D. Submission of schematic design for approval from stakeholders
A. Budget determined based on schematic design
B. Review schedule, take corrective action required
C. Submission to stakeholders for approval
A.Establish design for the project based on schematic design
B. specify materials, structural details and cased opening
C. Submission to stakeholders for approval
A. Finalized design from design development is approved
B. Complete set of architectural drawings along with specifications
C. Submission to stakeholders for approval
D. Submission of drawings to contractors for Bidding and submission to the city for permits
A. Attend and participate in all site meeting
B. Host owner, contractor and architect meetings through construction
C. Maintain and overview construction schedule and work with contractors on providing any additional information
CJI
E
7
City of Paris, Texas
Love Civic Center
STATE CONTI
Paris, To
Coordinates:
Counties:
Founded:
Incorporated:
Area:
Total
Land:
Water:
Population:
City:
Density:
33°39'45"N 95°3252"A
Lamar
1840
1916
37.07 sq mi
35.19 sq mi
1.88 sq mi
25,171
706.08 sq mi
NE'9G}tiM)RMO0.".; D CON "r E: T
�Ak , c ff,E
P R I S 8
City of Paris, Texas
Love Civic Center
Solar Analysis
n.
y
Winter
Spring
Prevamng 5-N
Prevailing s
Average Wind Speed
v Wind Speed MPH
15
13
it i% Gj
g j
S / �
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Summer Fall
Prevailing s Prevalling 5
Wind Analysis
�.RCH,TEC 1R
1l. i 4�
N
City of Paris, Texas
Love Civic Center
(1001 11 1G /Ik ) IIIA I I ,,G I:I Uk,1 I I A",' S
A degree day represents the difference between the mean daily temperature and the control temperature,
65°. Example: If the mean temperature for a given day is 85° this equals 20 cooling degree days.
.,584 Heating IlfDe ree ����ly
650
450
250
50
-150
n
b liar pr May Jun
-350
-550
-750
(1001 11 1G /Ik ) IIIA I I ,,G I:I Uk,1 I I A",' S
A degree day represents the difference between the mean daily temperature and the control temperature,
65°. Example: If the mean temperature for a given day is 85° this equals 20 cooling degree days.
City of Paris, Texas
Love Civic Center
When the dewpoint and the temperature are high it is commonly referred to as high relative humidity. High tempera-
tures tell our body to sweat, and relative high humidity inhibits evaporation of the sweat, creating human discomfort.
Rainfall hi Inches
Apr May Jun Jul Aug Sep
Oct Nov Dec
1 CA,
P f.. 'f i 11
City of Paris, Texas
Love Civic Center
City
FY
Population
Staff HE
Staff / pop
Effective Rate
Debt Rate
Van Alstyne
2020
4,928
45.5
108.3
$0.55
$0.10
Anna
2020
151010
102.5
146.4
$0.54
$0.14
Prosper
2020
25,630
216.5
118.4
$0.49
$0.15
Princeton
2020
16,547
108
153.2
$0.62
$0.28
Melissa
2019
12,000
57
210.5
$0.57
$0.17
Celina
20201
17,942
168
106.81
$0.63
$0.19
(City of Anna, TX, n.d.) (Town of Prosper, TX, n.d.) (City of Princeton, TX, n.d.) (City of Melissa,
TX, n.d.) (City of Celina, TX, n.d.) (City of Melissa, TX, n.d.)
The city has adopted the following recommended regional amendments from the North Central
Texas Council of Governments:
(1) 2015 International Residential Code—Regional Amendments.
(2) 2015 International Building Code—Regional Amendments, Option B.
(3) 2015 International Existing Building Code—Regional Amendments.
(4) 2015 International Fire Code—Regional Amendments, Option B.
(5) 2015 International Plumbing Code, 2015 edition.
(6) 2015 International Mechanical Code, 2015 edition.
(7) 2015 International Fuel Gas Code, 2015 edition.
(8) 2015 International Energy Conservation Code, 2015 edition.
(9) 2014 National Electrical Code, 2014 edition.
(10) 2010 Americans with Disabilities Act
(11) 2012 Texas Accessibility Standards
(12) 2014 ICC -500
(13) Code of Ordinances of City of Paris, Tx.
Site 1 - PLI- Public Land and Institution district
Permitted use within District - Utility and Service Buildings, Exhibit Areas and Fairgrounds
C. �N
-` '�S12
City of Paris, Texas
Love Civic Center
The probable cost provided have been escalated to current day inflation and take into account labor cost. If
options are provided, the first of the options have been included in the estimate. Please reach out to the design
team if you would like any elaboration.
* Indicates that the section is elaborated separately and is custimized as per needs at the time of this document
publication.
City of Paris, Texas
Love Civic Center
CA,
1 13, 1 S
14
City of Paris, Texas
Love Civic Center
0�,.. �u _. `GMITECT C.O.,
�
m �� p it I S 15
City of Paris, Texas
Love Civic Center
Below is a break down of the Probable cost for the HVAC systems only. Indicated are the units broken down by
their tonnage and the year of manufacture. Based on the assesment provided by WRA, units older or close to 15
years of life need to be replaced. Units that need to be replaced today are indicated in red and have been included
in the total estimate. Other units to be replaced in the near future are indicated by orange and units indicated in
green are in good condition and are exempt from replacement.
New controls for the entire building have been included in the estimate at the rate of $4.00 per SF of the building.
The total estimate indicated here has been added to the total estimate provided in the previous sheets.
1
�--_� AA CHITE CTURE9
Co
-i p < i S 16
City of Paris, Texas
Love Civic Center
The preliminary sketches are diagrammed to show the location for upgrade or renovation. The denoted call outs
refer to the line items in the probable cost sheet that indicate line item estimate for change.
Y. . — — — — — — — — — — — — --- -
H. L@LOVE CIVIC
�E CENTER
CIVIC RESTORATION
CACEM PROJECT
f�cxre crone
17 _ IDs" .i i S 17
City of Paris, Texas
Love Civic Center
KEY
PLAN
LOVE CIVIC
CENTER
two"Fl-I CIVIC RESTORATION
CIM PROJECT
�.. C,.v
J� •RONITECTURE
1111 ;�1 S 18
City of Paris, Texas
Love Civic Center
I
As% C.q
-IWARCHITECTU
fjOIm i .4F "I
IMF
WEST ELEVATION 9 U9B
KEYED NOTES '
EXTERIOR DIAGRAM
LOVE CIVIC
CENTER
CIVIC RESTORATION
CUM PROJECT
p R I S 19
City of Paris, Texas
Love Civic Center
Based on the information provided in the stakeholders document, the design team is looking for
direction of change and edits to the proposal.
Upon approval of information submitted to the city in the stakeholders document and phase II proposal,
the design team will progress through the design milestones outlines in Chapter 3 phase II
Jil",
1
V
01INyr I� P R 1 S 20
City of Paris, Texas
Love Civic Center
This project is greatly enhanced by the active participation of city staff at all levels who were all
generous in sharing of their time and knowledge.
City Staff
Grayson Path, City of Paris - City Manager
Paul Allen, City of Paris - Chamber President
Bryan Glass, City of Paris
Gina Crawford, City of Paris
Randy Nation, City of Paris
Consultant Team
Mary O'Brien, WRA Architects
Nandita Rajakumar, WRA Architects
Laura Caffey, Caffey Architecture
1. American Institute of Architects (AIA). (n.d.). AIA B203-2005 O -A Site Evaluation
&Planning.
2. Whole Building Design Guide - Architectural Programming. (n.d.). Retrieved from
National Institute of Buidling Sciences: https://wwwwbdg.org/design-disciplines/
architectural -programming
3. Code of Ordinances. (2019). paris.
4. City of Paris, Tx. (n.d.). Retreived from http://www.paristexas.com/the-chamber/
5. City of Anna, TX. (n.d.). Retrieved from https:/lwww.annatexas.gov/ArchiveCenter/
ViewFile/Item/ 1026
6. City of Celina, TX. (n.d.). Retrieved from https://www.celina-tx.gov/880/Approved-Budgets
7. City of Melissa, TX. (n.d.). Retrieved from https://www.cityofmelissa.com/Departments/
Finance/Financial%20Transparency/2018-19%2OBudget%2OAdopted%2OFinal%2001.30.18.
pdf
8. City of Princeton, TX. (n.d.). Retrieved from https://princetontx.gov/wp-content/
uploads/2019/ 12/PrincetonTX-FY20.pdf
41"* -
H I TE C TORE
�� C'..011 ; R i IS 21
P RISEXAS
LAMACOUNTY
CHAMBER OF COMMERCE
N
E. ............
_CT
WIZA Architects
wraard fltects.coin i
II `2 �3 IIVleilit Dilve, Sulte'1800 eXas 11 T,:i251 , 7510 0 0 77
THE STATE OF TEXAS
§ Professional Services Contract
COUNTY OF LAMAR § Amendment #1
THIS AMENDMENT to the PROFESSIONAL SERVICES CONTRACT is entered into on this
12th day of July, 2021, by and between the CITY OF PARIS, TEXAS, a municipal corporation located
in Lamar County, Texas, (hereinafter referred to as "CITY"), acting by and through its City Manager or
his designee, and WRA Architects, Inc. ("hereinafter referred to as "CONSULTANT") whose address is
12377 Merit Drive, Suite 1800, Dallas, Texas 75251.
WITNESSETH:
WHEREAS, CITY desires to obtain architectural services from CONSULTANT related to the Love
Civic Center Restoration Project; and
WHEREAS, CONSULTANT is an architectural firm qualified to provide such services and is willing
to undertake the performance of such services for CITY in exchange for fees hereinafter
specified; and
WHEREAS, CITY and CONSULTANT entered in to a Professional Services Contract on the 811 day
of February, 2021, for Phase I services for the Love Civic Center Project; and
WHEREAS, CONSULTANT has satisfactorily completed Phase I services; and
WHEREAS, CITY desires to proceed with Phase II services from CONSULTANT for the Love Civic
Center;
NOW, THEREFORE,
THAT IN CONSIDERATION of the covenants and agreements hereinafter contained and subject
to the terms and conditions hereinafter stated, the parties hereto do mutually agree as follows:
I.
Professional Services Contract
The terms and conditions as provided in the Professional Services Contract remain in full force
and effect, except as amended in this Amendment #1.
II.
Scone of Services
CONSULTANT shall perform such services related to the Love Civic Center Restoration Project
specifically including, but not necessarily limited to, the tasks enumerated more fully in Attachment "A"
hereto entitled "Scope of Work" (hereafter referred to as the "Project"). Services not set forth in
Attachment A shall be additional services and should CONSULTANT perform such additional services
as permitted in the Professional Services Contract shall entitle CONSULTANT to payment of additional
compensation. Attachment "A" is hereby incorporated herein by reference and made a part hereof as if
written word for word. However, in case of conflict in the language of Attachment "A" and the
Professional Services Contract, the terms and conditions of the Professional Services Contract shall be
final and binding upon both parties hereto.
III.
Payment for Services
Total payment for services described herein shall be a sum not to exceed eight and half percent
(8.5%) of actual construction costs estimated at $1.1 million. All other terms and conditions of Section
III of the Professional Services Contract remain in full force and effect.
IV.
Term and Time of Performance
This Amendment #1 shall begin on the date first written above, and shall terminate when CITY
has approved the Project as being final or otherwise terminates this Contract as provided herein.
The CONSULTANT shall commence services upon execution of this Amendment #1. Unless
terminated, or unless the Scope of Services and Time of Performance are changed in accordance with
Article XV of the Professional Services Contract, the CONSULTANT shall complete the Scope of
Services provided under Article II by September 30, 2022. All other terms and conditions of Section V
of the Professional Services Contract remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have set their hands by their representatives duly
authorized on the day and year first written above.
-------------------SIGNATURE PAGE FOLLOWS ----------------------
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 2 of 8
ATTEST:
Janice Ellis
City Clerk
APPROVED AS TO FORM:
STEPHANIE HARRIS
City Attorney
CITY OF PARIS
By:
GRAYSON PATH
City Manager
Date Signed:
WCArefitects, Inc.
U3
Name: Mary O'Brien, AIA
Title: Principal -in -Charge
Date Signed: 7/6/2021
[Remainder of page left blank intentionally]
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 3 of 8
THE STATE OF TEXAS
COUNTY OF LAMAR
BEFORE ME, the undersigned authority, in and for said County, Texas, on this day personally appeared
GRAYSON PATH, City Manager of the CITY OF PARIS, a Texas Municipal Corporation, known to me
to be the person who's name is subscribed to the foregoing instrument, and acknowledged to me that he
has executed the same on the City's behalf.
GIVEN UNDER MY HAND AND SEAL OF OFFICE, THIS THE
DAY OF 20
Notary Public Lamar County, Texas
My commission expires
THE STATE OF TEXAS
COUNTY OF
This instrument was acknowledged before me on the day of „m m , 20 , by
in his capacity as of _ a
Corporation, known to me to be the person whose name is subscribed to the foregoing
instrument, and acknowledged that he executed the same on behalf of and as the act of
GIVEN UNDER MY HAND AND SEAL OF OFFICE, THIS THE
DAY OF , 20
Notary Public
My commission expires
Architectural Services Contract — Amendment #1
WRA Architects, Inc.
County, Texas
Page 4 of 8
Attachment "A"
SCOPE OF SERVICES
PHA5.E.11
PROGRAMMING, DESIGN, PROCUREMENT AND CONSULTATION SERVICES
Mr% Grayson Fath, June 24, 2022,
cilv IV'anapr Proposal for ArchitecturaW Engineering Services
13�E I'street
"'anis.,, TX 754V3,
Re: Proposal for City of Paris, TX Civic Center
11: ,D ea;
WRA .41Ic1kAeqAs, fin:, is plea'seed tr"� V'Pmsent th("' foihn"dng fkn Enginee!Hng
ser "'Ices to �hfr 41,114,"oi Flaw', lt":Nas for the pr<!sject�
A/E Fee; The, Er"Phileoing !3enice lett f�,x thk jjamject vdfl be petcentage, ot
Construction! r,-,oM. basei �,nii the I�,wdgd, axId scope a:aufltned hi 0-te pgopos,-,i]
For phase 2 of the renovations to the Love Civic Center, with a construction budget
of approximately $1.1 million, we, propose an architectural services fee of, not to
exceed, eight and half percent (8.5%) of actual construction costs.
J,pJ.gjg t ovall'on to the
T�'ie pge,�ject consists es�gn and ot a rEnx
Q'I%ic („c ntr.rCrra':,rleo.S al 2D25 5, C(Alegkitt',, Dr, lkmis,'l X 75460. :'iss beeni e:orrhpleted and
hic,haded prt,rgjjain,in6ng and to estat'Aid'i the; ,,,,aiosarid is the Ch,44Centfn
Pk% ase 2%011, be based on th:(andhigs ril"fr,ne sjpiecificaH,,,,
41ejiltufed in 13, 1! 5 4,,i!f dte Stxat�Ahoi&`s Saak�et, I"L h! t° III fa! gely s'covsts Of aestnl"XXYI 142410%1„3fioins'
root r'('q:hare 's"Vri PrliraP, tq,gu"-Ies, flk°x�)6ng' fini!�ih �qgradeg B Puff,' )'Vay, Cswid(,�rs and
orliereni,,:e R0139,11s Pas c6hng We r4a!pPa<',errient, sec�iNty upgrades, fire allann 4upgnsdes,
andwhi&upguades, AD,A accessibih',,y,: upgradei,and exteidr'a11 k0edrnjx"dnfirlt}"'
Q J N,",ar N S'vj'N/'7, 7!2",'f T �"'Q'fpc'
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 5 of 8
WRA k pmud W the fact ffiat c'tta basic se0hw4ces fee includes the 4C19�1St
seivices ht the firtdt.hsby, A parflat, flst of standaid as
Mwe 3D
Ww 3D kw% EAMM OWWMg
SPU
au arc hhwt DQin
FF&E C000dirwkr,,
"'kssnral,,Ce'
Cwmaa DmIlei vus - Plam and Spec Mcadons Noon NsanuM
0 13i,6ldwq V',,,,Jn, k uw e"Wdyt 1"m6mbg Mmmaln Dmvmwt,,�,,
0 001 EngkwvlQ
Engweedng
if's
('Life ar""J" Fire 5,4,-stennns
fcbmQ MWmaum ENMg,,,2
Mv Mge Syewn DeQ,
;QMMkM3bMwn MMM401 Dmj"'
FoMewle CanwhOg and Men Eksyn,
1 wdKye AmMwme wt 4 4MOn Do4n
Rooi'(��.orisidflng artd I)esign
ccesslibO,4'T''v ADAAl (9°" t,
VVayfindirlg Design
Zon,'nrig . . ... �
Cmumahn MWMwakn
r'Zkne I ut
',,Alal ran",,
flrte 1,.woject se,,,,r,,,kes are nat ui)6!,wt1,"9e,, .'Ikrchitects' saqseoQmpmmbHq and
cmimushima" Wh be ckq Muld the,,y, 1w reqihed: 149bwida9y �!Ae
MM, cMl en&ewhig ca Wke' Met rnodificaflonis air,kd VOW Wkq and any adw
mnwhwl doln ser,,ISP es n!�'qp,6tef,:l fo,%y thoe citry, testing irw,'Jtldir% asloes= uzny,',
geowdMus immolson and knwkaHort rnaterW �,estli'C& II IVAC
Wt md bWwwe kammNAM& and Thms Amen hil Starx1aids pi[an moietv
1 he Ardh,,itect vviH assist 4,11 the t 4 these
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 6 of 8
Antic d Schedule:
`3elea�Akuii of Aa [dte,,u:tuvai Finrn July 2021
PrcTuan,,,frnirig and Ne - Ida siSt"I CvrrYp4,led 'n'mna fliwase
Stakef'mkfer's Bou Met
khemak DeMp and EAQ DewkpmeM Cat-riplete Septembe� '2C),21, (2 n'icrithsl
Cf!mstiuction 0octerients l:w"ber 3021. (3 manQ'I
Period Ctwnptet(,,a hWmh 202. 0 maKs),
consuixuan Sipternlx!022�,6
WtRMBww&pV' M'Iej'x.:w OFVT�em Mtn G AWWON Badc NO, 1 bamW cwt pemenmg
of conshucdon cmt pmpns Wgs W51" WH be bz�',aerl an flie
cost unUf due mclu',fl cr d5t �s WaWkhed,
nes herrW aCc �rrI
DO,,
Design� ()1e,,,,fa1op'nent
--------- 300111
WwWon Dcwurnent",--
3 5%a
BWd&gTNgWWUon Pho
conmMuml Phase
!SdyElcept as r6puM whvmhe W dhe Ofir evAmbRect agreemml,
pqnmM to adMW Modwk subms wW be pwo=i,,aA fle houOy 'ti"vhich icWk1w,
fhese rates sl"iall oke amwQ almd & aan%me uth nomid KaW Wom pmcHcn cl dw
1�0=1111
ratA,,',,,s to be dewmked as nseded
H! be II eadzed asul ideMlaed as Elsic Senkes,
R5w&wwWe EVeme cndrJ�J'Nonal Sewtces. Llrdie;ss, ot+ta,nkxhe sal(CL staternerits ,,i,4H be
sOmMmEd a%m Ow be., mmomNs h bun ddlowL Flayrrjer'9Ts)wfll! 1a4;°,lvlthiri thirty 90,'�
days AWNg reQ of Ae sWwmwnt,
Neme Modze and rdwn a Qwd cq)y to thk,-, offlce if ace:,epta[-de. IN ajj,,qp,-o,,,ec,,4 it k, undeStxxd,,:i
Umt a WW agieernent estabHsk", alapkcable tiarrm aind �4°uWuo.kulttrnWe'a ax 101 me�kluW1.,"a
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 7 of 8
2 1 0,004,ti"'mar
Associates1';o"foO!hC'H
111'
. .....
. ........
F Wd 4Dbse4
Sec�f,etinrW!Y\Iad Rots:'SSNIR,
ratA,,',,,s to be dewmked as nseded
H! be II eadzed asul ideMlaed as Elsic Senkes,
R5w&wwWe EVeme cndrJ�J'Nonal Sewtces. Llrdie;ss, ot+ta,nkxhe sal(CL staternerits ,,i,4H be
sOmMmEd a%m Ow be., mmomNs h bun ddlowL Flayrrjer'9Ts)wfll! 1a4;°,lvlthiri thirty 90,'�
days AWNg reQ of Ae sWwmwnt,
Neme Modze and rdwn a Qwd cq)y to thk,-, offlce if ace:,epta[-de. IN ajj,,qp,-o,,,ec,,4 it k, undeStxxd,,:i
Umt a WW agieernent estabHsk", alapkcable tiarrm aind �4°uWuo.kulttrnWe'a ax 101 me�kluW1.,"a
Architectural Services Contract — Amendment #1
WRA Architects, Inc. Page 7 of 8
Archl,,tect:
Mary O'Brien
WPA Architects, Inc.
signako e
ap���
_Date Sig,Fiat ure
Date
Architectural Services Contract — Amendment #1