Loading...
1987-033-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the RESOLUTION NO. 87-033 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the contract for construction of Additions to Water Treatment Plant to Heritage Constructor's, Inc.; and, WHEREAS, the Director of Engineering, John Buss, recommends the amendment of said contract by Change Order No. 8 attached hereto as Exhibit "A", which provides for a net increase in contract price of $3,654.00 to a total of $3,108,553.00 with four (4) days increase in contract time, for alternate temporary backwash installation, additional support braces for piping in sedimentation basins, concrete reinforcing dowels for backwash trough, adjustment to elevation of sedimentation basin sludge manhole, concrete reinforcing dowels for filter pipe gallery roof deck, reconstruct failed portions of high service pumpage metering manhole, two 450-24" diameter bends to mitigate grade conflict between proposed 24" supernatant pipe and existing buried piping, electrical circuits necessary to power heat trace, power and control circuit for ammoniator, starter for blower motor on lime silo, deleting filter tile, deleting excess conduit allowance provided in item 1, deleting 540 linear feet of grout replacement, and authorizing contractor to proceed with modifications of high service pump suction piping by force account methods as specified under Method C in General Provisions, Part 6.03; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, That the contract for Additions to the Water Treat- ment Plant is hereby amended by Change Order No. 8 attached hereto as Exhibit "A" and the Mayor of the City of Paris, Billy Joe Burnett, is hereby authorized and directed, on behalf of the City of Paris, to execute said Change Order. Passed and adopted this 25th day of March, 1987. ~~~ Bi e Burnett, Mayor ATTEST: ~~, ~~~~W att~e unning am, City er AP;::1 FORM, ------ City of Paris P.O. BOX 1037 n PARIS, TEXAS 75460 CHANGE ORDER # 8 PROJECT TITLE Additions to Hater Treatment Plant PROJECT NO. 82.10A CONTRACT NO. 15-82-10-0340 CONTRACT DATE 1- B-R/; CONTRACTOR Heritage Constructors. Inc. The following changes are hereby made to the Contract Documents: CHANGES TO CONTRACT AMOUNT ADDITIONS: - 1. Alternate Temporary Backwash Installation. . . . . . . . . . 2. Additional Support Braces for Piping in Sedimentation Basins. 3. Concrete Reinforcing Dowels for Backwash Trough. . . . . . . 4. Adjustment to Elevation of Sedimentation Basin Sludge Manhole 5. Concrete Reinforcing Dowels for Filter Pipe Gallery Roof Deck. . . . 6. Reconstruct Failed Portions of High Service Pumpage Metering Manhole. 7. Two 450-24" Diameter Bends to Mitigate Grade Conflict Between Proposed 24" Supernatant Pipe and Existing Buried Piping . 8. Electrical Circuits Necessary to Power Heat Trace (Electrique Items 3, 6, 8 & 9) 9. Power and Control Circuit for Ammoniator 10. Starter for Blower Motor on Lime Silo DEDUCTIONS: 1. Delete Proposal Item-2 (Filter Tile) .... 2. Delete Excess Conduit Allowance Provided in Item-l (Per Item-7 of Addendum-3) 3. Delete 540 L.F. of Grout Replacement . . . . Total Contract Price Increase Due To This Change Order. Contract Amount Prior To This Change Order . . . . . . New Contract Amount Resulting From This Change Order . $2,558 145 780 600 240 2,185 778 1,885 1,408 1,354 (3,300) (4,500) (48(1) 3,654 3,104,899 3,108,553 CHANGES TO CONTRACT TIME Increase Contract Time By 1 (one) Day for Installino Surface Wash Supports in Sand Filters Increase Contract Time Bv 3 (three) Days for Reconstructing the High Service Pumpage Metering Manhoie Total Contract Time Increase Due To This Change Order 4 Days Contract Period Prior To This Change Order . . . . . 365 Davs New Contract Period Resultino From'This Chanqe Order 369 Days New Contract Completion Date . . . . . . . . . . . March 5, 1987 OTHER CHANGES Contractor is authorized to proceed with increasing size of high service pump suction piping by Method C as specified in General Provisions, Part 6.03. Requested by date Recommended by I ~~' . ecto~f En g2,r1ee. ring Ordered by ___~...J!t' 1 ur e , Mayor Accepted by Dennls Smlth: Herltage constructbrs, Inc. date date dlte Form 15.3 6.d :",of "',4/1