Loading...
1987-032-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 85-087, award the RESOLUTION NO. 87-032 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 85-087, award the contract for the construction of a Wastewater Pumping Station to Johansson Construction Co., Inc.; and, WHEREAS, Ron Pedersen, Staff Engineer, recommends the amendment of said contract by Change Order No. 2 attached hereto as Exhibit "A", which provides for the deletion of the lower gravel parking area and the gravel driveway leading to it, raising the meter vault wall 3'0" to top elevation of 473.00., rewriting the controller program and entering into the Yokogawa Model SLPC programable controller and test running and tuning the system to assure program validity, which results in a reduction in contract price of $1,111.00 to a total of $545,230.00 and an increase in contract time by 61 calendar days; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, That the contract for construction of Wastewater Pumping Station is hereby amended by Change Order No. 2 attached hereto as Exhibit "A" and the Mayor of the City of Paris, Billy Joe Burnett, is hereby authorized and directed, on behalf of the City of Paris, to execute said Change Order. Passed and adopted this 25th day of March, 1987. ~~YM ATTEST: ~,~,'... \::U."""""'~~l Mattie Cunningham, City er APPROVED A ity Attorney .' II, , . . City of Paris ;~ .~~~.._~; ',.,..' 1'.0. uOX 1037 PARIS. TEXAS 754GO CIiANGE ORDER #2 PROJECT TITLE Wastewater Pumping Station PROJECT NO. lI5 20 CONTRACT NO. 1 5-l!5-?0-034 1 CONTRACT DATE Nov. 5. 1986 CONTRACTOR .1nh;tnc;,c;,nn r.nn<:trllrt;nn C'n It:!(, . The following changes are hereby made to the Contract Documents: 1. Delete the lower gravel parkin9 area and the gravel driveway leadinQto it. This item will result in a decrease of.................................... .$2568.00. 2. Raise meter vault wall 3'0" to top elevation of 473.00. This item will result in an increase of....................................$1457.00. 3. Rewrite the controller program and enter into the Yokogawa Model SlPC programable co~trqller.. Test run and tune the system to assure program validity. Thls ltem wlll result in an increase to Contract Time of...................61.days CHANGE TO CONTRACT PRICE: Original Contract Price: '$590,000;00 Current contract price, as adjusted by previous change orders: $546,341.00 The Contract Price due to this Change Order will be decreased by: $1,111.00 The new Contract Price due to this Chanoe Order will be: '$545,230;00 CHANGE TO CONTRACT TIME: The Contract Time will be (increased) (desreased) ~y 61 calendar days. The date for completion of all the work under the contract will be Jan. 5, 1987. Justification: 1. Parking area and drive is unnecessary and subjected to frequent flooding. 2. Meter vault has open top and without raisin(J will Be suBjected to frequent flooding. 3. Characterizing the controller's function generator to correctly control the ball valve is impossible without more than one flow input. The signal to the basin drain valve from split-ranging the P.I.D.output allows flow to be completely controlled. Additional program steps to preset P. 1. D. output al so elimlnates the "timed output" system to avoid excessive pump cycling. .. Requested by Ownpr date Recommended by date ~:n:~~in~8r ~e urne , ayor E. E. Johansson, President Johansson Construction Co., Inc. Ordered by date Accepted by dlte Form 15.3 it h.,' h " t 'J A"