Loading...
1987-080-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-077, award the RESOLUTION NO. 87-080 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-077, award the contract for the Paris Public Library Improvements to Aud1ey Moore Company; and, WHEREAS, William M. Lightfoot, AlA, recommends the amendment of said contract by Change Order No. 7 attached hereto as Exhibit "A" which provides for a net increase in contract price of $2,303.00 to a total of $718,264.00, and an increase in contract time of 7 days, for removing basement concrete floor as needed to replace existing bathroom sewer line with 4" PVC connected to new sewer line, running separate 4" PVC line from existing floor drain connected to old sewer line and adding 20 I X 5' alum "w" pans canopy with fascia and scuppers, wall braces 3' on center; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, That the contract for the Paris Public Library Improvement project is hereby amended by Change Order No.7, attached hereto as Exhibit "A" and the Mayor of the City of Paris, Billy Joe Burnett, is hereby authorized and directed, on behalf of the City of Paris, to execute said Change Order. Passed and adopted this 10th day of August, 1987. ~LK- i e Burnett, Mayor ATTEST: ""'~,~ , -L ~~~N'-.V"'~\~ ') Mattie Cunning am, C~ty er APPROVED AS --- CHANGE ORDER AlA DOCUMENT G10l Distribution to: OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER 0 PROJECT: Paris Public Library Additions (name, address) CHANGE ORDER NUMBER: 7 TO (Contractor): INITIATION DATE: 6/25/87 I "I Audley Moore Construction Company P.O. Box 595 EPhur Springs, TX .75482 -.J ARCHITECT'S PROJECT NO: 17.64 CONTRACT FOR: Lump sum CONTRACT DATE: 8/11/86 You are directed to make the following changes in this Contract: #1 - Remove basement concrete floor as needed to replace existing bathroom sewer line with 4" PYC connected to new sewer line, also run separate 4" PYC line from existing floor drain connected to old sewer line. ADD 1,309.00 #2 - Add 20' x 5' alum "W" pans canopy with fascia and scuppers, wall braces 3' on center. ADD 994.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was.. . . .... ... ... ... .......... $ Net change by previously authorized Change Orders . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. $, The (Contract Sum) (Guaranteed Maximum Cost) prior 10 this Change Order was.... ... ... $ The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order ......................................................... $ The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ The Contract Time will be (increased) (decreased) (unchanged) by The Date of Substantial Completion as of the date of this Change Order therefore is 702,100. 13,861. 715,961. 2,303. 718,264. 7) Days. ~~~J!r'. DATE Audlev Moore Construction CONTRACTOR P.O. Rox 595 Address Sulphur Springs, T,X 75482 .-/ 4" ~ ..,..- ,". BY . '!!- ---....-- ~...- ....'. / .' ... v'/) 'OATf' ,.:.- -::" -'J "/ Authorized: City of Paris William Lil!:htfoot ARCHITECT OWNER Address Address BY DATE AlA DOCUMENT G7.1 . CHANGE ORDER . APRil 1978 EDITION . AlA- . ~ 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2000r. G701 -1978