Loading...
08 - Demolition & Code ReportsItem No. 8 Code Enforcement Report: September, 2021 Cases Worked: 319 Cases Completed: 378 Initial Inspections: 312 Re -inspections: 361 Total Inspections: 663 Lots Abated: 136 Other Work by Abatement Crew: Tree & Brush Removal — 4 days Removed Tires —1 days Removed Illegal Dumps — 4 days Repaired/Serviced Equipment — 2 days Blind Corners — 5 days Building and Standards Report: September, 2021 There were 8 structures presented to the Building and Standards Commission: 265 NE 22nd 2205 Pine Bluff 1427 Graham 647 NW 10th 1202 W Cherry 335 SE 7th 1904 E Cherry 1330 NE 20th There were 5 structures demolished in September, 2021. 948 SE 5th 956 SE 5th 704 SE 23rd 628 W Austin 1036 NW 13th