Loading...
09 - Demolition & Code Enforcement Reports for October & NovemberItem No. 9 Code Enforcement Report: October & November 2021 Cases Worked: 453 Cases Completed: 690 Initial Inspections: 440 Re -inspections: 384 Total Inspections: 804 Lots Abated: 90 Other Work by Abatement Crew: Tree & Brush Removal — 7 days Removed Tires — 4 days Removed Illegal Dumps — 7 days Repaired/Serviced Equipment — 3 days Blind Corners — 5 days Worked Downtown — 7 days Building and Standards Report: October & November 2021 There were 9 structures presented to the Building and Standards Commission: 343 Brown 1008 SW 3rd 513 E Sherman 835 NE 12th 1255 SE 14th 535 E Polk 830 NW 2811 250 NW 33rd 1113 M LK There were 2 structures demolished in October & November, 2021. 1070 NE 13tH 1075 NE 13"