Loading...
1986-109-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the RESOLUTION NO. 86-109 WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the contract for construction of Additions to Water Treatment Plant to Heritage Constructor's, Inc.; and, WHEREAS, the Director of Engineering, John Buss, recommends the amendment of said contract by Change Order No. 5 attached hereto as Exhibit "A", which provides for a net increase in contract price of $3,036.00 to a total of $3,077,255.00 with no increase in contract time, for the removal of concrete at the footings of the existing filters which interfered with installation of the new filter drain pipings, as described in the contractor's letter of September 18, 1986; installation of reinforcing steel dowel bars for connection of the new filter gallery wall to the existing structure, as described in the contractor's letter of August 15, 1986; addition of a 5 degree grade adaptor in the 33-Inch Water Main to allow crossing the existing 20-inch main at the South end of the plant site, as described in the contractor's letter of August 11, 1986; removal of buried concrete slab located West of Maxey Plant, as described in the contractor's letter of September l8, 1986; deletion of handrail at the new rapid mix and blending tanks and modification and installation of the handrail material at the new filters, as described in the contractor's letter of September 18, 1986; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, That the contract for Additions to the Water Treatment Plant is hereby amended by Change Order No. 5 attached hereto as Exhibit "A" and the Mayor of the City of Paris, Billy Joe Burnett, is hereby authorized and directed, on behalf of the City of Paris, to execute said Change Order. Passed and adopted this 20th day of October, 1986. ."iI~~ B Y, Burnett, Mayor ATTEST: ~~,,~~ Mattie Cunning am, Ci er APPROVEDAS~ FORM: J..// ...11, ~~]& Ci(y of Paris "-".... '-~'\', . P,O. BOX 1037 I I PARIS, TEXAS 75t60 CHANGE ORDER # 5 82.10 CONTRACT NO. Heritage Constructors, Inc. Plant 15-82-10-0340 CONTRACT DATE 1-13-86 PROJECT TIT LE PROJECT NO. CONTRACTOR Additions to l'later Treatment The 1ollowing ch(:lnge~ are hcrcby made to the Conlract Documents: 1. Removal of concrete at the footings of the existing filters which interfered with installation of the new filter drain piping, as described in the contractor's letter of September 18, 1986. Contract price will be increased by.... .... ................$456.00 2. Installation of reinforcing steel dowel bars for connection of the new filter gallery wall to the existing structure, as described in the contractor's letter of Auqust 15, 1986. Contract price will be increased by................. .......$288.00 3. Addition of a 5 degree grade adaptor in the 33-Inch Water Main to allow crossing the existing 20-inch main at the south end of the plant site, as described in the contractor's letter of August 11, 1986. Contract price will be increased by....................... .$907.00 4. Removal of buried concrete slab located west of Maxey Plant, as described in the contractor's letter of September 18, 1986. Contract price will be increased by ........................$1,085.00 5. Delete handrail at the new rapid mix and blendin9 tanks and modify and install the handrail material at the new filters, as described in the contractor's letter of September 18,1986. Contract price will be increased by ........................$300.00 Total contract price increase due to this Change Order......$3,036.00 Contract price prior to this Change Order...................$3,074,219.00 New contract price due to this Change Order.................$3,077,255.00 Change to Contract Time : None Requested by Cit diite Recommended by date ng1 neerl ng Ordered by date Sllly Joe Burnett, Mayor Accepted by date Joe LaRue, Heritage Constructors, Inc. Form 15.3 I