1986-109-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the
RESOLUTION NO. 86-109
WHEREAS, the City Council of the City of Paris did
heretofore, in Resolution No. 86-001, award the contract for
construction of Additions to Water Treatment Plant to
Heritage Constructor's, Inc.; and,
WHEREAS, the Director of Engineering, John Buss,
recommends the amendment of said contract by Change Order
No. 5 attached hereto as Exhibit "A", which provides for a
net increase in contract price of $3,036.00 to a total of
$3,077,255.00 with no increase in contract time, for the
removal of concrete at the footings of the existing filters
which interfered with installation of the new filter drain
pipings, as described in the contractor's letter of
September 18, 1986; installation of reinforcing steel dowel
bars for connection of the new filter gallery wall to the
existing structure, as described in the contractor's letter
of August 15, 1986; addition of a 5 degree grade adaptor in
the 33-Inch Water Main to allow crossing the existing
20-inch main at the South end of the plant site, as
described in the contractor's letter of August 11, 1986;
removal of buried concrete slab located West of Maxey Plant,
as described in the contractor's letter of September l8,
1986; deletion of handrail at the new rapid mix and blending
tanks and modification and installation of the handrail
material at the new filters, as described in the
contractor's letter of September 18, 1986; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PARIS, That the contract for Additions to the Water
Treatment Plant is hereby amended by Change Order No. 5
attached hereto as Exhibit "A" and the Mayor of the City of
Paris, Billy Joe Burnett, is hereby authorized and directed,
on behalf of the City of Paris, to execute said Change
Order.
Passed and adopted this 20th day of October, 1986.
."iI~~
B Y, Burnett, Mayor
ATTEST:
~~,,~~
Mattie Cunning am, Ci er
APPROVEDAS~ FORM:
J..//
...11,
~~]& Ci(y of Paris
"-".... '-~'\', . P,O. BOX 1037 I I PARIS, TEXAS 75t60
CHANGE ORDER # 5
82.10
CONTRACT NO.
Heritage Constructors, Inc.
Plant
15-82-10-0340
CONTRACT DATE 1-13-86
PROJECT TIT LE
PROJECT NO.
CONTRACTOR
Additions to l'later Treatment
The 1ollowing ch(:lnge~ are hcrcby made to the Conlract Documents:
1. Removal of concrete at the footings of the existing filters which
interfered with installation of the new filter drain piping, as described
in the contractor's letter of September 18, 1986.
Contract price will be increased by.... .... ................$456.00
2. Installation of reinforcing steel dowel bars for connection of the new
filter gallery wall to the existing structure, as described in the
contractor's letter of Auqust 15, 1986.
Contract price will be increased by................. .......$288.00
3. Addition of a 5 degree grade adaptor in the 33-Inch Water Main to allow
crossing the existing 20-inch main at the south end of the plant site, as
described in the contractor's letter of August 11, 1986.
Contract price will be increased by....................... .$907.00
4. Removal of buried concrete slab located west of Maxey Plant, as described
in the contractor's letter of September 18, 1986.
Contract price will be increased by ........................$1,085.00
5. Delete handrail at the new rapid mix and blendin9 tanks and modify and
install the handrail material at the new filters, as described in the
contractor's letter of September 18,1986.
Contract price will be increased by ........................$300.00
Total contract price increase due to this Change Order......$3,036.00
Contract price prior to this Change Order...................$3,074,219.00
New contract price due to this Change Order.................$3,077,255.00
Change to Contract Time : None
Requested by Cit
diite
Recommended by
date
ng1 neerl ng
Ordered by
date
Sllly Joe Burnett, Mayor
Accepted by
date
Joe LaRue, Heritage Constructors, Inc.