Loading...
09 - Demolition & Code Enforcement ReportsItem No. 9 Code Enforcement Report: March 2022 Cases Worked: 246 Cases Completed: 261 Initial Inspections: 257 Re -inspections: 165 Total Inspections: 412 Lots Abated: 13 Other Work by Abatement Crew: Tree & Brush Removal — 2 days Removed Tires — 9 days Removed Illegal Dumps —10 days Repaired/Serviced Equipment —1 days Building,and Standards Report: March 2022 7 structures were presented to the Building and Standards Commission: 904 Cedar 1031 Grove 1050 SE 17th 651 SE 12th 1830 W Washington 725 Jackson 560 E Washington There were 2 structures demolished in March, 2022: 431 NE 1st 541 NE 6th