Loading...
09 - Code and BSC ReportsItem No. 9 Code Enforcement Re ort: Ari Cases Worked: 224 Cases Completed: 112 Initial Inspections: 222 Re -inspections: 111 Total Inspections: 313 Lots Abated: 25 Other Work by Abatement Crew: Tree & Brush Removal — 3 days Removed Tires — 4 days Removed Illegal Dumps —10 days Repaired/Serviced Equipment— 2 days Building and Standards Report: April, 2022 11 structures were presented to the Building and Standards Commission: 658 SE 3rd 475 CR 12050 738 W Cherry 926 W Cherry 535 NW 10th 456 NW 1411 1416 W Plum 716 W Cherry 1010 W Cherry 620 NW 131h 405 NW 14th There were 2 structures demolished in April, 2022: 322 NE 17th 334 NE 17th