09 - Code Enforcement ReportsItem No. 9
Code Enforcement Report: Ma 2022
Cases Worked: 641
Cases Completed: 323
Initial Inspections: 633
Re -inspections: 423
Total Inspections: 1046
Lots Abated: 215
Other Work by Abatement Crew:
Tree & Brush Removal — 4 days
Removed Tires — 3 days
Removed Illegal Dumps — 10 days
Repaired/Serviced Equipment -2 days
Buildin .and Standards Report: April 22022
9 structures were presented to the Building and Standards Commission:
3220 Cleveland 1009 NE 8th
418 & 420 Tudor 333 Bonham
251 E Booth 351 NE 8th
621 NE 11th 240-306 SW 2nd
City Block 174-A, Lots 11 & 12
There were 2 structures demolished in April, 2022:
1131 NE 14th
339 NW 19th