16 B - Award bid Phase I of the Wastewater Treatment Plant to Thalle ConstructionNo. 16 October 11, 2022 Grayson Path City of Paris 135 SE 1 s' Street Paris, TX 75460 3010 Gaylord Parkway Suite 190 Frisco, TX 75034 TEL 972.377.7480 FAX 972.377.8380 www.Ga rverUSA.com Re: Paris Contract No. 1 Phase 1 WWTP Improvements Recommendation of Award Mr. Path: Bids were received for the Contract 1 Phase 1 Wastewater Treatment Plant Improvements Project at City Hall at 2:00 PM on September 801. A total of two (2) bids were received on the project. A tabulation of the bids received is enclosed with this letter. The bids have been checked for accuracy and compliance with the contract documents, and all bidders have provided the required documents. The two base bids and associated bid alternates received are summarized as follows: Thalle Gracon Item Type Description i Construction Construction, Co., Inc. Inc. Bid Item 1 wwwwwwwwwwwww_ All work except as indicated in other bid $64,460,000 $69,950,000 items Bid Item 2 Trench Safety System $5,000 $2000 Bid Item 3 Cash Allowance 1: Double Disc Pump $223,950 $223,950 Equipment Bid Item 4 Contingency Allowance 1 forwork $1,000,000 $1,000,000 change directives Contingency Allowance 2 for primary Bid Item 5 electrical service installation and L $120,000 $120,000 rerouting Bid Item 6 Contingency Allowance 3 for Special $60,000 $60,000 Inspections and independent testing Bid Item 7 Contingency Allowance 4 for additional $45,000 $45,000 GPS -based survey Bid Item 8 Contin Allowance 5 for Additional gencField $20,000 � $20,000 Trailer Equipment Bid Item 9 Additional area of 10" compacted gravel - 0 $50,000 $65,000 surface Bid Item 10 Solids, sludge, and grit removal and $160,000 $340,000 disposal Total Base Bid _ _ $66,142,950 71,843,950 Item Type Description Thalle Gra -on Deduct Generator, Concrete Pad, and Alternate 1 associated electric, instrumentation, and - $1,025,000 -$760,000 controls Alternate 2 Deduct for abandoning in-place the - $1,080,000 - $400,000 Orbital Aeration Basins Alternate 3 Deduct for deleting Final Clarifier 4 - $1,425,000 - $1,280,000 Alternate 4 Deduct for deleting rehabilitation for Final - $1,480,000 - $1,600,000 Clarifiers 1, 2, and 3 Alternate 5 Deduct for deleting Primary Clarifier 2 -$420,000 - $1,170,000 Additional Unit Price Item 1 100 LF of concrete crack repair $150/LF $60/LF Additional Unit Price Item 2 Existing clarifiers toping grout $1,000/CY $1,200/CY Additional Unit Price Item 3 Existing concrete resurfacing $500/SF $400/SF Both contractors were approved through pre -qualification, and we consider Thalle Construction Co., Inc., the low bidder, to be a responsive, responsible bidder. We believe that the bid submitted by Thalle Construction Co., Inc. represents a good value for the City of Paris. We recommend that the construction contract for the Contract 1 Phase 1 Wastewater Treatment Plant Improvements project be awarded to Thalle Construction Co., Inc. in the amount of $65,118,950.00 by accepting the base bid with Deductive Alternate 1. Please call if there are any questions. Sincerely, GARVER, LLC deA A. C _, Lance Klement, P.E. Senior Project Manager