Loading...
28 - Amendment of Fee Schedule for Building Permitting - Planning and Zoning - PUblic Works - Engineering -Fire Marshal DepartmentItem No. 28 TO: Mayor, Mayor Pro Tem and City Council Grayson Path, City Manager FROM: Andrew Mack, AICP Director Planning & Community Development Michael Smith, Director Public Works Duke McGee, Building Official Clyde Crews, Fire Marshall Derek Dacus, Engineering Technician SUBJECT: Building, Planning & Zoning, Fire and Engineering Permit Fees DATE: December 12, 2022 BACKGROUND & DISCUSSION One of the greatest challenges every municipality faces is being able to fund the services it provides. While a municipality has numerous options for sources of revenue to support these services, the default source of funding is property tax. However, citizens, councilmembers, and staff actively seek opportunities to supplant property tax with other forms of revenue when possible and appropriate. While many of our city departments do not have the option of producing much if any revenue, there are several departments that do have the option available to apply fees to help cover the cost of the service provided by that department. This can help with replacing the need for property tax support, thereby cutting the property tax or redirecting it elsewhere for additional needed services in the City. One such revenue source that the City has available to it is through its Building, Planning & Zoning, Fire and Engineering permits & services via charging fees for permits, reviews, inspections, water & sewer taps, etc. This can help to offset the cost of operating these departments. Ideally, the fees charged would equal the operating expenses, but unfortunately this has not been the case in the City of Paris. While the amount of local development ultimately drives whether or not revenue is collected, it is difficult to guarantee that certain fixed costs (ex: payroll, insurance, etc.) will be covered strictly by internal department revenue. As such, it is logical and fair that as much of the cost of permitting and inspection services as possible should be borne by those receiving the specialized service and not be an additional burden on the general taxpaying public. Some services in these departments do provide a direct public benefit by ensuring public safety, thus warranting little to no fee and being supported by public funding. However, most of the services performed in these departments directly and primarily benefit the developer and additional consideration should be given to more closely aligning these fees paid for by the developer commensurate with the cost of providing the services. In other instances, the cost of labor and parts have increased over time such as for the water & sewer tap services. In order to align our permitting and development review processes better with the aforementioned Page 1 of 2 principle, a new permit and inspection system and process has been established. This system allows for better performance and tracking on My Gov of the specific service requested and allows us to establish fees that are more in proportion with the service offered. By reviewing our current processes, we have realized the existence of numerous permits and services that currently are without established fees. This process has also allowed us to utilize time and motion studies to assess current fees to determine where adjustments are required. In addition, a fee study of Texas municipalities with similar populations was completed to compare our current fee schedules. As a result of these reviews, modifications to our current fee schedule are proposed for updating. The proposed fees will more accurately cover operational costs, shifting more, but not all of the costs directly to those receiving the specialized services and diminishing the burden on the general taxpayer. This proposal covers our Community Development Building Permitting and Planning & Zoning Department, Public Works Department, Fire Marshal Department, and Engineering Department Fees. We would recommend annual or at least biennial review of this fee schedule to ensure the fee structure remains appropriate and within industry standards. The City Council can choose to approve all proposed fee changes, some of the proposed fee changes, none of the proposed fee changes, or request additional information and/or edits. Attached are: • Proposed Fee Schedule Ordinance • Proposed Fee Schedule with current fee comparison • Proposed Fee Schedule with time and motion study • Texas City comparisons • Estimated Departmental hourly operational cost RECOMMENDATION Staff recommends adoption of an ordinance amending the Community Development Building and Planning & Zoning, Public Works, Fire and Engineering Permit and Services Fees. Page 2of2 ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, AMENDING APPENDIX A, "FEE SCHEDULE," OF THE CODE OF ORDINANCES RELATING TO CONSTRUCTION AND DEVELOPMENT FEES; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; PROVIDING A REPEALER CLAUSE, A SEVERABILITY CLAUSE, A SAVINGS CLAUSE, A PENALTY CLAUSE; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the Appendix A of the City of Paris Code of Ordinances provides a fee schedule for city permits and services, including those related to construction and development; and WHEREAS, the city has not conducted a comprehensive review of those fees in several years, and the cost of providing the services reflected therein has increased over time; and WHEREAS, the City Council finds it desirable to revise these fee schedules so as to allow the city to perform the services related to said permits and related work on a break even basis, thus avoiding having to subsidize those services from the taxes of those not directly benefitting from the development; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble to this ordinance are hereby in all things approved. Section 2. That Appendix A, Article A3.000 of the Code of Ordinances of the City of Paris shall be and is hereby renamed "DEVELOPMENT AND RELATED PERMIT FEES." Section 3. That Appendix A, Section A3.002, "General construction and planning permit fees," shall be and is hereby amended to be renamed and to read in its entirety as follows: "Sec. A3.002 Development and General construction and planning permit fees. 5.Accessory Building - Without MEP $100.00 6. Accessory Building - With MEP $150.00 7. Repair HVAC$50.00_ aa_ 8. HVAC'New $50.00 9. Meter Repair $50.00 10. Generalmm�Electrical.....�� Work $50.00 11. Rewire $50.00 12. Water Heater$50.00 -._........... 13. Gas Test - $50.00 14. Misc. Plumbing Repair $50.00 15. -. .. .............. Sewer Relay $50.00 16 Water Relay $50.00 17. ��.......�.�.�...____wwwwwww___- Irrigation $50.00 18. Swimming Pool - Above ' Ground $75.00 19. Swimming Poo 1- Below Ground ...... $200.00 20. Swimming Pool - Repair/Correction ....�...... $75.00 21. ..�........................ Plan Review $25.00 22. PV Solar Panel s $75.00 23. Foundation Repair $50.00 24. EV Charging System00 $50 . 25. �............ �. Generator Installation . _...._W.................. w.. _ ........_ W_v $50.00 Commercial ..... .......... 1. .____ ._ Commercial New Value Based 2. Commercial Remodel Value Based Commercial3. Re-Roof Value Based 4. Commercial Mechanical .......... ..............ti Value Based S. Commercial Electrical ��_��..................... _. ...._.._W Value Based 6. Commercial Plumbing mmmmLot Value Based 7. Parking /Paving Value Based 8. Retaining Wall Over 4' $100.00 9. Fencing Over 7'$50.00 10. y �.......... Solar System ........_..... _ Value Based 11. Accessory Building .n...... Value Based 12. .... Irrigation _._._ $100_._0_.0 13. �... Swimming Pool Value Based 14. Plan Review 25% of Permit Fee 5. RPZ/Backflow $25.00 Certificate of Occupancy mmmmmm mm.J. . Option 1- $100.00 Flat Certificate of Occupancy Option 2 - $25.00 plus 1. $25.00 ger inspection 2. Clean & Show . $5000 3. ............................ Temporary Certificate of Occupancy ...... ... _ .. . _ . $150.00 Signs 1. <50 sgft (singlesided or re -face) $50.00 2. �_.�................................ <50 s qft double sided) ......-_._.. $75.00 3. >50 sq.ft ..(.sin_..g_le.....s....i..d.ed or re -face) ..... $100.00 q, >50 sqft (double sided) _.m...... w_ _... $150.00 S. Monument Sign $200.00 6. Fla..... gs & Banners (Temp Signs) $75.00 7. _._..._ Billboards ............. $500.00 8. Billboard Annual Registration $100.00 9. _...._. _.._... Sign Recovery _._._._._ -..._ $25.00 ........ Misc Building Department Permits - .................._..........._ - ........ _ . .�.......... ��� ..._ 1. Solar System $50.00 2. Moving (building)$100.00 per building 3.Construction ............ Trailer $100.00 4. Demolition -. _._ $50.00 S. Temp Pole Electric $50.00 ID t 1. Site Plan Review_ 25% of Permit Fee 2. Site Permit & Engineering fee 3% of job cost 3. Grading Permit$250.00 4. .... _m......... _... ClearingPermit (tree removal) _ w ........ ........ $200.00 _ w.. Right of of Way (RoW) - Working in Right ......._ .- $100.00 5. W Way 414///4/"/,,A//SL � ,, , Water 1. Standard 1" - in pavement $1790.00 2. Standard m1"mm-mmin soil (same s ide) mmITITITITmm WW $890.00 3. Standard 2" - in pavement $2610.00 4.Standard 2" - soil (same side) $1900.00 5 . Split Se ............. Service - in pavement ............_....... _..__ $2610.00 6. Split Service - soil (same side) .... ... ...�..................... $1100.00 7. 5 & 5 Program See Policy Sewer 1. Standard 4" - in pavement $2260.00 2. Standard 4" - in soil (same side) $800.00 3. .............. Standard 6" - in pavement e $2500.00 4 �� ® Standard 6 soil (same side) ......_................ $1000.00 5. Split Service - in pavement $2210.00 6. Split Service - soil (same side) $1000.00 7. 5 & 5 Program See Policy � „ , „ „ , „ ", ,,,,,777,,,,7 7 F. 1. .._.N_... www Underground Fire Main $200.00 $1.00 per fire sprinkler Above -Ground Fire Sprinkler System head $200.00 min - 2. $1200.00 max. $1.00 per fire alarm Fire Alarm System device $200.00 min - 3. _ _ _..�. $1200.00 max. 4..... Fixed Fire Extinguishing System _.-_........................_......................... $150.00 per system Flammable & Combustible Liquids $100.00 per tank 5. ............. Tanks 6. LP -Gas ................... _._............. ............ �. $50.00 7. Spraying or Dipping $150.00 8. Standpipe System $150.00 9. Electronic Access Doors & Gates $150.00 Fire Operational Permit ........- .. �....... __....... _.. .............. 1. Explosives $500.00 2. Fire Works & Pyrotechnics $100.00 _ 3. _ _......................_......................................_.__......... Fire Hydrants and Valves $50.00 4........ Hot Work Operations .__ _...._. ........ $25.00 S. Open Burn - Standard (Residential) www $50.00 6. 0........._..._... pen Burn - Standard (Commercial) _ _.... $250.00 7. Open Burn - Recreational $50.00 8. Open Burn - Agriculture (annual) $50.00 9. ...._.. Temporary Fuel Dispensing & Storage �_.__.._.�....� .. _ ............... $50.00 er tank Fire Annual In�...__.�__.._..._ spection _..­....-._ 1. Nursing Home $75.00 2. Daycare (adult or child) ..�.. $35.00 3 Group Homes ......... _ .......... $35.00 4. Hospital $175.00 S. Commercia........l B..____ uil ding $50.00 Miscellaneous Fire Department Fees .................. .................................................................. 1. Application Fee $50.00 2. Flow Test $50.00 per test False Alarm Fee - Commercial 4 to 6 $50.00 per alarm in a 12 3. alarms month period False Alarm Fee - Commercial 7 and $75.00 per alarm in a 12 4. More alarms month period 5. Hotel or Motel $25.00 Plus $5.00 a room 6. Failed Inspections over 3 Permit cost Licensed FB sannual)ter or Adoption Home < 7 ........ W_ ................ _. $0.00 7. Children Licensed Foster Home > 7 Children ......... .......... $100.00 8. annual Requested General Commercial Fire $50.00 plus $0.10 a 9. Ins sections square foot 10. Industrial or Buildings over 50,00 sqft $200.00 11. Misc. Fire Inspection Fee $50.00 per hr 00 .. 1. Pr eliminary or Final Plat ..._......__.._..m...._. $300.00 plus $S per lot 2. ................ _ Replat _ _.. $300.00 plus $5 per lot 3. Minor Plat (>4 lots w/no utility ext.) _................................._...__. w .. $150.00 Planning & Zoning ............ 1. Zoning Verification Letter $50.00 2. .......................�............... Variance - Board of Adjustment $300.00 3. Z 4. ----.....___ w......w_ WPIan......... Minor. ............. Amendment $400.00 5.Specific Use Permit $400.00 6 ..__ Vacation of Easement or Alley $200.00 7. Annexations - Dis-annexation$350.00 8. Planned Development........................................................................m. $500.00 Contractor .......... 1. Sign Contractor ..�....... _. $50.00 2. Sign Contractor Renewal $35.00 3 �__6.........�_.......�_.6.�. House Movers H .... .... _ ...�...__.___ ....._. $25.00 . _ ...... Other _ $500.00 (1st year + $50.00 Vacant Building increase each year 1. thereafter $250.00 (1st year +$25.00 Vacant Building (Historic Districts) increase each year 2. thereafter . �t E i, i Inspection Fee ._....._...�...W_ .�ww 1 . AfterHours $100.00 hr (min 2 hrs) 2. Re -Inspection $50.00 3. Rental Property Re -Inspection $25.00 4. Stormwater $50.00 a da 5. Misc. Inspection Fee $50.00 per hr OtherFees....................��........._�..m........................�� ..__.......................�....... ._.................._................--..�................................._... 1. Appeal to Building Board$200.00 ................................. ........... ....................... thereof, to and including the $25,000.00 Unsafe Building - Buildings and $402.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction 2. Standards..........m 3.Special ....................... Event _............................. ___ _. $200.00 4. Work without permit $50.00 per day S. w.... �v�.....� w .wwww...ww Home occupation $75.00 6. Processing Fee $25.00 7. Misc. Permit $50.00 . 3rd Party Consultation, Review or ... .....���� ITITITIT�ITITITITITITITIT_.�_��_.__�_ Actual Cost 8. Inspections 9. Deconstruction Permit $25.00 Commercial Building Valuation Table $1.00 to $500.00 $501.00 to $2000.00 Di„ ";'11111111111111111P �,,/ $35.00 $35.00 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2001 to $25,000.00 $80.75 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including the $25,000.00 $25,001.00 to $50,000.00 $402.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $655.25 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,005.25 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,245.25 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,620.25 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof Section 4. Sections A3.002 -A3.008 shall be and are hereby amended by deleting them in their entirety. Section 5. Appendix A, Article A5.000, "FIRE PREVENTION AND RELATED FEES," Section A5-001, "Permit and plan review fees," shall be and is hereby amended by deleting it in its entirety, and Section A5.002, "Fire and rescue service fees," shall be renumbered accordingly. Section 6. That all provisions of the ordinances of the City of Paris, Texas in conflict with the provisions of this ordinance are hereby repealed, and all other provisions of the ordinances of the City of Paris not in conflict with the provisions of this ordinance shall remain in full force and effect. Section 7. That the repeal of any ordinance or part of ordinances affected by the enactment of this ordinance shall not be construed as abandoning any action now pending under or by virtue of such ordinance or as discontinuing, abating, modifying, or altering any penalty accruing or to accrue, or as affecting any rights of the municipality under any section or provisions of any ordinance at the time of passage of this ordinance. Section 8. That it is the intention of the City Council of the City of Paris that this ordinance, and every provision hereof, shall be considered severable, and the invalidity or partial invalidity of any section, clause, or provisions of this ordinance shall not affect the validity of any other portion of this ordinance. Section 9. That any person violating any provision of this ordinance shall be guilty of a Misdemeanor, and upon conviction, shall be subject to a fine in accordance with provisions of Sec. 1-6 of Chapter One of the City of Paris Code of Ordinances, and each and every day's continuance of any violation of the above -enumerated sections shall constitute and be deemed a separate offense. Section 9. That this ordinance shall become effective from and after its passage and publication as required by law. PASSED AND ADOPTED on this 12th day of December, 2022. Paula Portugal, Mayor ATTEST: Janice Ellis, City Clerk APPROVED AS TO FORM: Stephanie H. Harris, City Attorney