18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam BoltonItem Nos. 18 & 19
TO: Mayor, Mayor Pro -Tem and City Council
Grayson Path, City Manager
FROM: Andrew Mack, AICP Director Planning & Community Development
James Hooten, Assistant Building Official
Cheri Bedford, Main Street Coordinator & Historic Preservation Officer
SUBJECT: Approve Low Bid Award for Construction of New Permanent Restrooms for
Paris Farmer's and Artisan Market — and —
Approve Contract for Services with Adam Bolton Construction, LLC dba IBEX
Builds
MTG. DATE: January 23, 2023
BACKGROUND
For the past two fiscal years, the City Council has approved a construction budget for new
permanent restrooms in the Downtown Farmer's and Artisan Market on SW 1" Street across
from the Library. This project completes a portion of another recommended project in the
Downtown Plan. Following completion of construction design plans and the circulation of
plans for preliminary estimates to 3 local construction companies, revisions were then made to
the final construction plans. From this initial review, estimates exceeded $50,000; therefore a
procurement package was put together and sent out for public review. There was only one bid
received by the due date of January 6, 2023. There was other interest, but no other bids were
received. Adam Bolton Construction, along with IBEX Builds, in the amount of $76,870.77,
was our one and only bid.
Fiscal Impacts
The project was approved with the capital projects for the FY 2022-2023 budget in the amount
of $75,000. The bid exceeds this by $1,870.77. This overage will be covered by an unallocated
matching grant line item elsewhere in the department budget.
RECOMMENDATION
Staff recommends Council approval for both agenda items:
1. Award the low bid in the amount of $76,870.77 to Adan Bolton IBEX Builds.
2. Approve Contract for Services with Adam Bolton Construction, LLC dba IBEX Builds
Publish Dates: December 20, 2022
December 27, 2022
NOTICE TO BIDDERS
The City of Paris will receive sealed bids at the Office of the City Manager, City of Paris, 135 1"
S.E., P.O. Box 9037, Paris, Texas 75461-9037, for Farmers Market Restrooms and Food Truck
Court.
Bids will be received until 3:00 P.M. on Friday, January 6, 2023, at which time all bids will be
publicly opened at the City of Paris, Council Chambers, 107 E. Kaufman Street, Paris, Texas, read
aloud, tabulated and referred to the City Council for consideration. All bids must be submitted
on the City of Paris form(s). Clearly mark on the outside of the envelope "Farmers Market
Restrooms and Food Truck Court."
Information, specifications and bid forms may be obtained at the Community Development, 150
Southeast First Street, Paris, Texas 75460.
The City of Paris reserves the right to reject any and all bids, to waive any informality in bidding
and to award bids as may be advantageous to the City. Bids received after the deadline will be
returned to vendor unopened.
IBullds903-517-5591
Bldder.BFX
No 'NSCRIPTI60
_ 4uAHm
UNIrPRICE
BID NCiES
1 1TAPS & PERMITS
-
$ Assumed that associated City fees are waived
2 ITRASH CONTAINER
4.0
810.00
$ 3,240.00 Includes all SWPPP
3 DEMO & HAUL OFF
1.0
2,350.00
$ 2,350.00
4 DIRT WORK_
20.0
200.00
$ 4,000.00 Select -fill grade in fill
5 DRAINAGE
$
6 I- URVEYING
-
$
7 1CONCRETESLAB
1_20.0
30.00
$ 3,600.00
8 PLUMBING
1.0
13,375.00
_
$ 13,375.00 Assumed that water and electric are sharing food truckpedestal
9 ELECTRICAL
1.0_
20,347.04
$ 20,347.04 Assumed that water and electric are sharing food truck pedestal
101HVAC/VENTING
1.0
2,537.64
$ 2,537.64
31 (BUILDING MATERIAL
120.0
86._72
$ 10,406.21
12 MING LABOR
120.0
33.33
$ 4,000.00
13 ROOFING
2.0
1,979.88
$ 3,959.76 Color to be chosen ASAP
14 INSULATION
1.0
750.00
$ 7_50.00
15 GYPSUM BOARD LABOR
1.0
1,350.00
$ 1,350.00
16 IQUARRYTILE BASE
55.0
30.00
$ 1,650.00
17 TAPE, BED, PAINTING
1.0
4,055.12
$ 4,055.12 Color to be chosen ASAP
18 CLEAN UP
1.0
2,000.00
$ 2,000.00
19 CONTRACTOR FEE
4.0
500.00
$ 2,000.00 First 50% of Bid Price will be billed after framing and mechanical
inspections, final 50% will be billed after final inspection
TOTAL BID PRICE
$ 79,620.77
DELETE QUARRY TILE BASE
AIt1IIN LIEU OF WIDER SLAB LIP 55.00
AIt2 iSMART LP SIDING IN LIEU OF 1.00
HARDIE BOARD
Completion date 04/29/2023
Erosion control needs to be installed
(30.00) $ (1,650.00)
(1,100.00) $ (1,100.00)
�P
IBEX Builds
PO Box 1260
Paris, TX 75461
903-517-6591
adam@bexbuilds.com
ESTIMATE # 1346
DATE 01/01/2023
EXPIRATION DATE 01/09/2023
COSTCODE
0E.Cli ,11 IP10f111
01y
VL'r -B—
AMOUi`kIT
Site Samces
TAPS & PERMITS - assumed that associated City fees
0
0.00
0.00
are waived
She Services
TRASH CONTAINER - includes all SWPPP
4
310.00
3,240.00
Site Senticas
DEMO & HAUL OFF -
1
2,350.00
2„350.00
Vertical
DIRT WORK - select -fill grade infill is be used
20
200000
4,000®00
Construction
vertical
CONCRETE SLAB - per s
120
30.00
31600.00
construction
Vertical
PLUMBING - assumed that water and electric are
1
13,375.00
13.375.00
Construction
sharing food truck pedestal
Ver#cal
ELECTRICAL - assumed that water and electric are
1
20,347.04
20,347.04
Can aloe
sharia food truck pedestal
Vertical
HVACIVE INKS - per spec
1
2,537.64
2„537.64
Construon
Vertical
BUILDING MATERIAL - per spec
120
36.72
10,406.40
Construction
Vertical
FRAMING LABOR
120
333333333
4,000.00
Construction
Vertical
ROOFINGcolors to be chosen ASAP after contracting
2
1,979.66
3,959.76
Construction
Vertical
INSULATION - per spec
1
750°00
7160.00
Construction
vsrdcal
GYPBOARDLABOR
I
1,350.00
1,350.00
Construction
Vertical
QUARRY TILE BASE
55
30.00
1,650.00
Construction
Verlicall
TAPE, BED, PAINT - colors to be chosen ASAP after,
1
4,055.12
4,055.12
Gonstrucdon
co wing
Sita Services
CLEAN BJP - maks ready for turns over after final
1
2,000°00
2,000.00
inspections
Contractor Fee
CONTRACTOR FEE - ffrst 50V6 of Bid Price will be
4
500°00
2,000.00
billed after passing framing and reach ical
IBEX Builds accepts no liability for structural design. We will not be responsible for displacement of the foundation due Ito ground movements
and changes of
the sail structure. These factors are beyond our control, We also recommend that the foundation be designed by a qualified
engineer to most the requirements of the sail conditions and structure loads.
Y
COST CODE DESCRIPTION
Inspections, final 50% Will be billed after final inspection
Discount ALT 1 - delete quant' file in lieu of wider slab lip with Z -
Flashing
Discount ALT 2 - use Smart LP siding In Ileu of Hardie Board
Thank you for the opportun4 to earn your business[
Accepted By
TOTAL
A
Subtotal: 79,620.96
55 -30.00 -1,650.00
1 -1,100.00 -1,100.00
$76,870.96
Accepted Date
IBEX Builds accepts no riablity for structural design. We will not be responsible for displacement of the foundation due to ground movements
and changes of the soil structure. These factors are beyond our control. We also recommend that the foundation be designed by a qualified
engineer to meet the requirements ofihe soil conditions and structure loads.
2�_STREET TW
UD 9]".Y.. BOLLARD DETAIL
....... . .....
. ...... - - ----------
IST S I REETIRW
)0VLRALL_ENNERS M RK SITE PLAN
1---A ". El ....... ... —
BUILDING DATA STATEMENT OF INTENT CODES AND REGULATIONS
— — - ---------- . .... . ...... .. ....... - — -----
'=" 119 totxerouowwamoE.s.
ro.erauv mot
pu
. ... . ... . ... . ...
. .................. . . . ..................
I II 11
I II 11
-------------- - - -
('�'jf-M9UJT-lQN ftAN
II
C2Vj E_'E V NTIQN
(4 NQ TH...EdYEvT1Q_�d.
�mmnannme
ai Y
i u nu��tl=w� M
C:..
yIIIII _ -_.__
-�-- b� I��tlA��`�P.
Eve ,M `R}9_.
� Y
Uf47, IY'tE tuAIC-'� HfN�R05'.H � �
TOILET PLAN, TYPICAL TOILET I GRAB BAR TYPICAL LAV
CC`ti.Evk+T14.N is" AQ�ES. Sl@9�O DIAGRAMS
J SgtE: I„' e 1'-L ,._r E c S,a• . ,'-M ......
- ------------- . .... ...wn
wz,y.-.,`
—PON -7. HVAC
V-
0 -,—es
- - - - --------- -
I.J."Ob
is S 55
FkQPR-YLAN– 7 DOMUJI�', WATER Z,FLQQ& —PLAN. RLOMOINQ WAsTF ANDVENT
wz,y.-.,`
—PON -7. HVAC
V-
0 -,—es
- - - - --------- -
I.J."Ob
is S 55
FkQPR-YLAN– 7 DOMUJI�', WATER Z,FLQQ& —PLAN. RLOMOINQ WAsTF ANDVENT
ELAN ELECTRICA�,
WS„qALLry
LL. 7- ELF-MOC-A-L
ci)w 'Ca
m x
LL w
LL
A
--- ------------ ----
.NEL 7T
gp_
RT
.. . . . ........
PANEL -Pl-
? �z
44
:Nll,
NY...
...
. ....
.. .
7777"",
F."Aft-MIMM-49FAV-1
PANEL 'P2'
�U
. ........ . .......
. . ..... ..... . . LIU
ELECTRICAL LOAD ANALYSIS
............... - . . .. . . . .................. .. ......
LIGHTING FIXTURE SCHEDULE
wnrl
1«M1 110Y. TT K
.... ..................... ....... . .....
Off, aa,«a.oaxasa,l-4T=—
(ELEURICAL F41SER DIAQRAM
D.— ..
THE STATE OF TEXAS §
COUNTY OF LAMAR §
THIS CONTRACT is entered into on this _ m day of m _ , 2023,
by and between the CITY OF PARIS, TEXAS, a municipal corporation located in Lamar
County, Texas, (hereinafter referred to as "CITY"), acting by and through its City
Manager or his designee, and ADAM BOLTON CONSTRUCTION, LLC D/B/A IBEX
BUILDS ("hereinafter referred to as "CONTRACTOR") whose address is 242 CR 11400,
Paris, Texas, 75462.
WITNESSETH:
WHEREAS, CITY desires to obtain services from CONTRACTOR for the construction
of bathroom facilities and food truck court at the CITY's Farmer's Market
Park.
WHEREAS, CONTRACTOR is qualified to provide such services and is willing to
undertake the performance of such services for CITY in exchange for fees
hereinafter specified;
NOW, THEREFORE,
THAT IN CONSIDERATION of the covenants and agreements hereinafter contained
and subject to the terms and conditions hereinafter stated, the parties hereto do mutually
agree as follows:
I.
EmL)loment of Contractor
CONTRACTOR will perform as an independent contractor all services under this
Contract to the prevailing professional standards consistent with the professional level of
care and skill ordinarily provided by competent members of its profession, both public
and private, currently practicing in the same or similar locality under the same or similar
circumstances. If CONTRACTOR is representing that it has special expertise in one or
more areas to be utilized in this Contract, then CONTRACTOR agrees to perform those
special expertise services to the appropriate local, regional and national professional
standards.
II.
Scope of Services
CONTRACTOR shall perform the following services:
Attachment A: Construction of restroom facilities and food truck court at the
Farmer's Market Park.
Attachment A is hereby incorporated herein by reference and made a part hereof as if
written word for word. However, in case of conflict in the language of Attachment A and
this Contract, the terms and conditions of this Contract shall be final and binding upon
both parties hereto.
III.
Pa anent for Services
Total payment for services described herein shall be in accordance with
Attachment A in the amount of SEVENTY-SIX THOUSAND, EIGHT HUNDRED
SEVENTY DOLLARS AND 96/100 CENTS ($76,870.96). This total payment for
services includes CONTRACTOR's ordinary expenses such as salary costs, overhead,
direct expenses and profit. Additional expenses, which are extraordinary in nature, shall
be approved in advance by CITY in writing signed by the parties. Such extraordinary
expenses may be paid as incurred and billed to the CITY pursuant to this Contract over
and above the total payment amount identified in this provision. Any extraordinary
expenses not approved in writing in advance by the CITY shall remain the sole
responsibility of the CONTRACTOR.
CONTRACTOR will bill CITY monthly. Each invoice shall provide supporting
information describing the work completed. If additional services or expenses are
requested, CONTRACTOR will not provide such additional services until authorized by
CITY in writing to proceed. The scope of services shall be strictly limited. CITY shall
not be required to pay any amount in excess of the amount identified in the preceding
paragraph unless CITY shall have approved in writing in advance (prior to the
performance of additional work) the payment of additional amounts.
Within thirty (30) days of receipt of each such invoice, CITY shall make payment
in the amount shown by CONTRACTOR's approved statements and other documentation
submitted. Such payments shall be subject to the Texas Prompt Payment Act, Texas
Government Code §§ 2251.001, et seq.
Nothing contained in this Contract shall require CITY to pay for any work that is
unsatisfactory as determined by CITY or which is not submitted in compliance with the
terms of this Contract, nor shall failure to withhold payment pursuant to the provisions
of this section constitute a waiver of any right, at law or in equity, which CITY may have
if CONTRACTOR is in default, including the right to bring legal action for damages or
for specific performance of this Contract. Waiver of any default under this Contract shall
not be deemed a waiver of any subsequent default.
CITY reserves the right to revise or expand the scope of services after due approval
by CITY as CITY may deem necessary, but in such event CITY shall pay CONTRACTOR
equitable compensation for such services. In any event, when CONTRACTOR is directed
to revise or expand the scope of services under this Section of the Contract,
CONTRACTOR shall provide CITY a written proposal for the entire cost involved in
performing such additional services. Prior to CONTRACTOR undertaking any revised
or expanded services as directed by CITY under this Contract, CITY must authorize in
writing the nature and scope of the services and accept the method and amount of
compensation and the time involved in all phases of the Project.
It is expressly understood and agreed by CONTRACTOR that any compensation
not specified in Paragraph III hereinabove may require approval by the City Council and
is subject to the current budget year limitations.
This Contract shall begin on the date first written above.
The CONTRACTOR shall commence services upon execution of this Contract.
Unless terminated, or unless the Scope of Services and Time of Performance are changed
in accordance with Article XV, Changes, the CONTRACTOR shall complete the Scope
of Services provided under Article 11 by May 29, 2023.
The completion schedule set for in this Article may be subject to causes that result
in delay over which neither CONTRACTOR nor the CITY has any control. Notification
and justification for any such delays identified by the CONTRACTOR must be made in
writing and approved by the CITY. The schedule of work will be extended to include
any such delays pursuant to Article XV, Changes.
V®
Contract Termination Provision
This Contract may be terminated at any time by CITY for any cause by providing
CONTRACTOR thirty (30) days written notice of such termination. Upon receipt of such
notice, CONTRACTOR shall immediately terminate working on, placing orders or
entering into contracts for supplies, assistance, facilities or materials in connection with
this Contract and shall proceed to promptly cancel all existing contracts insofar as they
are related to this Contract. The CITY will only be obligated to compensate the
CONTRACTOR in a just and equitable manner for those services performed prior to the
effective date of termination and upon the CONTRACTOR's submitting a statement of
actual services performed and payment requested.
VII.
Ownershi of Documents
All materials and documents prepared or assembled by CONTRACTOR under this
Contract shall become the sole property of CITY and shall be delivered to CITY without
restriction on future use. CONTRACTOR may retain in its files copies of all drawings,
specifications and all other pertinent information for the work. CONTRACTOR shall
have no liability for changes made to any materials or other documents by others
subsequent to the completion of the Contract.
VIII.
Insurance Requirements
Before commencing work, the CONTRACTOR shall, at its own expense, procure,
pay for and maintain during the term of this Contract insurance in accordance with the
requirements set forth in Attachment B hereto, written by companies approved by the
State of Texas, and acceptable to the City of Paris. The CONTRACTOR shall furnish to
the City Clerk copies of the insurance policies required herein stating coverages, limits,
expiration dates and compliance with all applicable required provisions. Policies shall
reference the project and be addressed as follows:
City of Paris
150 SE First St
Paris TX 75460
IX.
Right to Inspect Records
CONTRACTOR agrees that CITY shall have access to and the right to examine
any books, documents, papers and records of CONTRACTOR involving transactions
relating to this Contract. CONTRACTOR agrees that CITY shall have access during
normal working hours to all necessary CONTRACTOR facilities and shall be provided
adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. CITY shall give CONTRACTOR reasonable advance notice
of intended audits.
CONTRACTOR further agrees to include in subcontract(s), if any, a provision that
any subcontractor agrees that CITY shall have access to and the right to examine any
directly pertinent books, documents, papers and records of such engineer or sub-
contractor involving transactions to the subcontract, and further, that CITY shall have
access during normal working hours to all such sub -contractor facilities and shall be
provided adequate and appropriate work space, in order to conduct audits in compliance
with the provisions of the paragraph. CITY shall give any such sub -contractor reasonable
advance notice of intended audits.
X.
Successors and Assigns
CITY and CONTRACTOR each bind themselves and their successors, executors,
administrators and assigns to the other party to this contract and to the successors,
executors, administrators and assigns of such other party in respect to all covenants of
this Contract. Neither CITY nor CONTRACTOR shall assign or transfer its interest
herein without the prior written consent of the other.
XI.
Contractor's Liability and Warrant
Acceptance of the final work by the CITY shall not constitute nor be deemed a
release of the responsibility and liability of CONTRACTOR, its employees, associates,
agents or CONTRACTORS for the acceptable completeness of the work; nor shall such
acceptance be deemed an assumption of responsibility by CITY for any defect in the
work; nor shall such acceptance be deemed an assumption of responsibility by CITY for
any defect in the work prepared by said CONTRACTOR, its employees, associates,
agents or subcontractors.
CONTRACTOR herein provides a one (1) year warranty on workmanship and a
five (5) year warranty on the plaster. CONTRACTOR further provides a thirty (30) day
warranty on tile, brick, and rock repairs.
XII.
INDEMNIFICATION
CONTRACTOR DOES HEREBY COVENANT AND CONTRACT TO
WAIVE ANY AND ALL CLAIMS, AND TO RELEASE, INDEMNIFY, AND HOLD
HARMLESS THE CITY, ITS CITY COUNCIL, OFFICERS, EMPLOYEES, AND
AGENTS, IN BOTH THEIR PUBLIC AND PRIVATE CAPACITIES, FROM AND
AGAINST ALL LIABILITY, CAUSES OF ACTION, CITATIONS, CLAIMS,
COSTS, DAMAGES, DEMANDS, EXPENSES, FINES, JUDGMENTS, LOSSES,
PENALTIES OR SUITS, WHICH IN ANY WAY ARISE OUT OF, RELATE TO, OR
RESULT FROM CONTRACTOR'S PERFORMANCE UNDER THIS CONTRACT
AND WHICH ARE CAUSED BY THE INTENTIONAL WRONGFUL ACTS OR
NEGLIGENT ACTS OR OMISSIONS OF CONTRACTOR OR CONTRACTOR'S
SUBCONTRACTORS AND THE OFFICERS, AGENTS OR EMPLOYEES OF
EITHER CONTRACTOR OR CONTRACTOR'S SUBCONTRACTORS (THE
"INDEMNIFIED ITEMS") SUBJECT TO THE LIMITATIONS IN TEXAS LOCAL
GOVERNMENT CODE § 271.904 AND TEXAS CIVIL PRACTICE AND
REMEDIES CODE, § 130.002(B).
BY WAY OF EXAMPLE, THE INDEMNIFIED ITEMS MAY INCLUDE
PERSONAL INJURY AND DEATH CLAIMS AND PROPERTY DAMAGE
CLAIMS, INCLUDING THOSE FOR LOSS OF USE OF PROPERTY, AS WELL
AS INTELLECTUAL PROPERTY INFRINGEMENT OR FAILURE TO PAY A
SUBCONTRACTOR OR SUPPLIER.
INDEMNIFIED ITEMS SHALL INCLUDE REASONABLE ATTORNEYS'
FEES AND COSTS, COURT COSTS, AND SETTLEMENT COSTS.
INDEMNIFIED ITEMS SHALL ALSO INCLUDE ANY EXPENSES, INCLUDING
REASONABLE ATTORNEYS' FEES AND EXPENSES, INCURRED BY AN
INDEMNIFIED INDIVIDUAL OR ENTITY IN ATTEMPTING TO ENFORCE
THIS INDEMNITY.
XIII.
Independent Contractor
CONTRACTOR's status shall be that of an Independent Contractor and not an
agent, servant, employee or representative of CITY in the performance of this Contract.
No term or provision of or act of CONTRACTOR or CITY under this Contract shall be
construed as changing that status. CONTRACTOR will have exclusive control of and the
exclusive right to control the details of the work performed hereunder, and shall be liable
for the acts and omissions of its officers, agents, employees, contractors, subcontractors
and engineers and the doctrine of respondeat superior shall not apply as between CITY
and CONTRACTOR, its officers, agents, employees, contractors, subcontractors and
engineers, and nothing herein shall be construed as creating a partnership or joint
enterprise between CITY and CONTRACTOR. CITY and CONTRACTOR shall not be
construed to be in any type of joint venture with respect to the scope of work set forth in
this Contract.
XIV.
Default
If at any time during the term of this Contract, CONTRACTOR shall fail to
commence the work in accordance with the provisions of this Contract or fail to diligently
provide services in an efficient, timely and careful manner and in strict accordance with
the provisions of this Contract or fail to use an adequate number or quality of personnel
to complete the work or fail to perform any of its obligations under this Contract, then
CITY shall have the right, if CONTRACTOR shall not cure any such default after thirty
(30) days written notice thereof, to terminate this Contract. Any such act by CITY shall
not be deemed a waiver of any other right or remedy of CITY. If after exercising any
such remedy due to CONTRACTOR's nonperformance under this Contract, the cost to
CITY to complete the work to be performed under this Contract is in excess of that part
of the Contract sum which has not theretofore been paid to CONTRACTOR hereunder,
CONTRACTOR shall be liable for and shall reimburse CITY for such excess.
CONTRACTOR'S liability under this provision shall be limited to the total dollar amount
of this Contract.
This Section XIV shall not supersede and shall be in addition to CITY's right under
Section VI to terminate this contract for any reason upon thirty (30) days' written notice
of such termination.
CITY's remedies for CONTRACTOR's default or breach under this Contract shall
be one or more of the following remedies which may be exercised separately or in
combination at CITY's sole exclusive choice:
(a) Specific performance of the Contract;
(b) Re -performance of this Contract at no extra charge to CITY; or,
(c) Monetary damages in an amount not to exceed the greater of.
(1) The amount of any applicable insurance coverage CONTRACTOR is
required to purchase and maintain under this Contract plus any deductible
amount to be paid by CONTRACTOR in conjunction with said coverage
regardless of whether CONTRACTOR has actually purchased and
maintained said coverage; or,
(2) The total dollar amount of this Contract.
The terms of Sections XII entitled Indemnification, and XVII entitled Confidential
Information shall survive termination of this Contract.
XV.
Changes
CITY may, from time to time, require changes in the scope of services to be
performed under this Contract. Such changes as are mutually agreed upon by and between
CITY and CONTRACTOR shall be incorporated by written modification to this Contract.
XVI.
Conflict of Interest
CONTRACTOR covenants and agrees that CONTRACTOR and its associates and
employees will have no interest, and will acquire no interest, either direct or indirect,
which will conflict in any manner with the performance of the services called for under
this Contract. All activities, investigations and other efforts made by CONTRACTOR
pursuant to this Contract will be conducted by employees, associates or subcontractors
of CONTRACTOR.
XVII.
Confidential Information
CONTRACTOR hereby acknowledges and agrees that its representatives may have
access to or otherwise receive information during the furtherance of its obligations in
accordance with this Contract, which is of a confidential, non-public or proprietary
nature. CONTRACTOR shall treat any such information received in full confidence and
will not disclose or appropriate such Confidential Information for its own use or the use
of any third party at any time during or subsequent to this Contract. As used herein,
"Confidential Information" means all oral and written information concerning City of
Paris, its affiliates and subsidiaries, and all oral and written information concerning CITY
or its activities, that is of a non-public, proprietary or confidential nature including,
without limitation, information pertaining to customer lists, services, methods, processes
and operating procedures, together with all analyses, compilation, studies or other
documents, whether prepared by CONTRACTOR or others, which contain or otherwise
reflect such information. The term "Confidential Information" shall not include such
materials that are or become generally available to the public other than as a result of
disclosure by CONTRACTOR, or are required to be disclosed by a governmental
authority or pursuant to a properly submitted request under the Texas Public Information
Act.
XVIII.
Mailing Address
All notices and communications under this CONTRACT to be mailed to CITY
shall be sent to the address of CITY's agent as follows, unless and until CONTRACTOR
is otherwise notified:
Grayson Path
City Manager
City of Paris
Post Office Box 9037
Paris, Texas 75461
Notices and communications to be mailed or delivered to CONTRACTOR shall be
sent to the address of CONTRACTOR as follows, unless and until CITY is otherwise
notified:
Adam Bolton Construction LLC, d/b/a IBEX Builds
P.O. Box 1280
Paris, TX 75461
Any notices and communications required to be given in writing by one party to
the other shall be considered as having been given to the addressee on the date the notice
or communication is posted, faxed or personally delivered by the sending party.
XIX.
Applicable Law
The CONTRACT is entered into subject to the Paris City Charter and ordinances
of CITY, as same may be amended from time to time, and is subject to and is to be
construed, governed and enforced under all applicable State of Texas and federal laws.
CONTRACTOR will make any and all reports required per federal, state or local law
including, but not limited to, proper reporting to the Internal Revenue Service, as required
in accordance with CONTRACTOR's income. Situs of this Contract is agreed to be
Lamar County, Texas, for all purposes, including performance and execution.
XX.
Severability
If any of the terms, provisions, covenants, conditions or any other part of this
Contract are for any reason held to be invalid, void or unenforceable, the remainder of
the terms, provisions, covenants, conditions or any other part of this Contract shall remain
in full force and effect and shall in no way be affected, impaired or invalidated.
XXI.
Remedies
No right or remedy granted herein or reserved to the parties is exclusive of any
other right or remedy herein by law or equity provided or permitted; but each shall be
cumulative of every other right or remedy given hereunder. No covenant or condition of
this Contract may be waived without written consent of the parties. Forbearance or
indulgence by either party shall not constitute a waiver of any covenant or condition to
be performed pursuant to this Contract.
XXII.
Entire A reement
This Contract embodies the complete agreement of the parties hereto, superseding
all oral or written previous and contemporaneous agreements between the parties relating
to matters herein, and except as otherwise provided herein cannot be modified without
written agreement of the parties.
XXIII.
Non -Waiver
It is further agreed that one (1) or more instances of forbearance by CITY in the
exercise of its rights herein shall in no way constitute a waiver thereof.
XXIV.
Headings
The headings of this Contract are for the convenience of reference only and shall
not affect any of the terms and conditions hereof in any manner.
XXV.
Venue
The parties to this Contract agree and covenant that this Contract will be
enforceable in Paris, Texas; and that if legal action is necessary to enforce this Contract,
exclusive venue will lie in Lamar County, Texas, or in the United States District Court
for the Eastern District of Texas, Sherman Division.
XXVI.
No Third Parte Beneficiary
For purposes of this Contract, including its intended operation and effect, the
parties (CITY and CONTRACTOR) specifically agree and contract that: (1) the Contract
only affects matters/disputes between the parties to this Contract, and is in no way
intended by the parties to benefit or otherwise affect any third person or entity
notwithstanding the fact that such third person or entity may be in contractual relationship
with CITY or CONTRACTOR or both; and (2) the terms of this Contract are not intended
to release, either by contract or operation of law, any third person or entity from
obligations owing by them to either CITY or CONTRACTOR.
XXVII
Incorporation of Provisions Re uired b= Law
Each provision and clause required by law to be inserted into the Contract shall
be deemed to be enacted herein and this Contract shall be read and enforced as though
each were included herein. If through mistake or otherwise any such provision is not
inserted or is not correctly inserted, the Contract shall be amended to make such
insertion on application by either party.
XXVIII
E" ual Em lovment O portunity
In the performance of this Contract, the CONTRACTOR will not discriminate
against any employee or applicant for employment because of race, color, religion, age,
sex, national origin or any other protected class.
XXIX
Form 1295
CONTRACTOR, in compliance with the laws of the State of Texas, will execute the Form
1295, notice of interested parties, provided by Customer for filing with the Texas Ethics
Commission.
XXX
Non-discrimination Against Israel
CONTRACTOR, in compliance with the laws of the State of Texas, agrees that it does
not and will not boycott the State of Israel
IN WITNESS WHEREOF, the parties hereto have set their hands by their
representatives duly authorized on the day and year first written above.
--------------------------------SIGNATURE PAGE FOLLOWS--------------------------------
ATTEST:
Janice Ellis
City Clerk
APPROVED AS TO FORM:
Stephanie H. Harris
City Attorney
CITY OF PARIS
GRAYSON PATH
City Manager
Date Signed:
Adam Bolton Construction
d/b/a IBEX Builds
By: Adam Bolton
Title:
[Remainder of page left blank intentionally.]
THE STATE OF TEXAS §
COUNTY OF LAMAR §
BEFORE ME, the undersigned authority, in and for said County, Texas, on this day
personally appeared GRAYSON PATH, City Manager of the CITY OF PARIS, a Texas
Municipal Corporation, known to me to be the person who's name is subscribed to the
foregoing instrument, and acknowledged to me that he has executed the same on the
City's behalf.
GIVEN UNDER MY HAND AND SEAL OF OFFICE, THIS THE
DAY OF .2023.
Notary Public Lamar County, Texas
My commission expires
THE STATE OF TEXAS §
COUNTY OF LAMAR §
This instrument was acknowledged before me on the day of u..__._�..._
2023, by Adam Bolton in his capacity as _ _ of Adam Bolton Construction
d/b/a IBEX Builds of Paris, Texas, a Texas Corporation, known to me to be the person
whose name is subscribed to the foregoing instrument, and acknowledged that he
executed the same on behalf of and as the act of
GIVEN UNDER MY HAND AND SEAL OF OFFICE, THIS THE
DAY OF , 2021
Notary Public _ County, Texas
My commission expires
Attachment A
Publish Dates: December 20, 2022
December 27, 2022
NOTICE TO BIDDERS
The City of Paris will receive sealed bids at the Office of the City Manager, City of Paris, 135 1"
S.E., P.O. Box 9037, Paris, Texas 75461-9037, for Farmers Market Restrooms and Food Truck
Court.
Bids will be received until 3:00 P.M. on Friday, January 6, 2023, at which time all bids will be
publicly opened at the City of Paris, Council Chambers, 107 E. Kaufman Street, Paris, Texas, read
aloud, tabulated and referred to the City Council for consideration. All bids must be submitted
on the City of Paris form(s). Clearly mark on the outside of the envelope "Farmers Market
Restrooms and Food Truck Court."
Information, specifications and bid forms may be obtained at the Community Development, 150
Southeast First Street, Paris, Texas 75460.
The City of Paris reserves the right to reject any and all bids, to waive any informality in bidding
and to award bids as may be advantageous to the City. Bids received after the deadline will be
returned to vendor unopened.
Bldder. IBEX Bullds 903-517-5491
No 'DESCRIPTION
1 (TAPS & PERMITS
2 (TRASH CONTAINER
3 DEMO & HAUL OFF
4 DIRT WORK_
5 DRAINAGE
6 SURVEYING
7 (CONCRETE SLAB
B PLUMBING
9 ELECTRICAL
10 I HVAC/VENTING
11 1 BUILDING MATERIAL
12 jFRAMFWGIABO4
13 ROOFING
14 INSULATION
15 GYPSUM BOARD LABOR
16 QUARRY TILE BASE
17 TAPE, BED, PAINTING
18 CLEAN UP
19 (CONTRACTOR FEE
TOTAL BID PRICE
Altl DELETE QUARRY TILE BASE
IN LIEU OF WIDER SLAB LIP
iSMART LP SIDING IN LIEU OF
Alt2 HARDIE BOARD
4i;ANn4
UNRPRICE
AID NOTEi
-
$ Assumed that associated City fees are waived
4.0
810.00
$ 3,240.00 Includes all SWPPP
1.0
2,350.00
$ 2,350.00
20.0
200.00
$ 4,000.00 Select -fill grade In fill
120.0
30.00
$ 31600.00
1.0
13,375.00
_
$ 13,_375.00 Assumed that water and electric are sharing food truck pedestal
1.0
20,347.04$
_
20,347.04 Assumed that water and electric are sharing food truck pedestal
2,537.64 -'$-'
. $- 2,537.64 -
_1.0
120.0
86.72
$ 10,406.21
120.0
33.33
$ 4,000.0
2.0
_
1,979.88
- -
S 3,959.76 Color to be chosen ASAP
1.0
750.00
$ 7_50.00 -
1.0
1_,350.0_0
$ 1,350.00
55.0
30.00
$ 1,650.00
1.0
4,055.12
$ 4,055.12 Color to be chosen ASAP
1.0
2,000.00
$ 2,000.00
4.0 500.00 $ 2,000.00 First 50% of Bid Price will be billed after framing and mechanical
inspections, final 50%will be billed afterfinal inspection
$ 79,620.77
55.00 (30.00) $ (1,650.00)
1.00 (1,100.001 $ (1,100.00)
AI''I yV
Completion date 04/29/2023
Erosion control needs to be installed
IBEX Builds
PO Box 1280
Paris, TX 75461
903-517-5591
adam@Ibexbuilds.com
ADDRESS
City of Paris - Customer
1351 at S.E. Street
Paris, TX 75460
ESTIMATE # 1348
DATE 01/01/2023
EXPIRATION DATE 01/09/2023
COST CODE
LF"rCMT 7ha1'i
9 %.''
0 0;7
Ah ; U114T
Site Services
TAPS & PERMITS - assumed that associated City fees
0
0.00
0.00
are waived
Site Services
TRASH CONTAINER - Includes all SWPPP
4
810.00
3,240.00
Site Services
DEMO & HAUL OFF -
1
2,350.00
2,350.00
Vertical
DIRT WORK - select -fill grade infill to be used
20
200.00
4,000.00
Construction
Vertical
CONCRETE SLAB - per spec
120
30.00
3,600.00
Construction
Vertical
PLUMBING - assumed that water and electric are
1
13,375.00
13,375.00
Construction
sharing food truck pedestal
Vertical
ELECTRICAL - assumed that water and electric are
1
20,347.04
20,347.04
Construction
sharing food truck pedestal
Vertical
HVACNENTING - per spec
1
2,537.64
2,537.84
Construction
Vertical
BUILDING MATERIAL - per spec
120
86.72
10,406.40
Construction
Vertical
FRAMING LABOR
120
33.3333333
4,000.00
Constructlon
Vertical
ROOFING - colors to be chosen ASAP after contracting
2
1,979.88
3,959.76
Construction
Vertical
INSULATION - per spec
1
750.00
750.00
Construction
Vertical
GYP BOARD LABOR
1
1,350.00
11350.00
Constriction
Vertical
QUARRY TILE BASE
55
30.00
11650.00
Construction
Vertical
TAPE, BED, PAINT - colors to be chosen ASAP after
1
4,055.12
4,055.12
Construction
contracting
Site Services
CLEAN UP - make ready for turn over after final
1
2,000.00
2,000.00
Inspections
Contractor Fee
CONTRACTOR FEE - first 50% of Bid Price will be
4
500.00
21000.00
billed after passing framing and mechanical
IBEX Builds accepts no liabilfty for structural design. We will not be responsible for displacement of the foundation due to ground movements
and changes of
the soil structure. These factors are beyond our control. We also recommend that the foundation be designed by a qualified
engineer to meet the requirements of the son conditions and structure loads.
Y
COST CODE DESCRIPTIO14
Inspections, final 50% will be billed after final Inspection
Dlscount ALT t - delete quant' file in lieu of wider slab lip with Z -
flashing
Discount ALT 2 - use Smart lP siding in lieu of Hardie Board
Thank you for the opportunity to earn your business!
Accepted By
TOTAL
077 RATE
r? MOUNT
Subtotal: 79,620.96
55 -30.00 -1,650.00
1 -1,100.00 -1,10D.00
$76,870.96
Accepted Date
IBEX Builds accepts no liability for structural design. We will not be responsible for displacement of the foundation due to ground movements
and changes of the soil structure. These factors are beyond our control. We also recommend that the foundation be designed by a qualified
engineer to meet the requirements oflhe soil conditions and structure loads.
H
HIM SIR
>All
JAI
0
T
15
z
. ....
M
z
00
0
rn
m
Rs
D
0
N
. ....... .. ...
ji:
so
9 z
V
lip;
- - - - - - - Lj L
0
X
-0
>
z
PR 1 0 1 j MAW
Farmers Market Toilet Facilities
The City of Paris, Texas
. .......... .. .. ........ISnEET TITLE
ARCHITECTURAL FLOOR PLAN I SITE PLAN
MM
10
O
0
2
'Adi"11. CA.
ARCHITECTURE1
12 -C+ -2D22
>All
JAI
T
15
. ....
..... . .......
. ....... .. ...
ji:
so
9 z
V
lip;
- - - - - - - Lj L
0
X
-0
>
z
PR 1 0 1 j MAW
Farmers Market Toilet Facilities
The City of Paris, Texas
. .......... .. .. ........ISnEET TITLE
ARCHITECTURAL FLOOR PLAN I SITE PLAN
MM
10
O
0
2
'Adi"11. CA.
ARCHITECTURE1
12 -C+ -2D22
14 '"il
um
C9
t
A
5$¢ � Hill,$ is
a8 H ani€8 P ¢33 A i $ �a
f
A
EVISIONS mm,,,, ,,.. PROJECT NAVE
R°"°°"""� Farmers Market Toilet Facilities `'
arromasxJa+wwenCou.
DITECs"rr''W The City of Paris, Texas R �IARCX
TORE
_ „�,�
r IN � .. ..,. .,_ sw'ein-BUILDIING SECTION
..•, k w.
AND ELEVATIONS°.
m p
e0
30
�i
•
b
i
0 o811
�.
�
R
33ptt IlRRR
P w
ED
t
1
•'V w
�.£='ytlfl'FEl'BOIIf4A-0LIDIi
6 'W OE
Farmers Market Toilet Facilities
The City of Paris, Texas
MECHANICAL AND PLUMBING
.E
All
9111
'15
A
�i
�i
•
�a
i
�.
�
R
33ptt IlRRR
P w
ED
i�
'I
i B
•'V w
�.£='ytlfl'FEl'BOIIf4A-0LIDIi
6 'W OE
Farmers Market Toilet Facilities
The City of Paris, Texas
MECHANICAL AND PLUMBING
.E
All
9111
'15
A
•
i
ED
i�
'I
i B
•'V w
�.£='ytlfl'FEl'BOIIf4A-0LIDIi
6 'W OE
Farmers Market Toilet Facilities
The City of Paris, Texas
MECHANICAL AND PLUMBING
.E
All
9111
'15
A
D
n
�
n
%
�
. . . ..... . ....... . Farmers Market Toilet Facilities 'OWC ENGINEERING, LLC
The City of Paris, Texas
ELECTRICAL PLANS
IN
A
IN I
€1 t
Farmers Market Toilet Facilities
The City of Pans, Texas
ELECTRICAL RISER & SCHEDULES
DWC ENGINEERING, LLC
33171UGGEMM.
Q w.
` DH-w
A l1111 EGRRGLLMN
TR.—
TRFIW IFT
-
uw. wva+
.c.0ew0pnne+n wG]6�e0id6B
Attachment B
INSURANCE REQUIREMENTS
1. General Insurance Re uirements:
1.1 The Contractor shall not start work under this Contract until the Contractor
has obtained at his own expense all of the insurance called for hereunder
and such insurance has been approved by the City; nor shall the Contractor
allow any subcontractor to start work on any subcontract until all insurance
required of the subcontractor has been so obtained and approved by the
Contractor. Contractor must submit appropriate certificates of insurance
detailing the required coverage before the contract can be awarded. In
certain instances, properly signed policy endorsements and/or certified
copies of insurance policies showing the required coverage will be required.
1.2 The Contractor shall require all subcontractors to maintain during the term
of this agreement, Commercial General Liability insurance, Business
Automobile Liability insurance, and Workers' Compensation and
Employer's Liability insurance, in the same manner as specified for the
Contractor. The Contractor shall furnish subcontractors' certificates of
insurance to the City immediately upon request.
1.3 All insurance policies required hereunder shall be endorsed to include the
following provision: "It is agreed that this policy is not subject to
cancellation, non -renewal, material change, or reduction in coverage until
ten (10) days prior written notice has been given to the City Engineer, City
of Paris".
1A No acceptance and/or approval of any insurance by the City shall be
construed as relieving or excusing the Contractor, or the surety, or its bond,
from any liability or obligation imposed upon either or both of them by the
provisions of the Contract Documents.
1.5 The City of Paris (including its elected officials, officers and employees) is
to be named as an additional insured under all insurance policies under this
Contract except Workers' Compensation and Automobile Liability, and the
certificate of insurance, or the certified policy, if requested, must so state.
Coverage afforded under this paragraph shall be primary as respects the
City, its elected officials, officers and employees.
1,6 The Contractor shall provide insurance coverage for this contract and/or
project as specified in the "Insurance Checklist" attached hereto. Full limits
of insurance required by the checklist attached shall be available for claims
1
arising out of this contract and/or project. A copy of the insurance policies
and/or endorsements issued for this project or properly executed Acord
Certificate shall be submitted to the City prior to commencement of work.
1.7 The Contractor covenants to save, defend, hold harmless and indemnify the
City and its elected officials, officers and employees (collectively the
"City") from and against any and all claims, loss, damage, injury, cost
(including court costs and attorney's fees), charges, liability or exposure,
however caused, resulting from or arising out of or in any way connected
with the Contractor's performance or non-performance of the terms of the
Contract Documents or its obligations under the Contract. This
indemnification shall continue in full force and effect until the Contractor
completes all of the work required under the Contract, except that
indemnification shall continue for all claims involving products or
completed operations after final acceptance of the work by the City for
which the City gives notice to the Contractor after the City's final
acceptance of the work.
1.8 The Contractor shall be responsible for the work performed under the
contract and every part thereof, and for all materials, tools, equipment,
appliances, and property of any and all descriptions used in connection with
the work. The Contractor assumes all risks for direct and indirect damage
or injury to the property or persons used or employed on or in connection
with the work contracted for, and of all damage or injury to any person or
property wherever located, resulting from any action, omission,
commission or operation under the Contract, or in connection in any way
whatsoever with the contracted work, until final acceptance of the work by
the City.
1.9 Insurance coverage required in these specifications shall be in force
throughout the Contract Term. Should the Contractor fail to provide
acceptable evidence of current insurance within seven (7) days of written
notice at any time during the Contract Term, the City shall have the absolute
right to terminate the Contract without any further obligation to the
Contractor, and the Contractor shall be liable to the City for the entire
additional cost of procuring performance and the cost of performing the
incomplete portion of the Contract at time of termination.
1.10 Contractual and other liability insurance provided under this Contract shall
not contain a supervision, inspection or engineering services exclusion that
would preclude the City from supervising or inspecting the project as to the
end result. The Contractor shall assume all on-the-job responsibilities as
to the control of persons directly employed by it and of the subcontractors
and any persons employed by the subcontractor.
2
1.11 Nothing contained in the specifications shall be construed as creating any
contractual relationship between any subcontractor and the City. The
Contractor shall be as fully responsible to the City for the acts and
omissions of the subcontractors and of persons employed by them as it is
for acts and omissions of persons directly employed by it.
1.12 Precaution shall be exercised by the Contractor at all times for the
protection of persons, (including employees) and property. All existing
structures, utilities, roads, services, trees and shrubbery shall be protected
against damage or interruption of service at all times by the Contractor and
its subcontractors during the term of the Contract, and the Contractor shall
be held responsible for any damage to property occurring by reason of its
operation on the property.
1,13 All required insurance coverage must be acquired from insurers authorized
to do business in the State of Texas and acceptable to the City. The City
prefers that all insurers also have a policyholder's rating of "A-" or better,
and a financial size of "Class VI" or better in the latest edition of A.M. Best,
or A or better by Standard and Poors; exceptions to this policy may only be
approved in writing by the City Manager or City Finance Director.
1,14 The City will consider deductible amounts as part of its review of the
financial stability of the bidder. Any deductibles shall be disclosed in the
Checklist and all deductibles will be assumed by the Contractor.
Contractor/Vendor may be required to provide proof of financial ability to
cover deductibles, or may be required to post a bond to cover deductibles.
2. Contractor's Insurance - "Occurrence" Basis:
2.1 The Contractor shall purchase the following insurance coverage, including
the terms, provisions and limits shown in the Checklist.
2.1.1 Commercial General Liability -Such Commercial General Liability policy shall
include any or all of the following as indicated on the Checklist:
i. General aggregate limit is to apply per project.
ii. Premises/Operations:
iii. Actions of Independent Contractors;
iv. Products/Completed Operations to be maintained for one year.
Final completion and acceptance of the work, with evidence of same
filed with owner.
3
V. Contractual Liability including protection for the Contractor from
claims arising out of liability assumed under this contract;
vi, Personal hijury Liability including coverage for offenses related to
employment;
vii. Explosion, Collapse, or Underground (XCU) hazards; if applicable.
Coverage required for any and all work involving drilling,
excavation, etc.
2,1 m2 Business Automobile Liability including coverage for any owned, hired, or
non -owned motor vehicles and automobile contractual liability.
2.1.3 Workers' Compensation - statutory benefits as required by the State of
Texas, or other laws as required by labor union agreements, including
Employers' Liability coverage.
2.2 Owner's Protective Liability Insurance:
In addition to the insurance described above, the Contractor shall obtain,
pay for and maintain at all times during the prosecution of the work under
the contract, an owner's protective liability insurance policy naming the
Owner and Engineer as insured for property damage and bodily injury,
including death, which may arise in the prosecution of the work or
Contractor's operation under this contract. Coverage shall be on an
"occurrence" basis, and the policy shall be issued by the same insurance
company that carries the Contractor's liability insurance.
Limits of liability shall be as follows:
Bodily Injury $500,000 each occurrence
Property Damage $500,000 each occurrence
4
INSURANCE CHECKLIST
Construction Projects
("X" means the coverage is required.)
Coverage„ Required
X 1. Workers' Compensation &
Employers' Liability
disease
2. For Future Use
3. City Approved Alternative
program
Workers' Comp. Program
X 4. General Liability
X 5. General aggregate applies
per project (CGL)
X 6. Premises/Operations
X 7. Independent Contractors
X 8. Products
X 9. Completed Operations
X 10. Contractual Liability
X 11. Personal Injury Liability
X 12. XCU Coverages
X 13. Automobile Liability
Property
Limits ffigyres Denote Minimums'
Statutory limits of State of Texas
$100,000 accident $100,000
$500,000 policy limit disease
$150,000 medical, safety
Minimum $500,000 each incident
$1,000,000 occurrence
Complete entry No. 26
(Items No. 3-10 & 12 require)
$500,000, combined single limit
for bodily injury and property damage
damage each occurrence with
$1,000,000 general aggregate that
applies to project under contract
$500,000 each offense & aggregate
$500,000 Bodily Injury &
X 14. Owned, Hired & Non -owned Damage each accident
15. Motor Carrier Act Endorsement
16. Professional Liability
17. Garage Liability
18. Garage keepers' Legal
X 19. Owners Protective
Liability
$500,000 Bodily Injury &
Property Damage each accident.
$ BI & PD each occurrence
$ - Comprehensive
$ - Collision
$500,000 Combined single limits
X 20. City named as additional insured on other than W/C and Auto. This coverage is
primary to all other coverages the City may possess.
X 21. City provided with Waiver of Subrogation on Workers' Compensation or
Alternative program if applicable.
X 22. Ten (10) days notice of cancellation, non -renewal, material change or coverage
reduction endorsement required. The words "endeavor to" and "but failure" (to end of
sentence) are to be eliminated from the Notice of Cancellation provision on standard
ACORD certificates.
X 23. The City of Paris prefers an A.M. Best's Guide Rating of "A-", "VI" or better or
Standard and Poor's Rating AA or better; authorized to do business in the State of Texas
(not applicable for workers' compensation assigned through pool or alternative
compensation programs).
X 24. The Certificate must state bid number and bid title or project name.